X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0534122206000

Well Details

Well ID: 0534122206000
Loading map...
Location: 00/06-22-053-12W4/0
Location Alias: 00/06-22-53-12 W4M
Location Alias 2: 00/06-22-053-12 W4/00
Country: Canada
Province: Alberta
Township: 053
Meridian: 4
Range: 12
Section: 22
County/Municipality: County of Two Hills No. 21
Well Name: DORSET PLAIN 6-22-53-12
Operator Name: Baytex Energy Ltd.
License Number: 0037493
License Date: 1969-12-29
License Status: RecCertified
Spud Date: 1970-01-11
Final Drill Date: 1970-01-18
Well Total Depth: 743.70 m
Surface Hole Latitude: 53.589883
Surface Hole Longitude: -111.690129

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-12-29 Obtained License
1970-01-18 Finished Drilling
1970-01-22 Production Casing Operation Performed
1970-02-03 Perforation Treatment Performed - Cement Squeeze
1970-02-03 Perforation Treatment Performed - Jet Perforation
1970-02-05 Perforation Treatment Performed - Jet Perforation
1970-02-08 Perforation Treatment Performed - Cement Squeeze
1970-02-08 Perforation Treatment Performed - Jet Perforation
1970-02-08 Well Mode changed to Drilled and Cased
1974-12-31 Perforation Treatment Performed - Jet Perforation
1974-12-31 Well Mode changed to Drilled and Cased
1975-04-03 Well Began Production
1975-04-03 Well Fluid changed to Gas
1975-04-03 Well Mode changed to Flowing
1977-01-01 Well Fluid changed to Gas
1977-01-01 Well Mode changed to Suspended
1977-06-01 Well Fluid changed to Gas
1977-06-01 Well Mode changed to Flowing
1979-09-25 Perforation Treatment Performed - Jet Perforation
1979-09-25 Well Fluid changed to Gas
1979-09-25 Well Mode changed to Suspended
1994-10-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-10-09 Perforation Treatment Performed - Jet Perforation
1994-10-09 Plug Back Performed
1994-10-09 Well Fluid changed to Gas
1994-10-09 Well Mode changed to Abandoned Zone
1994-10-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-10-10 Perforation Treatment Performed - Remedial Casing
1994-11-05 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1970-02-03 Perforation 637.00 640.10 7
1994-10-09 Perforation 190.90 191.40 13
1994-10-10 Remedial Casing Cementing 190.90 191.40 0
1994-10-10 Packing Device Capped w/Cement 157.00 186.00 0
1970-02-03 Cement Squeeze 637.00 640.10 0
1970-02-05 Perforation 613.90 618.70 7
1970-02-08 Cement Squeeze 613.90 618.70 0
1970-02-08 Perforation 592.80 595.60 7
1974-12-31 Perforation 600.20 601.40 7
1979-09-25 Perforation 554.70 556.30 13
1994-10-09 Packing Device Capped w/Cement 579.00 587.00 0
1994-10-09 Packing Device Capped w/Cement 536.00 544.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1970 0 0.0 0.0 0.0
1975 6470 0.0 0.0 0.0
1976 4367 0.0 0.0 0.0
1977 4299 0.0 0.0 0.0
1978 6454 0.0 0.0 0.0
1979 3137 0.0 0.0 0.0
1980 4166 0.0 0.0 0.0
1981 609 0.0 0.0 0.0

For data sources see[5]

References