If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0515040913000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.385302,"lon":-114.541334,"icon":""}]} |
Location: 00/13-09-051-04W5/0 | |
Location Alias: 00/13-09-51-04 W5M | |
Location Alias 2: 00/13-09-051-04 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 051 | |
Meridian: 5 | |
Range: 04 | |
Section: 09 | |
County/Municipality: Parkland County | |
Well Name: NEW STAR HZ HIGHVALE 13-9-51-4 | |
Operator Name: New Star Energy Ltd. | |
License Number: 0457104 | |
License Date: 2013-05-24 | |
License Status: Amended | |
Spud Date: 2013-06-11 | |
Final Drill Date: 2013-06-23 | |
Well Total Depth: 2568.00 m | |
Surface Hole Latitude: 53.385302 | |
Surface Hole Longitude: -114.541334 |
Date | Event |
---|---|
2013-05-24 | Obtained License |
2013-06-13 | Surface Casing Operation Performed |
2013-06-16 | Direction Drilling Operation Performed - Deviate |
2013-06-18 | Direction Drilling Operation Performed - Horizontal |
2013-06-20 | Intermediate Casing Operation Performed |
2013-06-23 | Finished Drilling |
2013-06-23 | Well Mode changed to Drilled and Cased |
2013-06-24 | Well Fluid changed to Crude Oil |
2013-06-24 | Well Mode changed to Drilling and Completing |
2013-06-25 | Rig Released |
2013-07-02 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-07-02 | Perforation Treatment Performed - Open-Hole Completion |
2013-07-06 | Well Began Production |
2013-07-06 | Well Fluid changed to Crude Oil |
2013-07-06 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2013-06-11 | Beaver Drilling Ltd. | 12 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2013-06-16 | 1350.00 | Deviate (5 - 79 degrees) |
2013-06-18 | 1730.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-07-02 | Multi-Stage Fracture | 2534.90 | 2551.30 | 0 |
2013-07-02 | Multi-Stage Fracture | 2359.20 | 2375.70 | 0 |
2013-07-02 | Multi-Stage Fracture | 2334.90 | 2351.40 | 0 |
2013-07-02 | Multi-Stage Fracture | 2313.40 | 2329.80 | 0 |
2013-07-02 | Multi-Stage Fracture | 2293.90 | 2310.40 | 0 |
2013-07-02 | Multi-Stage Fracture | 2274.40 | 2290.80 | 0 |
2013-07-02 | Multi-Stage Fracture | 2254.90 | 2271.30 | 0 |
2013-07-02 | Multi-Stage Fracture | 2232.40 | 2248.80 | 0 |
2013-07-02 | Multi-Stage Fracture | 2212.80 | 2229.30 | 0 |
2013-07-02 | Multi-Stage Fracture | 2193.30 | 2209.80 | 0 |
2013-07-02 | Multi-Stage Fracture | 2173.80 | 2190.30 | 0 |
2013-07-02 | Multi-Stage Fracture | 2515.30 | 2526.60 | 0 |
2013-07-02 | Multi-Stage Fracture | 2154.30 | 2170.80 | 0 |
2013-07-02 | Multi-Stage Fracture | 2134.80 | 2151.20 | 0 |
2013-07-02 | Multi-Stage Fracture | 2115.30 | 2131.70 | 0 |
2013-07-02 | Multi-Stage Fracture | 2095.70 | 2112.20 | 0 |
2013-07-02 | Multi-Stage Fracture | 2076.20 | 2092.70 | 0 |
2013-07-02 | Multi-Stage Fracture | 2056.00 | 2073.10 | 0 |
2013-07-02 | Multi-Stage Fracture | 2037.20 | 2053.60 | 0 |
2013-07-02 | Multi-Stage Fracture | 2017.60 | 2034.10 | 0 |
2013-07-02 | Multi-Stage Fracture | 1998.10 | 2014.60 | 0 |
