X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515042605000

Well Details

Well ID: 0515042605000
Loading map...
Location: 00/05-26-051-04W5/0
Location Alias: 00/05-26-51-04 W5M
Location Alias 2: 00/05-26-051-04 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 04
Section: 26
County/Municipality: Parkland County
Well Name: VH1 ET AL HIGHVALE 5-26-51-4
Operator Name: Harvest Operations Corp.
License Number: 0183867
License Date: 1995-12-20
License Status: Abandoned
Spud Date: 1995-12-28
Final Drill Date: 1996-01-05
Well Total Depth: 1648.00 m
Surface Hole Latitude: 53.430022
Surface Hole Longitude: -114.490315

For data sources see[1][2]

Well History

Date Event
1995-01-06 Well Log Performed
1995-12-20 Obtained License
1995-12-29 Lost Circulation Occurred
1995-12-30 Surface Casing Operation Performed
1995-12-31 Direction Drilling Operation Performed - Deviate
1996-01-05 Finished Drilling
1996-01-05 Well Log Performed
1996-01-06 Well Log Performed
1996-01-10 Well Log Performed
1996-01-13 Production Casing Operation Performed
1996-01-13 Rig Released
1996-01-13 Well Mode changed to Drilled and Cased
1996-02-13 Well Log Performed
1996-02-14 Perforation Treatment Performed - Jet Perforation
1996-02-14 Perforation Treatment Performed - Remedial Casing
1996-02-17 Well Log Performed
1996-02-19 Perforation Treatment Performed - Jet Perforation
1996-02-19 Well Log Performed
2002-07-06 Well Began Production
2002-07-06 Well Fluid changed to Gas
2002-07-06 Well Mode changed to Flowing
2003-12-22 Perforation Treatment Performed - Jet Perforation
2005-10-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-10-27 Plug Back Performed
2005-10-27 Well Fluid changed to Gas
2005-10-27 Well Log Performed
2005-10-27 Well Mode changed to Abandoned Zone
2005-10-28 Perforation Treatment Performed - Jet Perforation
2005-10-28 Well Log Performed
2015-11-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-11-05 Plug Back Performed
2015-11-05 Well Log Performed
2019-01-04 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-12-31 925.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-02-14 Perforation 603.00 604.00 13
2015-11-05 Packing Device Capped w/Cement 756.60 764.60 0
1996-02-14 Remedial Casing Cementing 603.00 604.00 0
1996-02-19 Perforation 1616.50 1618.00 18
2003-12-22 Perforation 1145.00 1151.00 17
2005-10-27 Packing Device Capped w/Cement 1602.00 1610.00 0
2005-10-27 Packing Device Capped w/Cement 1127.00 1135.00 0
2005-10-28 Perforation 772.00 773.50 17
2005-10-28 Perforation 774.50 776.00 17
2005-10-28 Perforation 777.00 779.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 2123 0.0 0.0 0.0
2003 1352 0.0 0.0 0.0
2004 4254 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1995-12-29 Lost Circulation 123.00 195.00
2015-11-05 No Incident Encountered 0.00 0.00

For data sources see[7]

References