X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524262602000

Well Details

Well ID: 0524262602000
Loading map...
Location: 00/02-26-052-26W4/0
Location Alias: 00/02-26-52-26 W4M
Location Alias 2: 00/02-26-052-26 W4/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 26
Section: 26
County/Municipality: Parkland County
Well Name: 1107882 ACC ACHESON 2-26-52-26
Operator Name: Obsidian Energy Ltd.
License Number: 0004003
License Date: 1951-12-27
License Status: Abandoned
Spud Date: 1952-01-28
Final Drill Date: 1952-02-29
Well Total Depth: 1553.00 m
Surface Hole Latitude: 53.514099
Surface Hole Longitude: -113.722703

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-12-27 Obtained License
1952-02-11 Drill Stem Test Performed
1952-02-20 Liner Casing Operation Performed
1952-02-24 Drill Stem Test Performed
1952-02-28 Drill Stem Test Performed
1952-02-29 Finished Drilling
1952-02-29 Well Mode changed to Drilled and Cased
1952-03-04 Perforation Treatment Performed - Jet Perforation
1952-04-18 Well Began Production
1952-04-18 Well Fluid changed to Crude Oil
1952-04-18 Well Mode changed to Flowing
1974-06-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1974-06-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-06-19 Perforation Treatment Performed - Jet Perforation
1985-12-19 Well Fluid changed to Crude Oil
1985-12-19 Well Mode changed to Pumping
1986-01-21 Well Log Performed
1986-01-22 Perforation Treatment Performed - Cement Squeeze
1986-01-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-01-23 Perforation Treatment Performed - Jet Perforation
1986-01-23 Well Log Performed
1986-01-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-01-23 Perforation Treatment Performed - Cement Squeeze
1987-01-23 Well Log Performed
1987-01-26 Perforation Treatment Performed - Jet Perforation
1987-01-26 Well Log Performed
1988-05-13 Well Fluid changed to Crude Oil
1988-05-13 Well Mode changed to Suspended
1990-10-13 Well Fluid changed to Crude Oil
1990-10-13 Well Mode changed to Pumping
1990-12-04 Well Fluid changed to Crude Oil
1990-12-04 Well Mode changed to Suspended
1992-08-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-08-06 Plug Back Performed
1992-08-06 Well Fluid changed to Crude Oil
1992-08-06 Well Log Performed
1992-08-06 Well Mode changed to Abandoned Zone
1992-08-07 Perforation Treatment Performed - Jet Perforation
1992-08-07 Well Log Performed
1992-08-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-08-08 Well Log Performed
1992-08-14 Perforation Treatment Performed - Jet Perforation
1992-08-14 Well Log Performed
1993-07-01 Well Fluid changed to Crude Oil
1993-07-01 Well Mode changed to Gas Lift
1993-07-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-07-09 Perforation Treatment Performed - Cement Squeeze
1993-07-09 Plug Back Performed
1993-07-09 Well Fluid changed to Crude Oil
1993-07-09 Well Mode changed to Gas Lift
1993-07-12 Perforation Treatment Performed - Jet Perforation
1993-07-15 Well Log Performed
1993-07-16 Perforation Treatment Performed - Jet Perforation
1993-07-16 Well Log Performed
1993-07-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-07-17 Well Log Performed
2004-12-06 Well Log Performed
2004-12-09 Perforation Treatment Performed - Jet Perforation
2004-12-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-01-10 Perforation Treatment Performed - Cement Plug
2005-01-10 Plug Back Performed
