X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515100508002

Well Details

Well ID: 0515100508002
Loading map...
Location: 00/08-05-051-10W5/2
Location Alias: 00/08-05-51-10 W5M
Location Alias 2: 00/08-05-051-10 W5/02
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 10
Section: 05
County/Municipality: Yellowhead County
Well Name: ESSO PEMBINA 8-5-51-10
Operator Name: Imperial Oil Resources Limited
License Number: 0022285
License Date: 1962-03-23
License Status: RecCertified
Spud Date: 1962-05-10
Final Drill Date: 1962-06-03
Well Total Depth: 1633.70 m
Surface Hole Latitude: 53.372563
Surface Hole Longitude: -115.429959

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-03-23 Obtained License
1962-05-10 Direction Drilling Operation Performed - 98
1962-06-03 Finished Drilling
1962-06-03 Well Mode changed to Drilled and Cased
1962-06-04 Production Casing Operation Performed
1962-06-05 Perforation Treatment Performed - Abrasa-Jet Perforation
1962-06-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-06-08 Perforation Treatment Performed - Fractured
1962-08-02 Well Began Production
1962-08-02 Well Fluid changed to Crude Oil
1962-08-02 Well Mode changed to Pumping
1990-06-01 Well Fluid changed to Crude Oil
1990-06-01 Well Mode changed to Suspended
1997-09-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-09-12 Perforation Treatment Performed - Jet Perforation
1997-09-12 Plug Back Performed
1997-09-12 Well Fluid changed to Crude Oil
1997-09-12 Well Mode changed to Abandoned Zone
1997-10-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-10-09 Perforation Treatment Performed - Remedial Casing
1997-10-16 Well Abandoned
1997-10-16 Well Fluid changed to Crude Oil
1997-10-16 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1962-05-10 888.80 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-06-05 Hydra Jet Perforation 1614.20 1614.20 0
1962-06-07 Acid Treatment 1614.20 1614.20 0
1962-06-08 Fracture 1614.20 1614.20 0
1997-09-12 Packing Device Capped w/Cement 1598.00 1606.00 0
1997-09-12 Perforation 433.00 434.00 13
1997-10-09 Remedial Casing Cementing 433.00 434.00 0
1997-10-09 Packing Device Capped w/Cement 332.60 445.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 1608 0.0 0.0 0.0
1968 1977 0.0 0.0 0.0
1969 4272 0.0 0.0 0.0
1970 1443 0.0 0.0 0.0
1971 5707 0.0 0.0 0.0
1972 8447 0.0 0.0 0.0
1973 8398 0.0 0.0 0.0
1974 8391 0.0 0.0 0.0
1975 8411 0.0 0.0 0.0
1976 8656 0.0 0.0 0.0
1977 8463 0.0 0.0 0.0
1978 8428 0.0 0.0 0.0
1979 2699 0.0 0.0 0.0
1980 2591 0.0 0.0 0.0
1981 6829 0.0 0.0 0.0
1982 7972 0.0 0.0 0.0
1983 5943 0.0 0.0 0.0
1984 7190 0.0 0.0 0.0
1985 5304 0.0 0.0 0.0
1986 4015 0.0 0.0 0.0
1987 5272 0.0 0.0 0.0
1988 3433 0.0 0.0 0.0
1989 5515 0.0 0.0 0.0
1990 456 0.0 0.0 0.0

For data sources see[6]

References