If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0515040512000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.376153,"lon":-114.543627,"icon":""}]} |
Location: 00/12-05-051-04W5/0 | |
Location Alias: 00/12-05-51-04 W5M | |
Location Alias 2: 00/12-05-051-04 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 051 | |
Meridian: 5 | |
Range: 04 | |
Section: 05 | |
County/Municipality: Parkland County | |
Well Name: NEW STAR HZ HIGHVALE 12-5-51-4 | |
Operator Name: New Star Energy Ltd. | |
License Number: 0458301 | |
License Date: 2013-07-26 | |
License Status: Issued | |
Spud Date: 2013-08-14 | |
Final Drill Date: 2013-08-28 | |
Well Total Depth: 2683.00 m | |
Surface Hole Latitude: 53.376153 | |
Surface Hole Longitude: -114.543627 |
Date | Event |
---|---|
2013-07-26 | Obtained License |
2013-08-16 | Surface Casing Operation Performed |
2013-08-19 | Direction Drilling Operation Performed - Deviate |
2013-08-22 | Direction Drilling Operation Performed - Horizontal |
2013-08-24 | Intermediate Casing Operation Performed |
2013-08-28 | Finished Drilling |
2013-08-28 | Well Mode changed to Drilled and Cased |
2013-08-29 | Rig Released |
2013-09-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-09-07 | Perforation Treatment Performed - Open-Hole Completion |
2013-09-09 | Well Began Production |
2013-09-09 | Well Fluid changed to Crude Oil |
2013-09-09 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2013-08-14 | Beaver Drilling Ltd. | 12 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2013-08-19 | 1338.70 | Deviate (5 - 79 degrees) |
2013-08-22 | 1737.20 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-09-07 | Multi-Stage Fracture | 2646.40 | 2662.00 | 0 |
2013-09-07 | Multi-Stage Fracture | 2462.40 | 2477.70 | 0 |
2013-09-07 | Multi-Stage Fracture | 2443.10 | 2458.40 | 0 |
2013-09-07 | Multi-Stage Fracture | 2423.90 | 2439.20 | 0 |
2013-09-07 | Multi-Stage Fracture | 2401.60 | 2416.90 | 0 |
2013-09-07 | Multi-Stage Fracture | 2382.40 | 2397.70 | 0 |
2013-09-07 | Multi-Stage Fracture | 2363.10 | 2378.40 | 0 |
2013-09-07 | Multi-Stage Fracture | 2343.90 | 2359.20 | 0 |
2013-09-07 | Multi-Stage Fracture | 2324.70 | 2334.00 | 0 |
2013-09-07 | Multi-Stage Fracture | 2305.20 | 2320.50 | 0 |
2013-09-07 | Multi-Stage Fracture | 2285.60 | 2301.00 | 0 |
2013-09-07 | Multi-Stage Fracture | 2627.00 | 2642.00 | 0 |
2013-09-07 | Multi-Stage Fracture | 2266.00 | 2281.30 | 0 |
2013-09-07 | Multi-Stage Fracture | 2246.50 | 2261.80 | 0 |
2013-09-07 | Multi-Stage Fracture | 2227.00 | 2242.20 | 0 |
2013-09-07 | Multi-Stage Fracture | 2207.40 | 2222.70 | 0 |
2013-09-07 | Multi-Stage Fracture | 2187.80 | 2203.10 | 0 |
2013-09-07 | Multi-Stage Fracture | 2168.30 | 2183.60 | 0 |
2013-09-07 | Multi-Stage Fracture | 2143.90 | 2159.20 | 0 |
2013-09-07 | Multi-Stage Fracture | 2122.40 | 2137.70 | 0 |
2013-09-07 | Multi-Stage Fracture | 2102.80 | 2118.10 | 0 |
2013-09-07 | Multi-Stage Fracture | 2083.30 | 2098.60 | 0 |
2013-09-07 | Multi-Stage Fracture | 2607.00 | 2622.00 | 0 |
