X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515111815000

Well Details

Well ID: 0515111815000
Loading map...
Location: 00/15-18-051-11W5/0
Location Alias: 00/15-18-51-11 W5M
Location Alias 2: 00/15-18-051-11 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 11
Section: 18
County/Municipality: Yellowhead County
Well Name: VEI PEMBINA 15-18-51-11
Operator Name: Vermilion Energy Inc.
License Number: 0424922
License Date: 2010-10-21
License Status: Issued
Spud Date: 2010-12-05
Final Drill Date: 2010-12-18
Well Total Depth: 3201.00 m
Surface Hole Latitude: 53.394975
Surface Hole Longitude: -115.608199

For data sources see[1][2]

Well History

Date Event
2010-01-07 Well Log Performed
2010-10-21 Obtained License
2010-12-07 Surface Casing Operation Performed
2010-12-10 Direction Drilling Operation Performed - Horizontal
2010-12-18 Finished Drilling
2010-12-18 Production Casing Operation Performed
2010-12-18 Rig Released
2010-12-18 Well Mode changed to Drilled and Cased
2011-01-07 Well Log Performed
2011-01-20 Perforation Treatment Performed - Multi-Stage Fracture
2011-01-21 Perforation Treatment Performed - Multi-Stage Fracture
2011-04-17 Well Began Production
2011-04-17 Well Fluid changed to Crude Oil
2011-04-17 Well Mode changed to Pumping
2016-09-01 Well Fluid changed to Crude Oil
2016-09-01 Well Mode changed to Suspended
2017-03-01 Well Fluid changed to Crude Oil
2017-03-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-12-10 1484.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-01-20 Multi-Stage Fracture 3171.90 3172.00 0
2011-01-20 Multi-Stage Fracture 2576.10 2576.20 0
2011-01-21 Multi-Stage Fracture 2504.40 2504.50 0
2011-01-21 Multi-Stage Fracture 2446.20 2446.30 0
2011-01-21 Multi-Stage Fracture 2375.20 2375.30 0
2011-01-21 Multi-Stage Fracture 2304.20 2304.30 0
2011-01-21 Multi-Stage Fracture 2231.90 2232.00 0
2011-01-21 Multi-Stage Fracture 2173.70 2173.80 0
2011-01-21 Multi-Stage Fracture 2102.10 2102.20 0
2011-01-21 Multi-Stage Fracture 2043.40 2043.50 0
2011-01-21 Multi-Stage Fracture 1972.60 1972.70 0
2011-01-20 Multi-Stage Fracture 3107.20 3107.30 0
2011-01-21 Multi-Stage Fracture 1900.70 1900.80 0
2011-01-20 Multi-Stage Fracture 3049.20 3049.30 0
2011-01-20 Multi-Stage Fracture 2977.40 2977.50 0
2011-01-20 Multi-Stage Fracture 2905.70 2905.80 0
2011-01-20 Multi-Stage Fracture 2847.60 2847.70 0
2011-01-20 Multi-Stage Fracture 2776.60 2776.70 0
2011-01-20 Multi-Stage Fracture 2705.50 2705.60 0
2011-01-20 Multi-Stage Fracture 2647.40 2647.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 5867 0.0 0.0 0.0
2012 8081 0.0 0.0 0.0
2013 8166 0.0 0.0 0.0
2014 8251 0.0 0.0 0.0
2015 4446 0.0 0.0 0.0
2017 4891 0.0 0.0 0.0
2018 6590 0.0 0.0 0.0
2019 8023 0.0 0.0 0.0
2020 2143 0.0 0.0 0.0

For data sources see[6]

References