X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524262605000

Well Details

Well ID: 0524262605000
Loading map...
Location: 00/05-26-052-26W4/0
Location Alias: 00/05-26-52-26 W4M
Location Alias 2: 00/05-26-052-26 W4/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 26
Section: 26
County/Municipality: Parkland County
Well Name: CEDAR CREEK ACH 5-26-52-26
Operator Name: MAGA Energy Operations Ltd.
License Number: 0003331
License Date: 1951-08-16
License Status: Suspension
Spud Date: 1951-08-17
Final Drill Date: 1951-09-09
Well Total Depth: 1589.10 m
Surface Hole Latitude: 53.517705
Surface Hole Longitude: -113.734825

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-08-16 Obtained License
1951-09-04 Production Casing Operation Performed
1951-09-09 Finished Drilling
1951-09-09 Perforation Treatment Performed - Open-Hole Completion
1951-09-09 Well Mode changed to Drilled and Cased
1951-09-12 Well Began Production
1951-09-12 Well Fluid changed to Crude Oil
1951-09-12 Well Mode changed to Flowing
1968-06-14 Perforation Treatment Performed - Cement Plug
1968-06-14 Perforation Treatment Performed - Open-Hole Completion
1986-04-18 Well Fluid changed to Crude Oil
1986-04-18 Well Mode changed to Pumping
1991-01-22 Well Fluid changed to Crude Oil
1991-01-22 Well Mode changed to Suspended
1991-05-06 Perforation Treatment Performed - Open-Hole Completion
1991-05-06 Well Log Performed
1991-05-07 Well Type changed to Observation
1991-08-16 Well Log Performed
1991-11-12 Well Log Performed
1992-02-21 Well Log Performed
1992-05-04 Well Log Performed
1992-05-08 Well Log Performed
1992-05-10 Perforation Treatment Performed - Jet Perforation
1992-05-10 Well Log Performed
1992-05-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-05-25 Perforation Treatment Performed - Chemical Squeeze
1992-06-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-06-04 Well Type changed to Observation
1992-11-13 Well Log Performed
1993-02-16 Well Log Performed
1993-05-06 Well Log Performed
1994-03-22 Perforation Treatment Performed - Chemical Squeeze
1996-02-07 Well Log Performed
1996-07-08 Well Log Performed
1996-10-23 Well Fluid changed to Crude Oil
1996-10-23 Well Mode changed to Pumping
1997-01-07 Well Log Performed
1997-08-22 Well Log Performed
1998-03-12 Well Log Performed
1998-10-12 Well Log Performed
1999-03-26 Well Log Performed
2000-01-01 Well Fluid changed to Crude Oil
2000-01-01 Well Mode changed to Suspended
2000-02-29 Well Log Performed
2001-04-24 Well Log Performed
2001-10-15 Well Log Performed
2002-01-15 Well Log Performed
2002-05-06 Well Log Performed
2002-08-16 Well Log Performed
2004-07-22 Well Log Performed
2005-06-15 Well Log Performed
2005-09-15 Well Log Performed
2006-02-01 Well Fluid changed to Crude Oil
2006-02-01 Well Mode changed to Pumping
2007-07-12 Well Fluid changed to Crude Oil
2007-07-12 Well Mode changed to Suspended
2007-10-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-10-22 Plug Back Performed
2007-10-22 Well Fluid changed to Crude Oil
2007-10-22 Well Mode changed to Abandoned Zone
2007-10-23 Perforation Treatment Performed - Cement Squeeze
2007-10-23 Plug Back Performed
2007-10-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-10-26 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-09-09 Open Hole/Barefoot Completion 1523.70 1555.70 0
2007-10-22 Packing Device Capped w/Cement 1507.00 1515.00 0
2007-10-23 Cement Squeeze 1267.50 1268.50 0
2007-10-26 Perforation 1328.00 1333.00 20
2007-10-26 Acid Treatment 1328.00 1333.00 0
1968-06-14 Cement Plug 1533.80 1555.70 0
1968-06-14 Open Hole/Barefoot Completion 1523.70 1533.80 0
1991-05-06 Open Hole/Barefoot Completion 1523.70 1589.10 0
1992-05-10 Perforation 1267.50 1268.50 13
1992-05-12 Acid Treatment 1267.50 1268.50 0
1992-05-25 Chemical Squeeze 1267.50 1268.50 0
1992-06-02 Acid Treatment 1267.50 1268.50 0
1994-03-22 Chemical Squeeze 1267.50 1589.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 5510 0.0 0.0 0.0
1968 3999 0.0 0.0 0.0
1969 2067 0.0 0.0 0.0
1970 2810 0.0 0.0 0.0
1971 4501 0.0 0.0 0.0
1972 6366 0.0 0.0 0.0
1973 7725 0.0 0.0 0.0
1974 7112 0.0 0.0 0.0
1975 6778 0.0 0.0 0.0
1976 5850 0.0 0.0 0.0
1977 5915 0.0 0.0 0.0
1978 6373 0.0 0.0 0.0
1979 8196 0.0 0.0 0.0
1980 7952 0.0 0.0 0.0
1981 7628 0.0 0.0 0.0
1982 7943 0.0 0.0 0.0
1983 8436 0.0 0.0 0.0
1984 8455 0.0 0.0 0.0
1985 8469 0.0 0.0 0.0
1986 6851 0.0 0.0 0.0
1987 8373 0.0 0.0 0.0
1988 8178 0.0 0.0 0.0
1989 7931 0.0 0.0 0.0
1990 8243 0.0 0.0 0.0
1991 504 0.0 0.0 0.0
1996 1342 0.0 0.0 0.0
1997 2715 0.0 0.0 0.0
2006 912 0.0 0.0 0.0

For data sources see[5]

References