X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515040512000

Well Details

Well ID: 0515040512000
Loading map...
Location: 00/12-05-051-04W5/0
Location Alias: 00/12-05-51-04 W5M
Location Alias 2: 00/12-05-051-04 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 04
Section: 05
County/Municipality: Parkland County
Well Name: NEW STAR HZ HIGHVALE 12-5-51-4
Operator Name: New Star Energy Ltd.
License Number: 0458301
License Date: 2013-07-26
License Status: Issued
Spud Date: 2013-08-14
Final Drill Date: 2013-08-28
Well Total Depth: 2683.00 m
Surface Hole Latitude: 53.376153
Surface Hole Longitude: -114.543627

For data sources see[1][2]

Well History

Date Event
2013-07-26 Obtained License
2013-08-16 Surface Casing Operation Performed
2013-08-19 Direction Drilling Operation Performed - Deviate
2013-08-22 Direction Drilling Operation Performed - Horizontal
2013-08-24 Intermediate Casing Operation Performed
2013-08-28 Finished Drilling
2013-08-28 Well Mode changed to Drilled and Cased
2013-08-29 Rig Released
2013-09-07 Perforation Treatment Performed - Multi-Stage Fracture
2013-09-07 Perforation Treatment Performed - Open-Hole Completion
2013-09-09 Well Began Production
2013-09-09 Well Fluid changed to Crude Oil
2013-09-09 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-08-14 Beaver Drilling Ltd. 12 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-08-19 1338.70 Deviate (5 - 79 degrees)
2013-08-22 1737.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-09-07 Multi-Stage Fracture 2646.40 2662.00 0
2013-09-07 Multi-Stage Fracture 2462.40 2477.70 0
2013-09-07 Multi-Stage Fracture 2443.10 2458.40 0
2013-09-07 Multi-Stage Fracture 2423.90 2439.20 0
2013-09-07 Multi-Stage Fracture 2401.60 2416.90 0
2013-09-07 Multi-Stage Fracture 2382.40 2397.70 0
2013-09-07 Multi-Stage Fracture 2363.10 2378.40 0
2013-09-07 Multi-Stage Fracture 2343.90 2359.20 0
2013-09-07 Multi-Stage Fracture 2324.70 2334.00 0
2013-09-07 Multi-Stage Fracture 2305.20 2320.50 0
2013-09-07 Multi-Stage Fracture 2285.60 2301.00 0
2013-09-07 Multi-Stage Fracture 2627.00 2642.00 0
2013-09-07 Multi-Stage Fracture 2266.00 2281.30 0
2013-09-07 Multi-Stage Fracture 2246.50 2261.80 0
2013-09-07 Multi-Stage Fracture 2227.00 2242.20 0
2013-09-07 Multi-Stage Fracture 2207.40 2222.70 0
2013-09-07 Multi-Stage Fracture 2187.80 2203.10 0
2013-09-07 Multi-Stage Fracture 2168.30 2183.60 0
2013-09-07 Multi-Stage Fracture 2143.90 2159.20 0
2013-09-07 Multi-Stage Fracture 2122.40 2137.70 0
2013-09-07 Multi-Stage Fracture 2102.80 2118.10 0
2013-09-07 Multi-Stage Fracture 2083.30 2098.60 0
2013-09-07 Multi-Stage Fracture 2607.00 2622.00 0
2013-09-07 Multi-Stage Fracture 2063.70 2079.00 0
2013-09-07 Multi-Stage Fracture 2044.20 2059.50 0
2013-09-07 Multi-Stage Fracture 2021.60 2036.90 0
2013-09-07 Multi-Stage Fracture 2002.10 2017.40 0
2013-09-07 Multi-Stage Fracture 1982.50 1997.80 0
2013-09-07 Multi-Stage Fracture 1962.90 1978.30 0
2013-09-07 Multi-Stage Fracture 1942.40 1958.70 0
2013-09-07 Multi-Stage Fracture 1923.90 1939.20 0
2013-09-07 Multi-Stage Fracture 1904.30 1919.60 0
2013-09-07 Multi-Stage Fracture 1884.80 1900.10 0
2013-09-07 Multi-Stage Fracture 2587.00 2602.00 0
2013-09-07 Multi-Stage Fracture 1811.00 1880.50 0
2013-09-07 Open Hole/Barefoot Completion 1811.00 2683.00 0
2013-09-07 Multi-Stage Fracture 2567.00 2582.00 0
2013-09-07 Multi-Stage Fracture 2547.70 2563.00 0
2013-09-07 Multi-Stage Fracture 2527.90 2543.30 0
2013-09-07 Multi-Stage Fracture 2508.20 2523.50 0
2013-09-07 Multi-Stage Fracture 2488.50 2503.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-09-07 2013-09-07 1,631 498 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Hydrochloric acid 7647-01-0 100 33.9774 N/A
Hydrochloric acid dilution water Not Available 100 33.9774 N/A
Water Not Available 100 60.6713 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.0619 N/A
DAP-111 Calfrac Corrosion Inhibitor Hydroxylated hydrocarbon 8676 100 0.1972 N/A
Inorganic salt 8676 100 0.1972 N/A
Water 7732-18-5 100 0.1972 N/A
DAP-121 Calfrac Demulsifier Non-Hazardous Ingredients Trade Secret 100 0.0738 N/A
Sulfonated hydrocarbon 8691 100 0.0738 N/A
DAP-131 Calfrac Demulsifier 2-Propanol 67-63-0 100 0.3775 N/A
Inorganic acid 8692 100 0.3775 N/A
Sulfonated hydrocarbon 8692 100 0.3775 N/A
DWP-602 Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.1003 N/A
DAP-101 Calfrac Iron Control 2-Mercaptoethanol 60-24-2 100 0.5894 N/A
Copper chloride 7447-39-4 100 0.5894 N/A
Ethanolamine 141-43-5 100 0.5894 N/A
Non-Hazardous Ingredients Trade Secret 100 0.5894 N/A
Water 7732-18-5 100 0.5894 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-09-04 2013-09-16 Oilfield Produced Water 184
2013-09-04 2013-09-16 Central Water Distribution Facility 497

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 2031 0.0 0.0 0.0
2014 7725 0.0 0.0 0.0
2015 7526 0.0 0.0 0.0
2016 5517 0.0 0.0 0.0
2017 8654 0.0 0.0 0.0
2018 8713 0.0 0.0 0.0
2019 8495 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-08-29 No Incident Encountered 0.00 0.00
2013-09-11 No Incident Encountered 0.00 0.00

For data sources see[10]

References