X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515040410000

Well Details

Well ID: 0515040410000
Loading map...
Location: 00/10-04-051-04W5/0
Location Alias: 00/10-04-51-04 W5M
Location Alias 2: 00/10-04-051-04 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 04
Section: 04
County/Municipality: Parkland County
Well Name: ANDEX ET AL HIGHVALE 10-4-51-4
Operator Name: New Star Energy Ltd.
License Number: 0060839
License Date: 1976-10-27
License Status: Abandoned
Spud Date: 1976-10-30
Final Drill Date: 1976-11-07
Well Total Depth: 1642.30 m
Surface Hole Latitude: 53.375472
Surface Hole Longitude: -114.527176

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-10-27 Obtained License
1976-11-02 Drill Stem Test Performed
1976-11-07 Drill Stem Test Performed
1976-11-07 Finished Drilling
1976-11-07 Well Mode changed to Drilled and Cased
1976-11-08 Drill Stem Test Performed
1976-11-09 Drill Stem Test Performed
1976-11-10 Production Casing Operation Performed
1976-11-19 Perforation Treatment Performed - Jet Perforation
1976-11-20 Perforation Treatment Performed - Jet Perforation
1976-11-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-12-15 Well Began Production
1976-12-15 Well Fluid changed to Crude Oil
1976-12-15 Well Mode changed to Flowing
1978-09-26 Perforation Treatment Performed - Fractured
1980-06-18 Well Began Injection
1980-06-18 Well Fluid changed to Water
1980-06-18 Well Type changed to Injection
1990-05-23 Well Log Performed
1993-09-23 Well Log Performed
1993-10-07 Well Log Performed
1996-07-01 Well Fluid changed to Water
1996-07-01 Well Mode changed to Suspended
1996-07-01 Well Type changed to Injection
1996-09-13 Perforation Treatment Performed - Cement Squeeze
1996-09-13 Plug Back Performed
1996-09-14 Perforation Treatment Performed - Jet Perforation
1996-09-14 Well Log Performed
1996-09-15 Perforation Treatment Performed - Remedial Casing
1996-09-17 Well Abandoned
1996-09-17 Well Fluid changed to Water
1996-09-17 Well Mode changed to Abandoned
1996-09-17 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-11-19 Perforation 1589.80 1591.40 10
1976-11-20 Perforation 1585.60 1588.30 10
1976-11-23 Acid Treatment 1585.60 1591.40 0
1978-09-26 Fracture 1585.60 1591.40 0
1996-09-13 Cement Squeeze 1585.60 1591.40 0
1996-09-14 Perforation 295.00 296.00 13
1996-09-15 Remedial Casing Cementing 295.00 296.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 153 0.0 0.0 0.0
1977 3982 0.0 0.0 0.0
1978 5480 0.0 0.0 0.0
1979 2930 0.0 0.0 0.0
1980 1330 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0

For data sources see[5]

References