X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515121214000

Well Details

Well ID: 0515121214000
Loading map...
Location: 00/14-12-051-12W5/0
Location Alias: 00/14-12-51-12 W5M
Location Alias 2: 00/14-12-051-12 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 12
Section: 12
County/Municipality: Yellowhead County
Well Name: VERMILION HZ PEMBINA 14-12-51-12
Operator Name: Vermilion Energy Inc.
License Number: 0438133
License Date: 2011-10-28
License Status: Amended
Spud Date: 2011-12-15
Final Drill Date: 2012-01-03
Well Total Depth: 3294.00 m
Surface Hole Latitude: 53.379519
Surface Hole Longitude: -115.640891

For data sources see[1][2]

Well History

Date Event
2011-10-28 Obtained License
2011-12-15 Lost Circulation Occurred
2011-12-17 Surface Casing Operation Performed
2011-12-30 Direction Drilling Operation Performed - Horizontal
2012-01-03 Finished Drilling
2012-01-03 Well Mode changed to Drilled and Cased
2012-01-04 Production Casing Operation Performed
2012-01-05 Rig Released
2012-01-31 Well Log Performed
2012-02-01 Well Began Production
2012-02-01 Well Fluid changed to Crude Oil
2012-02-01 Well Mode changed to Pumping
2012-02-03 Perforation Treatment Performed - Open-Hole Completion
2012-02-04 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-12-30 1380.40 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-03 Open Hole/Barefoot Completion 3290.00 3294.00 0
2012-02-04 Multi-Stage Fracture 2442.80 2442.90 0
2012-02-04 Multi-Stage Fracture 2341.30 2341.40 0
2012-02-04 Multi-Stage Fracture 2239.50 2239.60 0
2012-02-04 Multi-Stage Fracture 2123.50 2123.60 0
2012-02-04 Multi-Stage Fracture 2021.70 2021.80 0
2012-02-04 Multi-Stage Fracture 1936.20 1936.30 0
2012-02-04 Multi-Stage Fracture 3264.40 3264.50 0
2012-02-04 Multi-Stage Fracture 3183.40 3183.50 0
2012-02-04 Multi-Stage Fracture 3084.40 3084.50 0
2012-02-04 Multi-Stage Fracture 2981.30 2981.40 0
2012-02-04 Multi-Stage Fracture 2863.90 2864.00 0
2012-02-04 Multi-Stage Fracture 2762.00 2762.10 0
2012-02-04 Multi-Stage Fracture 2660.10 2660.20 0
2012-02-04 Multi-Stage Fracture 2544.70 2544.80 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 5358 0.0 0.0 0.0
2013 8696 0.0 0.0 0.0
2014 8698 0.0 0.0 0.0
2015 8743 0.0 0.0 0.0
2016 8421 0.0 0.0 0.0
2017 8600 0.0 0.0 0.0
2018 8747 0.0 0.0 0.0
2019 8745 0.0 0.0 0.0
2020 2050 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-12-15 Lost Circulation 38.00 38.00

For data sources see[7]

References