If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0534113011000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.610286,"lon":-111.613374,"icon":""}]} |
Location: 00/11-30-053-11W4/0 | |
Location Alias: 00/11-30-53-11 W4M | |
Location Alias 2: 00/11-30-053-11 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 053 | |
Meridian: 4 | |
Range: 11 | |
Section: 30 | |
County/Municipality: County of Two Hills No. 21 | |
Well Name: DORSET PLAIN 11-30-53-11 | |
Operator Name: Baytex Energy Ltd. | |
License Number: 0073188 | |
License Date: 1978-11-27 | |
License Status: Abandoned | |
Spud Date: 1978-12-02 | |
Final Drill Date: 1978-12-06 | |
Well Total Depth: 750.00 m | |
Surface Hole Latitude: 53.610286 | |
Surface Hole Longitude: -111.613374 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1978-11-27 | Obtained License |
1978-12-06 | Finished Drilling |
1978-12-08 | Drill Stem Test Performed |
1978-12-09 | Production Casing Operation Performed |
1979-02-01 | Well Mode changed to Drilled and Cased |
1979-02-09 | Perforation Treatment Performed - Jet Perforation |
1979-02-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1979-02-12 | Perforation Treatment Performed - Cement Squeeze |
1979-02-13 | Perforation Treatment Performed - Jet Perforation |
1979-02-13 | Well Mode changed to Drilled and Cased |
1980-12-01 | Well Began Production |
1980-12-01 | Well Fluid changed to Gas |
1980-12-01 | Well Mode changed to Flowing |
1983-06-01 | Well Fluid changed to Gas |
1983-06-01 | Well Mode changed to Suspended |
1997-11-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1997-11-16 | Plug Back Performed |
1997-11-16 | Well Fluid changed to Gas |
1997-11-16 | Well Log Performed |
1997-11-16 | Well Mode changed to Abandoned Zone |
1997-11-25 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1979-02-09 | Perforation | 624.50 | 626.00 | 14 |
1979-02-12 | Acid Treatment | 624.50 | 626.00 | 0 |
1979-02-12 | Cement Squeeze | 624.50 | 626.00 | 0 |
1979-02-13 | Perforation | 621.50 | 623.50 | 7 |
1979-02-13 | Perforation | 578.50 | 580.00 | 7 |
1997-11-16 | Packing Device Capped w/Cement | 606.00 | 612.00 | 0 |
1997-11-16 | Packing Device Capped w/Cement | 562.00 | 570.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1980 | 722 | 0.0 | 0.0 | 0.0 |
1981 | 6563 | 0.0 | 0.0 | 0.0 |
1982 | 7815 | 0.0 | 0.0 | 0.0 |
1983 | 1028 | 0.0 | 0.0 | 0.0 |
For data sources see[5]