X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0534260205002

Well Details

Well ID: 0534260205002
Loading map...
Location: 00/05-02-053-26W4/2
Location Alias: 00/05-02-53-26 W4M
Location Alias 2: 00/05-02-053-26 W4/02
Country: Canada
Province: Alberta
Township: 053
Meridian: 4
Range: 26
Section: 02
County/Municipality: Parkland County
Well Name: TIDEWATER ACH 5-2-53-26
Operator Name: Tidewater Midstream and Infrastructure Ltd.
License Number: 0002346
License Date: 1950-11-23
License Status: Issued
Spud Date: 1950-12-01
Final Drill Date: 1951-01-04
Well Total Depth: 1586.20 m
Surface Hole Latitude: 53.546729
Surface Hole Longitude: -113.734902

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-11-23 Obtained License
1950-12-31 Production Casing Operation Performed
1951-01-04 Finished Drilling
1951-01-04 Well Mode changed to Drilled and Cased
1951-01-07 Perforation Treatment Performed - Open-Hole Completion
1973-09-10 Perforation Treatment Performed - Open-Hole Completion
1979-09-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-09-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-06-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-04-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-11-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-10-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-11-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-03-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-12-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-09-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-12-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-04-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-09-16 Well Log Performed
1992-09-17 Perforation Treatment Performed - Cement Plug
1992-09-18 Perforation Treatment Performed - Open-Hole Completion
1992-09-19 Liner Casing Operation Performed
1992-09-19 Perforation Treatment Performed - Cement Squeeze
1992-09-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-09-22 Perforation Treatment Performed - Jet Perforation
1992-09-22 Well Log Performed
1992-09-23 Well Log Performed
2004-08-08 Perforation Treatment Performed - Jet Perforation
2005-08-08 Well Log Performed
2006-12-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-12-06 Perforation Treatment Performed - Cement Plug
2006-12-06 Plug Back Performed
2006-12-06 Well Log Performed
2006-12-07 Perforation Treatment Performed - Jet Perforation
2006-12-07 Well Log Performed
2006-12-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-12-24 Well Began Production
2006-12-24 Well Fluid changed to Crude Oil
2006-12-24 Well Mode changed to Pumping
2008-06-27 Perforation Treatment Performed - Jet Perforation
2008-06-27 Well Log Performed
2008-07-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-02-27 Perforation Treatment Performed - Chemical Squeeze
2011-05-26 Perforation Treatment Performed - Jet Perforation
2011-05-26 Well Log Performed
2011-05-27 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-01-07 Open Hole/Barefoot Completion 1517.00 1555.10 0
1984-03-21 Acid Treatment 1517.00 1586.20 0
1984-12-13 Acid Treatment 1517.00 1586.20 0
1985-09-04 Acid Treatment 1517.00 1586.20 0
1985-12-27 Acid Treatment 1517.00 1586.20 0
1986-04-28 Acid Treatment 1517.00 1586.20 0
1992-09-17 Cement Plug 1531.00 1586.20 0
1992-09-18 Open Hole/Barefoot Completion 1517.00 1584.00 0
1992-09-19 Cement Squeeze 1517.00 1584.00 0
1992-09-22 Perforation 1533.50 1534.00 20
1992-09-22 Perforation 1537.90 1538.40 20
1973-09-10 Open Hole/Barefoot Completion 1555.10 1586.20 0
1992-09-22 Perforation 1539.90 1540.40 20
1992-09-22 Perforation 1541.90 1542.40 20
1992-09-22 Perforation 1543.90 1544.40 20
1992-09-22 Perforation 1545.90 1546.40 20
1992-09-22 Perforation 1547.90 1548.40 20
1992-09-22 Perforation 1564.50 1566.50 20
1992-09-22 Acid Treatment 1533.50 1566.50 0
2004-08-08 Perforation 1531.20 1532.20 20
2006-12-06 Packing Device Capped w/Cement 1516.00 1524.00 0
2006-12-06 Cement Plug 1396.80 1460.00 0
1979-09-28 Acid Treatment 1517.00 1586.20 0
2006-12-07 Perforation 1324.70 1326.80 17
2006-12-13 Acid Treatment 1324.70 1326.80 0
2008-06-27 Perforation 1321.00 1324.00 20
2008-07-04 Acid Treatment 1321.00 1326.80 0
2009-02-27 Chemical Squeeze 1321.00 1326.80 0
2011-05-26 Perforation 1343.00 1347.50 20
2011-05-27 Acid Treatment 1343.00 1347.50 0
2011-05-27 Acid Treatment 1321.00 1326.80 0
1979-09-29 Acid Treatment 1517.00 1586.20 0
1980-06-11 Acid Treatment 1517.00 1586.20 0
1982-04-01 Acid Treatment 1517.00 1586.20 0
1982-11-04 Acid Treatment 1517.00 1586.20 0
1983-10-17 Acid Treatment 1517.00 1586.20 0
1983-11-07 Acid Treatment 1517.00 1586.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 188 0.0 0.0 0.0
2007 8693 0.0 0.0 0.0
2008 8409 0.0 0.0 0.0
2009 8086 0.0 0.0 0.0
2010 8388 0.0 0.0 0.0
2011 8708 0.0 0.0 0.0
2012 8725 0.0 0.0 0.0
2013 8638 0.0 0.0 0.0
2014 8570 0.0 0.0 0.0
2015 8374 0.0 0.0 0.0
2016 8377 0.0 0.0 0.0
2017 8135 0.0 0.0 0.0
2018 7383 0.0 0.0 0.0
2019 8383 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References