X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515040813000

Well Details

Well ID: 0515040813000
Loading map...
Location: 00/13-08-051-04W5/0
Location Alias: 00/13-08-51-04 W5M
Location Alias 2: 00/13-08-051-04 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 04
Section: 08
County/Municipality: Parkland County
Well Name: NEW STAR HZ HIGHVALE 13-8-51-4
Operator Name: New Star Energy Ltd.
License Number: 0452859
License Date: 2012-12-21
License Status: Issued
Spud Date: 2013-01-12
Final Drill Date: 2013-01-25
Well Total Depth: 2434.00 m
Surface Hole Latitude: 53.395398
Surface Hole Longitude: -114.550931

For data sources see[1][2]

Well History

Date Event
2012-12-21 Obtained License
2013-01-14 Surface Casing Operation Performed
2013-01-17 Direction Drilling Operation Performed - Deviate
2013-01-19 Direction Drilling Operation Performed - Horizontal
2013-01-21 Intermediate Casing Operation Performed
2013-01-25 Finished Drilling
2013-01-25 Well Mode changed to Drilled and Cased
2013-01-27 Rig Released
2013-02-03 Perforation Treatment Performed - Multi-Stage Fracture
2013-02-06 Well Began Production
2013-02-06 Well Fluid changed to Crude Oil
2013-02-06 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-01-12 Beaver Drilling Ltd. 12 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-01-17 1311.80 Deviate (5 - 79 degrees)
2013-01-19 1777.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-02-03 Multi-Stage Fracture 1800.00 1810.00 0
2013-02-03 Multi-Stage Fracture 1935.00 1945.00 0
2013-02-03 Multi-Stage Fracture 1950.00 1960.00 0
2013-02-03 Multi-Stage Fracture 1965.00 1975.00 0
2013-02-03 Multi-Stage Fracture 1980.00 1990.00 0
2013-02-03 Multi-Stage Fracture 1995.00 2005.00 0
2013-02-03 Multi-Stage Fracture 2010.00 2020.00 0
2013-02-03 Multi-Stage Fracture 2025.00 2035.00 0
2013-02-03 Multi-Stage Fracture 2040.00 2050.00 0
2013-02-03 Multi-Stage Fracture 2055.00 2065.00 0
2013-02-03 Multi-Stage Fracture 2070.00 2080.00 0
2013-02-03 Multi-Stage Fracture 1815.00 1825.00 0
2013-02-03 Multi-Stage Fracture 2085.00 2095.00 0
2013-02-03 Multi-Stage Fracture 2100.00 2110.00 0
2013-02-03 Multi-Stage Fracture 2115.00 2125.00 0
2013-02-03 Multi-Stage Fracture 2130.00 2140.00 0
2013-02-03 Multi-Stage Fracture 2145.00 2155.00 0
2013-02-03 Multi-Stage Fracture 2160.00 2170.00 0
2013-02-03 Multi-Stage Fracture 2175.00 2185.00 0
2013-02-03 Multi-Stage Fracture 2190.00 2200.00 0
2013-02-03 Multi-Stage Fracture 2205.00 2215.00 0
2013-02-03 Multi-Stage Fracture 2220.00 2230.00 0
2013-02-03 Multi-Stage Fracture 1830.00 1840.00 0
2013-02-03 Multi-Stage Fracture 2235.00 2245.00 0
2013-02-03 Multi-Stage Fracture 2250.00 2260.00 0
2013-02-03 Multi-Stage Fracture 2265.00 2275.00 0
2013-02-03 Multi-Stage Fracture 2280.00 2290.00 0
2013-02-03 Multi-Stage Fracture 2295.00 2305.00 0
2013-02-03 Multi-Stage Fracture 2310.00 2320.00 0
2013-02-03 Multi-Stage Fracture 2325.00 2335.00 0
2013-02-03 Multi-Stage Fracture 2340.00 2350.00 0
2013-02-03 Multi-Stage Fracture 2355.00 2365.00 0
2013-02-03 Multi-Stage Fracture 2370.00 2380.00 0
2013-02-03 Multi-Stage Fracture 1845.00 1855.00 0
2013-02-03 Multi-Stage Fracture 2385.00 2395.00 0
2013-02-03 Multi-Stage Fracture 2400.00 2410.00 0
2013-02-03 Multi-Stage Fracture 2415.00 2425.00 0
2013-02-03 Multi-Stage Fracture 1860.00 1870.00 0
2013-02-03 Multi-Stage Fracture 1875.00 1885.00 0
2013-02-03 Multi-Stage Fracture 1890.00 1900.00 0
2013-02-03 Multi-Stage Fracture 1905.00 1915.00 0
2013-02-03 Multi-Stage Fracture 1920.00 1930.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-02-03 2013-02-03 1,616 495 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Hydrochloric acid 7647-01-0 100 30.1249 N/A
Hydrochloric acid dilution water Not Available 100 30.1249 N/A
Water Not Available 100 65.6142 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.1101 N/A
DAP-111 Calfrac Corrosion Inhibitor Hydroxylated hydrocarbon 8676 100 0.0858 N/A
Inorganic salt 8676 100 0.0858 N/A
Water 7732-18-5 100 0.0858 N/A
DAP-121 Calfrac Demulsifier Non-Hazardous Ingredients Trade Secret 100 0.0321 N/A
Sulfonated hydrocarbon 8691 100 0.0321 N/A
DAP-131 Calfrac Demulsifier 2-Propanol 67-63-0 100 0.1917 N/A
Inorganic acid 8692 100 0.1917 N/A
Sulfonated hydrocarbon 8692 100 0.1917 N/A
DWP-602 Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.0813 N/A
DAP-101 Calfrac Iron Control 2-Mercaptoethanol 60-24-2 100 0.2566 N/A
Copper chloride 7447-39-4 100 0.2566 N/A
Ethanolamine 141-43-5 100 0.2566 N/A
Non-Hazardous Ingredients Trade Secret 100 0.2566 N/A
Water 7732-18-5 100 0.2566 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-01-29 2013-02-20 Municipal Water 610

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 7055 0.0 0.0 0.0
2014 8508 0.0 0.0 0.0
2015 8184 0.0 0.0 0.0
2016 8635 0.0 0.0 0.0
2017 8576 0.0 0.0 0.0
2018 8674 0.0 0.0 0.0
2019 8429 0.0 0.0 0.0
2020 2095 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-01-27 No Incident Encountered 0.00 0.00
2013-02-20 No Incident Encountered 0.00 0.00

For data sources see[10]

References