2013-09-07 | Multi-Stage Fracture | 2063.70 | 2079.00 | 0 |
2013-09-07 | Multi-Stage Fracture | 2044.20 | 2059.50 | 0 |
2013-09-07 | Multi-Stage Fracture | 2021.60 | 2036.90 | 0 |
2013-09-07 | Multi-Stage Fracture | 2002.10 | 2017.40 | 0 |
2013-09-07 | Multi-Stage Fracture | 1982.50 | 1997.80 | 0 |
2013-09-07 | Multi-Stage Fracture | 1962.90 | 1978.30 | 0 |
2013-09-07 | Multi-Stage Fracture | 1942.40 | 1958.70 | 0 |
2013-09-07 | Multi-Stage Fracture | 1923.90 | 1939.20 | 0 |
2013-09-07 | Multi-Stage Fracture | 1904.30 | 1919.60 | 0 |
2013-09-07 | Multi-Stage Fracture | 1884.80 | 1900.10 | 0 |
2013-09-07 | Multi-Stage Fracture | 2587.00 | 2602.00 | 0 |
2013-09-07 | Multi-Stage Fracture | 1811.00 | 1880.50 | 0 |
2013-09-07 | Open Hole/Barefoot Completion | 1811.00 | 2683.00 | 0 |
2013-09-07 | Multi-Stage Fracture | 2567.00 | 2582.00 | 0 |
2013-09-07 | Multi-Stage Fracture | 2547.70 | 2563.00 | 0 |
2013-09-07 | Multi-Stage Fracture | 2527.90 | 2543.30 | 0 |
2013-09-07 | Multi-Stage Fracture | 2508.20 | 2523.50 | 0 |
2013-09-07 | Multi-Stage Fracture | 2488.50 | 2503.80 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-09-07 | 2013-09-07 | 1,631 | 498 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Hydrochloric acid | 7647-01-0 | 100 | 33.9774 | N/A | |||
Hydrochloric acid dilution water | Not Available | 100 | 33.9774 | N/A | ||||
Water | Not Available | 100 | 60.6713 | N/A | ||||
DWP-913 | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0619 | N/A | |
DAP-111 | Calfrac | Corrosion Inhibitor | Hydroxylated hydrocarbon | 8676 | 100 | 0.1972 | N/A | |
Inorganic salt | 8676 | 100 | 0.1972 | N/A | ||||
Water | 7732-18-5 | 100 | 0.1972 | N/A | ||||
DAP-121 | Calfrac | Demulsifier | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0738 | N/A | |
Sulfonated hydrocarbon | 8691 | 100 | 0.0738 | N/A | ||||
DAP-131 | Calfrac | Demulsifier | 2-Propanol | 67-63-0 | 100 | 0.3775 | N/A | |
Inorganic acid | 8692 | 100 | 0.3775 | N/A | ||||
Sulfonated hydrocarbon | 8692 | 100 | 0.3775 | N/A | ||||
DWP-602 | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.1003 | N/A | |
DAP-101 | Calfrac | Iron Control | 2-Mercaptoethanol | 60-24-2 | 100 | 0.5894 | N/A | |
Copper chloride | 7447-39-4 | 100 | 0.5894 | N/A | ||||
Ethanolamine | 141-43-5 | 100 | 0.5894 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.5894 | N/A | ||||
Water | 7732-18-5 | 100 | 0.5894 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2013-09-04 | 2013-09-16 | Oilfield Produced Water | 184 |
2013-09-04 | 2013-09-16 | Central Water Distribution Facility | 497 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 2031 | 0.0 | 0.0 | 0.0 |
2014 | 7725 | 0.0 | 0.0 | 0.0 |
2015 | 7526 | 0.0 | 0.0 | 0.0 |
2016 | 5517 | 0.0 | 0.0 | 0.0 |
2017 | 8654 | 0.0 | 0.0 | 0.0 |
2018 | 8713 | 0.0 | 0.0 | 0.0 |
2019 | 8495 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-08-29 | No Incident Encountered | 0.00 | 0.00 |
2013-09-11 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]