X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524263409002

Well Details

Well ID: 0524263409002
Loading map...
Location: 00/09-34-052-26W4/2
Location Alias: 00/09-34-52-26 W4M
Location Alias 2: 00/09-34-052-26 W4/02
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 26
Section: 34
County/Municipality: Parkland County
Well Name: CEDAR CREEK ACH 9-34-52-26
Operator Name: MAGA Energy Operations Ltd.
License Number: 0003607
License Date: 1951-10-12
License Status: Suspension
Spud Date: 1951-10-11
Final Drill Date: 1951-11-18
Well Total Depth: 1556.00 m
Surface Hole Latitude: 53.535694
Surface Hole Longitude: -113.741251

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-10-12 Obtained License
1951-11-15 Production Casing Operation Performed
1951-11-18 Finished Drilling
1951-11-18 Perforation Treatment Performed - Open-Hole Completion
1951-11-18 Well Mode changed to Drilled and Cased
1974-10-22 Perforation Treatment Performed - Cement Plug
1974-10-22 Perforation Treatment Performed - Open-Hole Completion
1975-10-02 Perforation Treatment Performed - Cement Plug
1975-10-02 Perforation Treatment Performed - Open-Hole Completion
1975-10-07 Perforation Treatment Performed - Open-Hole Completion
1981-04-21 Perforation Treatment Performed - Cement Plug
1981-04-21 Perforation Treatment Performed - Open-Hole Completion
1983-03-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-11-05 Perforation Treatment Performed - Jet Perforation
1985-11-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-11-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-11-28 Perforation Treatment Performed - Fractured
1985-12-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-12-02 Plug Back Performed
1985-12-03 Perforation Treatment Performed - Jet Perforation
1985-12-06 Perforation Treatment Performed - Fractured
1985-12-20 Well Began Production
1985-12-20 Well Fluid changed to Crude Oil
1985-12-20 Well Mode changed to Pumping
1988-04-29 Well Fluid changed to Crude Oil
1988-04-29 Well Mode changed to Suspended
2002-11-07 Perforation Treatment Performed - Jet Perforation
2002-12-06 Well Fluid changed to Crude Oil
2002-12-06 Well Mode changed to Pumping
2006-03-03 Perforation Treatment Performed - Cement Squeeze
2006-03-07 Well Fluid changed to Crude Oil
2006-03-07 Well Mode changed to Suspended
2006-03-10 Perforation Treatment Performed - Jet Perforation
2006-03-10 Well Log Performed
2006-03-11 Perforation Treatment Performed - Fractured
2006-10-25 Perforation Treatment Performed - Jet Perforation
2006-10-25 Well Log Performed
2011-07-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-07-23 Plug Back Performed
2011-07-24 Perforation Treatment Performed - Jet Perforation
2011-07-24 Well Log Performed
2011-07-25 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-11-18 Open Hole/Barefoot Completion 1539.80 1556.00 0
1985-11-05 Perforation 1412.50 1415.00 13
1985-11-06 Acid Treatment 1412.50 1415.00 0
1985-11-07 Acid Treatment 1412.50 1415.00 0
1985-11-28 Fracture 1412.50 1415.00 0
1985-12-02 Packing Device Capped w/Cement 1393.00 1401.00 0
1985-12-03 Perforation 1241.00 1243.00 20
1985-12-06 Fracture 1241.00 1243.00 0
2002-11-07 Perforation 1243.00 1251.60 1
2006-03-03 Cement Squeeze 1241.00 1251.60 0
2006-03-10 Perforation 1333.80 1336.20 20
1974-10-22 Cement Plug 1546.60 1550.50 0
2006-03-10 Perforation 1330.10 1332.30 20
2006-03-11 Fracture 1330.10 1336.20 0
2006-10-25 Perforation 1321.00 1323.00 17
2011-07-23 Packing Device Capped w/Cement 1312.00 1320.00 0
2011-07-24 Perforation 1234.70 1236.60 20
2011-07-25 Fracture 1234.70 1236.60 0
1974-10-22 Open Hole/Barefoot Completion 1539.80 1546.60 0
1975-10-02 Cement Plug 1543.50 1546.60 0
1975-10-02 Open Hole/Barefoot Completion 1539.80 1543.50 0
1975-10-07 Open Hole/Barefoot Completion 1539.80 1545.00 0
1981-04-21 Cement Plug 1543.30 1545.00 0
1981-04-21 Open Hole/Barefoot Completion 1539.80 1543.30 0
1983-03-12 Packing Device Capped w/Cement 1515.00 1515.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 288 0.0 0.0 0.0
1986 4616 0.0 0.0 0.0
1987 7972 0.0 0.0 0.0
1988 2271 0.0 0.0 0.0
2002 406 0.0 0.0 0.0
2003 8094 0.0 0.0 0.0
2004 612 0.0 0.0 0.0
2006 72 0.0 0.0 0.0

For data sources see[5]

References