X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524263510002

Well Details

Well ID: 0524263510002
Loading map...
Location: 00/10-35-052-26W4/2
Location Alias: 00/10-35-52-26 W4M
Location Alias 2: 00/10-35-052-26 W4/02
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 26
Section: 35
County/Municipality: Parkland County
Well Name: CHEVRON WELBOURN ACHESON 10-35-52-26
Operator Name: Chevron Canada Limited
License Number: 0004675
License Date: 1952-05-17
License Status: RecCertified
Spud Date: 1952-05-20
Final Drill Date: 1952-06-12
Well Total Depth: 1545.90 m
Surface Hole Latitude: 53.535150
Surface Hole Longitude: -113.723250

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-05-17 Obtained License
1952-06-09 Production Casing Operation Performed
1952-06-12 Finished Drilling
1952-06-12 Perforation Treatment Performed - Open-Hole Completion
1952-06-12 Well Mode changed to Drilled and Cased
1982-10-23 Perforation Treatment Performed - Cement Plug
1982-10-23 Perforation Treatment Performed - Open-Hole Completion
1982-10-25 Perforation Treatment Performed - Jet Perforation
1982-10-27 Perforation Treatment Performed - Cement Plug
1982-10-27 Perforation Treatment Performed - Open-Hole Completion
1992-08-20 Perforation Treatment Performed - Jet Perforation
1992-08-20 Well Log Performed
1992-08-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-09-15 Well Began Production
1992-09-15 Well Fluid changed to Crude Oil
1992-09-15 Well Mode changed to Pumping
1995-03-01 Well Fluid changed to Crude Oil
1995-03-01 Well Mode changed to Suspended
1998-11-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-11-08 Plug Back Performed
1998-11-19 Well Abandoned
1998-11-19 Well Fluid changed to Crude Oil
1998-11-19 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-06-12 Open Hole/Barefoot Completion 1503.60 1545.90 0
1998-11-08 Packing Device Capped w/Cement 1401.00 1409.00 0
1982-10-23 Cement Plug 1530.00 1545.90 0
1982-10-23 Open Hole/Barefoot Completion 1503.60 1530.00 0
1982-10-25 Perforation 1527.60 1529.60 13
1982-10-27 Cement Plug 1527.10 1530.00 0
1982-10-27 Open Hole/Barefoot Completion 1503.60 1527.10 0
1992-08-20 Perforation 1412.70 1413.30 16
1992-08-24 Acid Treatment 1412.70 1413.30 0
1998-11-08 Packing Device Capped w/Cement 1482.00 1490.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 174 0.0 0.0 0.0

For data sources see[5]

References