2005-01-10 Well Fluid changed to Crude Oil
2005-01-10 Well Mode changed to Abandoned Zone
2005-02-15 Perforation Treatment Performed - Cement Plug
2005-02-16 Well Log Performed
2005-02-17 Well Log Performed
2005-02-18 Perforation Treatment Performed - Jet Perforation
2005-02-19 Perforation Treatment Performed - Cement Plug
2005-02-19 Perforation Treatment Performed - Jet Perforation
2005-02-19 Well Log Performed
2005-02-23 Well Log Performed
2005-02-24 Well Log Performed
2005-03-01 Perforation Treatment Performed - Cement Plug
2005-03-02 Perforation Treatment Performed - Cement Plug
2005-03-02 Perforation Treatment Performed - Jet Perforation
2005-03-02 Well Log Performed
2005-03-03 Perforation Treatment Performed - Cement Plug
2005-03-03 Well Log Performed
2005-03-04 Well Abandoned
2008-09-08 Well Log Performed
2008-09-11 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-03-04 Perforation 1545.30 1551.40 13
1987-01-26 Perforation 1517.00 1518.00 13
1992-08-06 Packing Device Capped w/Cement 1494.00 1502.00 0
1992-08-07 Perforation 1418.20 1419.10 14
1992-08-08 Acid Treatment 1418.20 1419.10 0
1992-08-14 Perforation 1414.40 1417.00 14
1993-07-08 Acid Treatment 1414.40 1419.10 0
1993-07-09 Cement Squeeze 1414.40 1419.10 0
1993-07-12 Perforation 1517.00 1518.00 13
1993-07-12 Perforation 1545.30 1551.40 13
1993-07-16 Perforation 1533.80 1534.30 20
1974-06-18 Packing Device Capped w/Cement 1532.20 1536.20 0
1993-07-16 Perforation 1537.30 1537.80 20
1993-07-16 Perforation 1539.50 1540.00 20
1993-07-16 Perforation 1541.70 1542.20 20
1993-07-17 Acid Treatment 1533.80 1551.40 0
2004-12-09 Perforation 1515.70 1521.60 17
2004-12-09 Perforation 1522.10 1527.60 17
2004-12-11 Acid Treatment 1515.70 1521.60 0
2004-12-11 Acid Treatment 1522.10 1527.60 0
2005-01-10 Cement Plug 1330.00 1553.00 0
2005-02-15 Cement Plug 1146.00 1200.00 0
1974-06-19 Perforation 1527.00 1530.10 7
2005-02-18 Perforation 470.00 470.30 36
2005-02-18 Perforation 437.00 437.30 36
2005-02-18 Perforation 383.00 383.30 36
2005-02-19 Perforation 350.00 350.30 36
2005-02-19 Perforation 335.00 335.30 36
2005-02-19 Perforation 317.00 317.30 36
2005-02-19 Perforation 285.00 285.30 36
2005-02-19 Perforation 269.00 269.30 36
2005-02-19 Perforation 250.00 250.30 36
2005-02-19 Cement Plug 228.50 264.50 0
1974-06-19 Acid Treatment 1527.00 1530.10 0
2005-03-01 Cement Plug 97.30 219.80 0
2005-03-02 Cement Plug 71.60 97.00 0
2005-03-02 Perforation 38.00 39.00 27
2005-03-03 Cement Plug 39.00 71.60 0
2005-03-03 Cement Plug 0.10 39.00 0
1986-01-22 Cement Squeeze 1527.00 1530.00 0
1986-01-23 Perforation 1521.00 1525.00 13
1986-01-23 Acid Treatment 1521.00 1525.00 0
1986-01-25 Acid Treatment 1521.00 1525.00 0
1987-01-23 Cement Squeeze 1521.00 1525.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1974 2697 0.0 0.0 0.0
1975 5809 0.0 0.0 0.0
1976 6108 0.0 0.0 0.0
1977 5927 0.0 0.0 0.0
1978 5594 0.0 0.0 0.0
1979 7779 0.0 0.0 0.0
1980 6791 0.0 0.0 0.0
1981 8289 0.0 0.0 0.0
1982 6560 0.0 0.0 0.0
1983 5145 0.0 0.0 0.0
1984 8385 0.0 0.0 0.0
1985 7699 0.0 0.0 0.0
1986 7107 0.0 0.0 0.0
1987 7951 0.0 0.0 0.0
1988 2552 0.0 0.0 0.0
1990 550 0.0 0.0 0.0
1993 2151 0.0 0.0 0.0
1994 6001 0.0 0.0 0.0
1995 59 0.0 0.0 0.0
1996 2631 0.0 0.0 0.0
1997 6553 0.0 0.0 0.0
1998 5177 0.0 0.0 0.0
1999 1300 0.0 0.0 0.0
2000 256 0.0 0.0 0.0
2001 4072 0.0 0.0 0.0
2002 1161 0.0 0.0 0.0
2003 48 0.0 0.0 0.0

For data sources see[5]

References