X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515040504020

Well Details

Well ID: 0515040504020
Loading map...
Location: 02/04-05-051-04W5/0
Location Alias: 02/04-05-51-04 W5M
Location Alias 2: 02/04-05-051-04 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 04
Section: 05
County/Municipality: Parkland County
Well Name: NEW STAR HZ HIGHVALE 4-5-51-4
Operator Name: New Star Energy Ltd.
License Number: 0447424
License Date: 2012-07-27
License Status: Issued
Spud Date: 2012-08-10
Final Drill Date: 2012-08-25
Well Total Depth: 2913.80 m
Surface Hole Latitude: 53.380887
Surface Hole Longitude: -114.564763

For data sources see[1][2]

Well History

Date Event
2012-07-27 Obtained License
2012-08-12 Surface Casing Operation Performed
2012-08-15 Direction Drilling Operation Performed - Horizontal
2012-08-20 Intermediate Casing Operation Performed
2012-08-25 Finished Drilling
2012-08-25 Well Mode changed to Drilled and Cased
2012-08-27 Rig Released
2012-09-01 Well Log Performed
2012-09-12 Perforation Treatment Performed - Multi-Stage Fracture
2012-09-13 Perforation Treatment Performed - Multi-Stage Fracture
2012-09-19 Perforation Treatment Performed - Open-Hole Completion
2012-09-22 Well Began Production
2012-09-22 Well Fluid changed to Crude Oil
2012-09-22 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-08-10 Beaver Drilling Ltd. 12 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-08-15 1290.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-09-12 Multi-Stage Fracture 2584.50 2595.50 0
2012-09-12 Multi-Stage Fracture 2451.30 2462.30 0
2012-09-12 Multi-Stage Fracture 2432.60 2443.60 0
2012-09-12 Multi-Stage Fracture 2418.50 2429.50 0
2012-09-12 Multi-Stage Fracture 2404.00 2414.00 0
2012-09-12 Multi-Stage Fracture 2389.90 2400.90 0
2012-09-12 Multi-Stage Fracture 2375.40 2386.40 0
2012-09-12 Multi-Stage Fracture 2361.40 2372.40 0
2012-09-12 Multi-Stage Fracture 2246.90 2357.90 0
2012-09-12 Multi-Stage Fracture 2327.90 2338.90 0
2012-09-12 Multi-Stage Fracture 2313.90 2324.90 0
2012-09-12 Multi-Stage Fracture 2570.20 2581.20 0
2012-09-12 Multi-Stage Fracture 2299.30 2310.30 0
2012-09-12 Multi-Stage Fracture 2285.30 2296.30 0
2012-09-12 Multi-Stage Fracture 2270.80 2281.80 0
2012-09-12 Multi-Stage Fracture 2256.50 2267.50 0
2012-09-12 Multi-Stage Fracture 2241.90 2252.90 0
2012-09-12 Multi-Stage Fracture 2222.90 2233.90 0
2012-09-12 Multi-Stage Fracture 2208.90 2219.90 0
2012-09-13 Multi-Stage Fracture 2194.30 2205.30 0
2012-09-13 Multi-Stage Fracture 2180.10 2191.10 0
2012-09-13 Multi-Stage Fracture 2165.70 2176.70 0
2012-09-12 Multi-Stage Fracture 2555.90 2566.90 0
2012-09-13 Multi-Stage Fracture 2146.60 2157.60 0
2012-09-13 Multi-Stage Fracture 2132.60 2143.60 0
2012-09-13 Multi-Stage Fracture 2118.10 2129.10 0
2012-09-13 Multi-Stage Fracture 2104.10 2115.10 0
2012-09-13 Multi-Stage Fracture 2089.60 2100.60 0
2012-09-13 Multi-Stage Fracture 2075.60 2086.60 0
2012-09-13 Multi-Stage Fracture 2061.10 2072.10 0
2012-09-13 Multi-Stage Fracture 2047.20 2058.20 0
2012-09-13 Multi-Stage Fracture 2028.20 2039.20 0
2012-09-13 Multi-Stage Fracture 2013.70 2024.70 0
2012-09-12 Multi-Stage Fracture 2541.60 2552.60 0
2012-09-13 Multi-Stage Fracture 1999.70 2010.70 0
2012-09-13 Multi-Stage Fracture 1985.40 1996.40 0
2012-09-13 Multi-Stage Fracture 1971.20 1982.20 0
2012-09-13 Multi-Stage Fracture 1956.60 1967.60 0
2012-09-13 Multi-Stage Fracture 1937.30 1948.30 0
2012-09-13 Multi-Stage Fracture 1918.10 1929.10 0
2012-09-13 Multi-Stage Fracture 1898.90 1909.90 0
2012-09-13 Multi-Stage Fracture 1879.60 1890.60 0
2012-09-13 Multi-Stage Fracture 1865.40 1876.40 0
2012-09-13 Multi-Stage Fracture 1860.40 1871.40 0
2012-09-12 Multi-Stage Fracture 2527.30 2538.30 0
2012-09-13 Multi-Stage Fracture 1850.70 1861.70 0
2012-09-13 Multi-Stage Fracture 1836.50 1847.50 0
2012-09-13 Multi-Stage Fracture 1821.90 1832.90 0
2012-09-13 Multi-Stage Fracture 1803.10 1814.10 0
2012-09-13 Multi-Stage Fracture 1788.40 1799.40 0
2012-09-13 Multi-Stage Fracture 1773.70 1784.70 0
2012-09-13 Multi-Stage Fracture 1759.50 1770.50 0
2012-09-19 Open Hole/Barefoot Completion 1747.40 2913.80 0
2012-09-12 Multi-Stage Fracture 2508.10 2519.10 0
2012-09-12 Multi-Stage Fracture 2494.00 2505.00 0
2012-09-12 Multi-Stage Fracture 2479.50 2490.50 0
2012-09-12 Multi-Stage Fracture 2465.80 2476.80 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 678 0.0 0.0 0.0
2013 7534 0.0 0.0 0.0
2014 8453 0.0 0.0 0.0
2015 8086 0.0 0.0 0.0
2016 8711 0.0 0.0 0.0
2017 8669 0.0 0.0 0.0
2018 8367 0.0 0.0 0.0
2019 8495 0.0 0.0 0.0
2020 904 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-29 No Incident Encountered 0.00 0.00
2012-09-19 No Incident Encountered 0.00 0.00

For data sources see[8]

References