If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0515042106002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.414884,"lon":-114.535659,"icon":""}]} |
Location: 00/06-21-051-04W5/2 | |
Location Alias: 00/06-21-51-04 W5M | |
Location Alias 2: 00/06-21-051-04 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 051 | |
Meridian: 5 | |
Range: 04 | |
Section: 21 | |
County/Municipality: Parkland County | |
Well Name: ANDEX ET AL HIGHVALE 6-21-51-4 | |
Operator Name: New Star Energy Ltd. | |
License Number: 0087234 | |
License Date: 1980-11-25 | |
License Status: Abandoned | |
Spud Date: 1980-12-09 | |
Final Drill Date: 1981-01-20 | |
Well Total Depth: 1681.00 m | |
Surface Hole Latitude: 53.414884 | |
Surface Hole Longitude: -114.535659 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1980-11-25 | Obtained License |
1980-12-09 | Lost Circulation Occurred |
1981-01-20 | Finished Drilling |
1981-01-21 | Drill Stem Test Performed |
1981-01-22 | Production Casing Operation Performed |
1981-02-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1981-02-27 | Perforation Treatment Performed - Jet Perforation |
1981-03-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1981-04-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1981-04-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1981-04-30 | Perforation Treatment Performed - Jet Perforation |
1981-06-17 | Perforation Treatment Performed - Cement Squeeze |
1981-06-19 | Perforation Treatment Performed - Jet Perforation |
1981-06-21 | Perforation Treatment Performed - Jet Perforation |
1981-06-25 | Well Mode changed to Drilled and Cased |
1982-03-01 | Well Began Production |
1982-03-01 | Well Fluid changed to Gas |
1982-03-01 | Well Mode changed to Flowing |
1985-03-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-02-01 | Well Fluid changed to Gas |
1986-02-01 | Well Mode changed to Suspended |
2000-03-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-03-14 | Plug Back Performed |
2000-03-14 | Well Fluid changed to Gas |
2000-03-14 | Well Log Performed |
2000-03-14 | Well Mode changed to Abandoned Zone |
2000-09-13 | Perforation Treatment Performed - Jet Perforation |
2000-09-14 | Well Log Performed |
2000-09-18 | Perforation Treatment Performed - Cement Plug |
2000-09-18 | Perforation Treatment Performed - Remedial Casing |
2000-09-21 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1981-02-27 | Perforation | 1607.00 | 1610.00 | 13 |
1981-06-21 | Perforation | 1571.50 | 1574.50 | 12 |
1985-03-21 | Acid Treatment | 1571.50 | 1577.50 | 0 |
2000-03-14 | Packing Device Capped w/Cement | 1549.40 | 1559.00 | 0 |
2000-09-13 | Perforation | 346.00 | 347.00 | 13 |
2000-09-18 | Remedial Casing Cementing | 346.00 | 347.00 | 0 |
2000-09-18 | Cement Plug | 36.20 | 260.00 | 0 |
1981-02-27 | Acid Treatment | 1607.00 | 1610.00 | 0 |
1981-03-02 | Acid Treatment | 1607.00 | 1610.00 | 0 |
1981-04-29 | Packing Device Capped w/Cement | 1582.00 | 1590.00 | 0 |
1981-04-30 | Perforation | 1394.50 | 1396.00 | 6 |
1981-04-30 | Perforation | 1396.50 | 1398.00 | 6 |
1981-04-30 | Acid Treatment | 1394.50 | 1398.00 | 0 |
1981-06-17 | Cement Squeeze | 1394.50 | 1398.00 | 0 |
1981-06-19 | Perforation | 1576.50 | 1577.50 | 6 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1982 | 6455 | 0.0 | 0.0 | 0.0 |
1983 | 8085 | 0.0 | 0.0 | 0.0 |
1984 | 7999 | 0.0 | 0.0 | 0.0 |
1985 | 3395 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1980-12-09 | Lost Circulation | 60.00 | 88.00 |
For data sources see[6]