X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515121201000

Well Details

Well ID: 0515121201000
Loading map...
Location: 00/01-12-051-12W5/0
Location Alias: 00/01-12-51-12 W5M
Location Alias 2: 00/01-12-051-12 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 12
Section: 12
County/Municipality: Yellowhead County
Well Name: VERMILION HZ CYN-PEM 1-12-51-12
Operator Name: Vermilion Energy Inc.
License Number: 0433837
License Date: 2011-05-27
License Status: Issued
Spud Date: 2011-07-27
Final Drill Date: 2011-08-05
Well Total Depth: 3270.00 m
Surface Hole Latitude: 53.396379
Surface Hole Longitude: -115.621907

For data sources see[1][2]

Well History

Date Event
2011-05-27 Obtained License
2011-07-29 Surface Casing Operation Performed
2011-07-30 Well Log Performed
2011-07-31 Direction Drilling Operation Performed - Horizontal
2011-08-05 Finished Drilling
2011-08-05 Well Mode changed to Drilled and Cased
2011-08-07 Production Casing Operation Performed
2011-08-07 Rig Released
2011-09-18 Well Log Performed
2011-09-29 Perforation Treatment Performed - Open-Hole Completion
2011-09-30 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-01 Well Began Production
2011-10-01 Well Fluid changed to Crude Oil
2011-10-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-07-31 1445.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-09-29 Open Hole/Barefoot Completion 3266.00 3270.00 0
2011-09-30 Multi-Stage Fracture 2469.40 2469.50 0
2011-09-30 Multi-Stage Fracture 2370.40 2370.50 0
2011-09-30 Multi-Stage Fracture 2271.50 2271.60 0
2011-09-30 Multi-Stage Fracture 2172.60 2172.70 0
2011-09-30 Multi-Stage Fracture 2073.60 2073.70 0
2011-09-30 Multi-Stage Fracture 1974.70 1974.80 0
2011-09-30 Multi-Stage Fracture 3254.40 3254.50 0
2011-09-30 Multi-Stage Fracture 3175.40 3175.50 0
2011-09-30 Multi-Stage Fracture 3076.40 3076.50 0
2011-09-30 Multi-Stage Fracture 2977.50 2977.60 0
2011-09-30 Multi-Stage Fracture 2878.60 2878.70 0
2011-09-30 Multi-Stage Fracture 2766.20 2766.30 0
2011-09-30 Multi-Stage Fracture 2667.30 2667.40 0
2011-09-30 Multi-Stage Fracture 2568.30 2568.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1451 0.0 0.0 0.0
2012 8447 0.0 0.0 0.0
2013 8712 0.0 0.0 0.0
2014 8680 0.0 0.0 0.0
2015 8365 0.0 0.0 0.0
2016 8447 0.0 0.0 0.0
2017 8735 0.0 0.0 0.0
2018 8686 0.0 0.0 0.0
2019 8722 0.0 0.0 0.0
2020 2063 0.0 0.0 0.0

For data sources see[6]

References