If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0515130104000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.389881,"lon":-115.785585,"icon":""}]} |
Location: 00/04-01-051-13W5/0 | |
Location Alias: 00/04-01-51-13 W5M | |
Location Alias 2: 00/04-01-051-13 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 051 | |
Meridian: 5 | |
Range: 13 | |
Section: 01 | |
County/Municipality: Yellowhead County | |
Well Name: VEI HZ PEMBINA 4-1-51-13 | |
Operator Name: Vermilion Energy Inc. | |
License Number: 0455892 | |
License Date: 2013-03-08 | |
License Status: Amended | |
Spud Date: 2013-07-18 | |
Final Drill Date: 2013-08-01 | |
Well Total Depth: 4383.00 m | |
Surface Hole Latitude: 53.389881 | |
Surface Hole Longitude: -115.785585 |
Date | Event |
---|---|
2013-03-08 | Obtained License |
2013-07-19 | Surface Casing Operation Performed |
2013-07-21 | Direction Drilling Operation Performed - Deviate |
2013-07-23 | Direction Drilling Operation Performed - Horizontal |
2013-08-01 | Finished Drilling |
2013-08-01 | Well Mode changed to Drilled and Cased |
2013-08-02 | Well Log Performed |
2013-08-04 | Production Casing Operation Performed |
2013-08-05 | Rig Released |
2013-08-08 | Well Log Performed |
2013-08-15 | Perforation Treatment Performed - Open-Hole Completion |
2013-08-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-08-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-08-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-08-19 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-08-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-08-20 | Well Began Production |
2013-08-20 | Well Fluid changed to Crude Oil |
2013-08-20 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2013-07-18 | Ironhand Drilling Inc. | 5 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2013-07-21 | 1406.00 | Deviate (5 - 79 degrees) |
2013-07-23 | 2153.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-08-15 | Open Hole/Barefoot Completion | 4378.00 | 4383.00 | 0 |
2013-08-18 | Multi-Stage Fracture | 3602.10 | 3602.20 | 0 |
2013-08-19 | Multi-Stage Fracture | 3500.20 | 3500.30 | 0 |
2013-08-19 | Multi-Stage Fracture | 3397.00 | 3397.10 | 0 |
2013-08-19 | Multi-Stage Fracture | 3295.90 | 3296.00 | 0 |
2013-08-19 | Multi-Stage Fracture | 3191.20 | 3191.30 | 0 |
2013-08-19 | Multi-Stage Fracture | 3089.10 | 3089.20 | 0 |
2013-08-19 | Multi-Stage Fracture | 2987.00 | 2987.10 | 0 |
2013-08-19 | Multi-Stage Fracture | 2870.40 | 2870.50 | 0 |
2013-08-19 | Multi-Stage Fracture | 2781.80 | 2781.90 | 0 |
2013-08-20 | Multi-Stage Fracture | 2679.60 | 2679.70 | 0 |
2013-08-16 | Multi-Stage Fracture | 4354.80 | 4354.90 | 0 |
2013-08-20 | Multi-Stage Fracture | 2549.00 | 2549.10 | 0 |
2013-08-20 | Multi-Stage Fracture | 2418.60 | 2418.70 | 0 |
2013-08-20 | Multi-Stage Fracture | 2315.70 | 2315.80 | 0 |
2013-08-20 | Multi-Stage Fracture | 2241.60 | 2241.70 | 0 |
2013-08-16 | Multi-Stage Fracture | 4305.10 | 4305.20 | 0 |
2013-08-17 | Multi-Stage Fracture | 4216.80 | 4216.90 | 0 |
2013-08-17 | Multi-Stage Fracture | 4113.30 | 4113.40 | 0 |
2013-08-17 | Multi-Stage Fracture | 4011.30 | 4011.40 | 0 |
2013-08-17 | Multi-Stage Fracture | 3908.10 | 3908.20 | 0 |
2013-08-18 | Multi-Stage Fracture | 3806.30 | 3806.40 | 0 |
2013-08-18 | Multi-Stage Fracture | 3703.40 | 3703.50 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-08-16 | 2013-08-20 | 1,854 | 2,407 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Nitrogen | 7727-37-9 | 100 | 4.094 | N/A | |||
Water | Not Available | 100 | 79.538 | N/A | ||||
20/40 | Sanjel | Crystalline Silica | 14808-60-7 | 100 | 15.1848 | N/A | ||
40/70 | Sanjel | Crystalline Silica | 14808-60-7 | 100 | 0.6701 | N/A | ||
B-1008 | Sanjel | Bactericide/Biocide | BNPD | 52-51-7 | 100 | 0.0089 | N/A | |
Methyl Alcohol | 67-56-1 | 100 | 0.0089 | N/A | ||||
BREAKER-2B | Sanjel | Breaker | Ammonium persulfate | 7727-54-0 | 100 | 0.0256 | N/A | |
Silica. crystalline - quartz | 14808-60-7 | 100 | 0.0256 | N/A | ||||
Breaker-O | Sanjel | Breaker | Ammonium Persulphate | 7727-54-0 | 100 | 0.0068 | N/A | |
Water | Not Available | 100 | 0.2451 | N/A | ||||
BUFFER-B | Sanjel | Buffer | Methanol | 67-56-1 | 100 | 0.1582 | N/A | |
Potassium Carbonate | 584-08-7 | 100 | 0.1582 | N/A | ||||
Sodium Hydroxide | 1310-73-2 | 100 | 0.1582 | N/A | ||||
Water | Not Available | 100 | 0.1582 | N/A | ||||
SCC-6L | Sanjel | Clay Control | 1.6-Hexanediamine dihydrochloride | 6055-52-3 | 100 | 0.1604 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.1604 | N/A | ||||
BX-1L | Sanjel | Crosslinker | Boric Acid. sodium salt | 1333-73-9 | 100 | 0.1629 | N/A | |
Ethylene Glycol | 107-21-1 | 100 | 0.1629 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.1629 | N/A | ||||
WG-2BL | Sanjel | Gelling Agent | No hazardous ingredients | Not Available | 100 | 0.4721 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2013-08-12 | 2013-08-12 | Surface Water - Runoff | 720 |
2013-08-21 | 2013-08-21 | Recycled Fracturing Water (treated at well site) | 1564 |
2013-08-10 | 2013-08-10 | Municipal Water | 88 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 2538 | 0.0 | 0.0 | 0.0 |
2014 | 8332 | 0.0 | 0.0 | 0.0 |
2015 | 8477 | 0.0 | 0.0 | 0.0 |
2016 | 8321 | 0.0 | 0.0 | 0.0 |
2017 | 8110 | 0.0 | 0.0 | 0.0 |
2018 | 8561 | 0.0 | 0.0 | 0.0 |
2019 | 8507 | 0.0 | 0.0 | 0.0 |
2020 | 1954 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-08-05 | No Incident Encountered | 0.00 | 0.00 |
2013-08-22 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]