X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515120701020

Well Details

Well ID: 0515120701020
Loading map...
Location: 02/01-07-051-12W5/0
Location Alias: 02/01-07-51-12 W5M
Location Alias 2: 02/01-07-051-12 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 12
Section: 07
County/Municipality: Yellowhead County
Well Name: VERMILION HZTL PEMBINA 1-7-51-12
Operator Name: Vermilion Energy Inc.
License Number: 0449999
License Date: 2012-11-13
License Status: Issued
Spud Date: 2013-01-03
Final Drill Date: 2013-01-10
Well Total Depth: 3400.00 m
Surface Hole Latitude: 53.384758
Surface Hole Longitude: -115.773793

For data sources see[1][2]

Well History

Date Event
2012-11-13 Obtained License
2013-01-03 Well Log Performed
2013-01-04 Surface Casing Operation Performed
2013-01-06 Direction Drilling Operation Performed - Deviate
2013-01-07 Direction Drilling Operation Performed - Horizontal
2013-01-10 Finished Drilling
2013-01-10 Well Mode changed to Drilled and Cased
2013-01-11 Production Casing Operation Performed
2013-01-12 Rig Released
2013-02-01 Well Began Production
2013-02-01 Well Fluid changed to Crude Oil
2013-02-01 Well Log Performed
2013-02-01 Well Mode changed to Pumping
2013-02-10 Perforation Treatment Performed - Open-Hole Completion
2013-02-11 Perforation Treatment Performed - Multi-Stage Fracture
2013-02-12 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-01-03 Ironhand Drilling Inc. 5 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-01-06 1447.00 Deviate (5 - 79 degrees)
2013-01-07 1967.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-02-10 Open Hole/Barefoot Completion 3372.00 3400.00 0
2013-02-12 Multi-Stage Fracture 2664.10 2664.20 0
2013-02-12 Multi-Stage Fracture 2568.40 2568.50 0
2013-02-12 Multi-Stage Fracture 2466.20 2466.30 0
2013-02-12 Multi-Stage Fracture 2381.00 2381.10 0
2013-02-12 Multi-Stage Fracture 2293.70 2293.80 0
2013-02-12 Multi-Stage Fracture 2192.80 2192.90 0
2013-02-12 Multi-Stage Fracture 2108.30 2108.40 0
2013-02-12 Multi-Stage Fracture 2035.50 2035.60 0
2013-02-11 Multi-Stage Fracture 3367.40 3367.50 0
2013-02-11 Multi-Stage Fracture 3308.30 3308.40 0
2013-02-11 Multi-Stage Fracture 3209.60 3209.70 0
2013-02-11 Multi-Stage Fracture 3124.20 3124.30 0
2013-02-11 Multi-Stage Fracture 3025.50 3025.60 0
2013-02-12 Multi-Stage Fracture 2927.40 2927.50 0
2013-02-12 Multi-Stage Fracture 2839.90 2840.00 0
2013-02-12 Multi-Stage Fracture 2752.60 2752.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-02-11 2013-02-12 1,818 1,185 N/A
2 2013-02-12 2013-02-12 1,818 425 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 4.4301 N/A
water 7732-18-5 100 77.8604 N/A
Sand (20/40) Trican silica crystalline 14808-60-7 100 14.9261 N/A
Sand (40/70) Trican silica crystalline 14808-60-7 100 0.8138 N/A
Sand (50/140) Trican silica crystalline 14808-60-7 100 0.9289 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0121 N/A
dibromoacetonitrile 3252-43-5 100 0.0121 N/A
non-hazardous ingredients Not Available 100 0.0121 N/A
polyethylene glycol 25322-68-3 100 0.0121 N/A
sodium bromide 7647-15-6 100 0.0121 N/A
EnCap-HP Trican Breaker ammonium persulfate 7727-54-0 100 0.0535 N/A
cured acrylic resin Not Available 100 0.0535 N/A
silica crystalline 14808-60-7 100 0.0535 N/A
DRA-2 Trican Buffer non-hazardous ingredients Not Available 100 0.085 N/A
CC-55 Trican Clay Control 1.3-propanediaminium-2-substitued. -hexaalkyl-. di halide 7744 100 0.1654 N/A
formic acid 64-18-6 100 0.1654 N/A
non-hazardous ingredients Not Available 100 0.1654 N/A
WXB-10 Trican Crosslinker borate salts 1319-33-1 100 0.1875 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.1875 N/A
GNE-1 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0826 N/A
propylene glycol 57-55-6 100 0.0826 N/A
WG-111L Rapid Gellant Trican Gelling Agent distillates (petroleum). hydrotreated middle 64742-46-7 100 0.4221 N/A
polysaccharide blend Not Available 100 0.4221 N/A
2 nitrogen 7727-37-9 100 42.684 N/A
Water Not Available 100 40.2637 N/A
Frac Sand - regular Trican silica crystalline 14808-60-7 100 5.3926 N/A
Encap HP Trican Breaker ammonium persulfate 7727-54-0 100 0.0466 N/A
cured acrylic resin Not Available 100 0.0466 N/A
silica crystalline 14808-60-7 100 0.0466 N/A
GBE 1:5 Trican Breaker non-hazardous ingredients Not Available 100 0.0413 N/A
propylene glycol 57-55-6 100 0.0413 N/A
WG-111L Trican Gelling Agent distillates (petroleum). hydrotreated middle 64742-46-7 100 0.3566 N/A
polysaccharide blend Not Available 100 0.3566 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-02-04 2013-02-08 Surface Water - Runoff 1891

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 6747 0.0 0.0 0.0
2014 8315 0.0 0.0 0.0
2015 8577 0.0 0.0 0.0
2016 8451 0.0 0.0 0.0
2017 8365 0.0 0.0 0.0
2018 8240 0.0 0.0 0.0
2019 8389 0.0 0.0 0.0
2020 2154 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-01-12 No Incident Encountered 0.00 0.00
2013-02-15 No Incident Encountered 0.00 0.00

For data sources see[10]

References