X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0525030210000

Well Details

Well ID: 0525030210000
Loading map...
Location: 00/10-02-052-03W5/0
Location Alias: 00/10-02-52-03 W5M
Location Alias 2: 00/10-02-052-03 W5/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 5
Range: 03
Section: 02
County/Municipality: Parkland County
Well Name: ENRON ET AL HIGHVALE 10-2-52-3
Operator Name: Canadian Natural Resources Limited
License Number: 0113840
License Date: 1985-03-08
License Status: RecCertified
Spud Date: 1985-03-15
Final Drill Date: 1985-03-20
Well Total Depth: 1509.00 m
Surface Hole Latitude: 53.463449
Surface Hole Longitude: -114.330325

For data sources see[1][2]

Well History

Date Event
1985-03-08 Obtained License
1985-03-16 Lost Circulation Occurred
1985-03-16 Surface Casing Operation Performed
1985-03-20 Finished Drilling
1985-03-21 Drill Stem Test Performed
1985-03-21 Well Log Performed
1985-03-22 Drill Stem Test Performed
1985-03-23 Production Casing Operation Performed
1985-03-23 Rig Released
1985-05-16 Well Log Performed
1985-05-18 Perforation Treatment Performed - Jet Perforation
1985-05-21 Perforation Treatment Performed - Fractured
1985-05-29 Well Mode changed to Drilled and Cased
1985-06-11 Well Log Performed
2000-08-31 Well Log Performed
2000-09-01 Perforation Treatment Performed - Jet Perforation
2000-09-01 Well Mode changed to Drilled and Cased
2002-07-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-07-09 Perforation Treatment Performed - Jet Perforation
2002-07-09 Plug Back Performed
2002-07-09 Well Log Performed
2002-07-09 Well Mode changed to Abandoned Zone
2002-07-10 Perforation Treatment Performed - Cement Squeeze
2002-07-12 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-05-18 Perforation 1466.00 1467.50 13
1985-05-21 Fracture 1466.00 1467.50 0
2000-09-01 Perforation 729.50 731.50 17
2002-07-09 Packing Device Capped w/Cement 1434.00 1442.00 0
2002-07-09 Packing Device Capped w/Cement 712.00 720.00 0
2002-07-09 Perforation 317.00 318.00 10
2002-07-10 Cement Squeeze 317.00 318.00 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1985-03-16 Lost Circulation 145.00 145.00

For data sources see[5]

References