2013-07-02 | Multi-Stage Fracture | 1978.60 | 1995.00 | 0 |
2013-07-02 | Multi-Stage Fracture | 2495.80 | 2512.30 | 0 |
2013-07-02 | Multi-Stage Fracture | 1959.00 | 1970.30 | 0 |
2013-07-02 | Multi-Stage Fracture | 1939.50 | 1956.00 | 0 |
2013-07-02 | Multi-Stage Fracture | 1915.20 | 1931.70 | 0 |
2013-07-02 | Multi-Stage Fracture | 1893.70 | 1910.00 | 0 |
2013-07-02 | Multi-Stage Fracture | 1874.20 | 1890.60 | 0 |
2013-07-02 | Multi-Stage Fracture | 1854.70 | 1871.10 | 0 |
2013-07-02 | Multi-Stage Fracture | 1835.20 | 1851.60 | 0 |
2013-07-02 | Multi-Stage Fracture | 1826.80 | 1834.10 | 0 |
2013-07-02 | Open Hole/Barefoot Completion | 1826.80 | 2568.00 | 0 |
2013-07-02 | Multi-Stage Fracture | 2476.30 | 2492.80 | 0 |
2013-07-02 | Multi-Stage Fracture | 2456.80 | 2473.20 | 0 |
2013-07-02 | Multi-Stage Fracture | 2437.30 | 2453.70 | 0 |
2013-07-02 | Multi-Stage Fracture | 2417.80 | 2434.20 | 0 |
2013-07-02 | Multi-Stage Fracture | 2398.20 | 2414.70 | 0 |
2013-07-02 | Multi-Stage Fracture | 2378.70 | 2395.20 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-07-02 | 2013-07-02 | 1,617 | 483 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Hydrochloric acid | 7647-01-0 | 100 | 33.5201 | N/A | |||
Hydrochloric acid dilution water | Not Available | 100 | 33.5201 | N/A | ||||
Water | Not Available | 100 | 61.5489 | N/A | ||||
DWP-913 | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0888 | N/A | |
DAP-111 | Calfrac | Corrosion Inhibitor | Hydroxylated hydrocarbon | 8676 | 100 | 0.0988 | N/A | |
Inorganic salt | 8676 | 100 | 0.0988 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0988 | N/A | ||||
DAP-121 | Calfrac | Demulsifier | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0369 | N/A | |
Sulfonated hydrocarbon | 8691 | 100 | 0.0369 | N/A | ||||
DAP-131 | Calfrac | Demulsifier | 2-Propanol | 67-63-0 | 100 | 0.2207 | N/A | |
Inorganic acid | 8692 | 100 | 0.2207 | N/A | ||||
Sulfonated hydrocarbon | 8692 | 100 | 0.2207 | N/A | ||||
Nitrogen | Calfrac | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 6.2361 | N/A | |
DWP-602 | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.1239 | N/A | |
DAP-101 | Calfrac | Iron Control | 2-Mercaptoethanol | 60-24-2 | 100 | 0.2953 | N/A | |
Copper chloride | 7447-39-4 | 100 | 0.2953 | N/A | ||||
Ethanolamine | 141-43-5 | 100 | 0.2953 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.2953 | N/A | ||||
Water | 7732-18-5 | 100 | 0.2953 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2013-06-29 | 2013-07-08 | Municipal Water | 630 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 3883 | 0.0 | 0.0 | 0.0 |
2014 | 8112 | 0.0 | 0.0 | 0.0 |
2015 | 8479 | 0.0 | 0.0 | 0.0 |
2016 | 8749 | 0.0 | 0.0 | 0.0 |
2017 | 8518 | 0.0 | 0.0 | 0.0 |
2018 | 7293 | 0.0 | 0.0 | 0.0 |
2019 | 7079 | 0.0 | 0.0 | 0.0 |
2020 | 1944 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-06-25 | No Incident Encountered | 0.00 | 0.00 |
2013-07-08 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]