X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524262604000

Well Details

Well ID: 0524262604000
Loading map...
Location: 00/04-26-052-26W4/0
Location Alias: 00/04-26-52-26 W4M
Location Alias 2: 00/04-26-052-26 W4/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 26
Section: 26
County/Municipality: Parkland County
Well Name: CEDAR CREEK ACH 4-26-52-26
Operator Name: MAGA Energy Operations Ltd.
License Number: 0003483
License Date: 1951-09-15
License Status: Suspension
Spud Date: 1951-09-15
Final Drill Date: 1951-10-19
Well Total Depth: 1556.00 m
Surface Hole Latitude: 53.514361
Surface Hole Longitude: -113.734817

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-09-15 Obtained License
1951-09-29 Drill Stem Test Performed
1951-09-30 Drill Stem Test Performed
1951-10-04 Drill Stem Test Performed
1951-10-17 Production Casing Operation Performed
1951-10-19 Finished Drilling
1951-10-19 Perforation Treatment Performed - Open-Hole Completion
1951-10-19 Well Mode changed to Drilled and Cased
1951-10-21 Well Began Production
1951-10-21 Well Fluid changed to Crude Oil
1951-10-21 Well Mode changed to Flowing
1974-07-17 Perforation Treatment Performed - Alcohol Squeeze
1974-07-17 Perforation Treatment Performed - Cement Plug
1974-07-17 Perforation Treatment Performed - Open-Hole Completion
1982-08-10 Perforation Treatment Performed - Jet Perforation
1986-01-20 Well Fluid changed to Crude Oil
1986-01-20 Well Mode changed to Suspended
1988-04-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-04-11 Plug Back Performed
1988-04-11 Well Fluid changed to Crude Oil
1988-04-11 Well Mode changed to Abandoned Zone
1988-04-12 Perforation Treatment Performed - Jet Perforation
1994-10-20 Perforation Treatment Performed - Cement Squeeze
1994-10-24 Perforation Treatment Performed - Jet Perforation
1994-10-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-10-27 Perforation Treatment Performed - Chemical Squeeze
1994-10-31 Perforation Treatment Performed - Jet Perforation
1994-11-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-11-03 Perforation Treatment Performed - Jet Perforation
1994-11-03 Plug Back Performed
2001-05-26 Perforation Treatment Performed - Jet Perforation
2005-10-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-10-25 Plug Back Performed
2005-10-27 Well Log Performed
2005-10-28 Perforation Treatment Performed - Jet Perforation
2008-11-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-08-10 Perforation Treatment Performed - Cement Squeeze
2011-08-10 Plug Back Performed
2011-08-14 Perforation Treatment Performed - Jet Perforation
2011-08-14 Well Log Performed
2011-08-15 Perforation Treatment Performed - Fractured
2013-07-23 Perforation Treatment Performed - Jet Perforation
2013-07-23 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-10-19 Open Hole/Barefoot Completion 1528.60 1556.00 0
1994-10-26 Acid Treatment 1319.50 1322.50 0
1994-10-27 Chemical Squeeze 1319.50 1322.50 0
1994-10-31 Perforation 1315.50 1318.00 14
1994-11-03 Packing Device Capped w/Cement 1302.00 1310.00 0
1994-11-03 Perforation 1267.50 1269.00 18
2001-05-26 Perforation 1257.80 1263.80 16
2005-10-25 Packing Device Capped w/Cement 1242.00 1250.00 0
2005-10-28 Perforation 1040.30 1043.90 20
2005-10-28 Perforation 1030.50 1032.50 20
2008-11-26 Acid Treatment 1030.50 1043.90 0
1974-07-17 Alchohol Squeeze 1528.60 1556.00 0
2011-08-10 Cement Squeeze 1030.50 1032.50 0
2011-08-10 Cement Squeeze 1043.30 1043.90 0
2011-08-14 Perforation 1234.50 1237.50 17
2011-08-15 Fracture 1234.50 1237.50 0
2013-07-23 Perforation 1040.30 1043.90 20
2013-07-23 Perforation 1030.50 1033.00 20
1974-07-17 Cement Plug 1540.50 1556.00 0
1974-07-17 Open Hole/Barefoot Completion 1528.60 1540.50 0
1982-08-10 Perforation 1535.20 1537.20 13
1988-04-11 Packing Device Capped w/Cement 1510.50 1518.50 0
1988-04-12 Perforation 1030.40 1031.90 13
1994-10-20 Cement Squeeze 1030.40 1031.90 0
1994-10-24 Perforation 1319.50 1322.50 18

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 3663 0.0 0.0 0.0
1968 3652 0.0 0.0 0.0
1969 4158 0.0 0.0 0.0
1970 6204 0.0 0.0 0.0
1971 4587 0.0 0.0 0.0
1972 5539 0.0 0.0 0.0
1973 7763 0.0 0.0 0.0
1974 6248 0.0 0.0 0.0
1975 4672 0.0 0.0 0.0
1976 3956 0.0 0.0 0.0
1977 4767 0.0 0.0 0.0
1978 5914 0.0 0.0 0.0
1979 8055 0.0 0.0 0.0
1980 7721 0.0 0.0 0.0
1981 7217 0.0 0.0 0.0
1982 7799 0.0 0.0 0.0
1983 8436 0.0 0.0 0.0
1984 8104 0.0 0.0 0.0
1985 7009 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-07-24 No Incident Encountered 0.00 0.00

For data sources see[6]

References