X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0534260315020

Well Details

Well ID: 0534260315020
Loading map...
Location: 02/15-03-053-26W4/0
Location Alias: 02/15-03-53-26 W4M
Location Alias 2: 02/15-03-053-26 W4/00
Country: Canada
Province: Alberta
Township: 053
Meridian: 4
Range: 26
Section: 03
County/Municipality: Parkland County
Well Name: 1107882 ACC ACHESON 15-3-53-26
Operator Name: Obsidian Energy Ltd.
License Number: 0122386
License Date: 1986-02-14
License Status: Amended
Spud Date: 1986-05-28
Final Drill Date: 1986-06-09
Well Total Depth: 1325.00 m
Surface Hole Latitude: 53.553342
Surface Hole Longitude: -113.746802

For data sources see[1][2]

Well History

Date Event
1986-02-14 Obtained License
1986-05-29 Surface Casing Operation Performed
1986-06-07 Drill Stem Test Performed
1986-06-08 Drill Stem Test Performed
1986-06-09 Finished Drilling
1986-06-09 Well Mode changed to Drilled and Cased
1986-06-10 Well Log Performed
1986-06-11 Production Casing Operation Performed
1986-06-11 Rig Released
1986-07-29 Perforation Treatment Performed - Jet Perforation
1986-08-01 Perforation Treatment Performed - Fractured
1986-08-20 Well Began Production
1986-08-20 Well Fluid changed to Crude Oil
1986-08-20 Well Mode changed to Pumping
1998-07-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-06-25 Perforation Treatment Performed - Jet Perforation
2010-08-31 Perforation Treatment Performed - Chemical Squeeze
2011-01-16 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-07-29 Perforation 1233.10 1236.10 13
1986-08-01 Fracture 1233.10 1236.10 0
1998-07-11 Acid Treatment 1233.10 1236.10 0
2007-06-25 Perforation 1222.00 1224.50 20
2007-06-25 Perforation 1230.00 1231.00 20
2007-06-25 Perforation 1233.10 1236.10 20
2010-08-31 Chemical Squeeze 1222.00 1236.10 0
2011-01-16 Acid Treatment 1222.00 1236.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 2174 0.0 0.0 0.0
1987 3410 0.0 0.0 0.0
1988 7169 0.0 0.0 0.0
1989 8414 0.0 0.0 0.0
1990 8586 0.0 0.0 0.0
1991 8433 0.0 0.0 0.0
1992 8644 0.0 0.0 0.0
1993 8040 0.0 0.0 0.0
1994 8727 0.0 0.0 0.0
1995 8572 0.0 0.0 0.0
1996 8747 0.0 0.0 0.0
1997 8378 0.0 0.0 0.0
1998 8679 0.0 0.0 0.0
1999 8526 0.0 0.0 0.0
2000 8305 0.0 0.0 0.0
2001 8671 0.0 0.0 0.0
2002 8636 0.0 0.0 0.0
2003 8027 0.0 0.0 0.0
2004 8735 0.0 0.0 0.0
2005 8753 0.0 0.0 0.0
2006 8519 0.0 0.0 0.0
2007 7042 0.0 0.0 0.0
2008 5278 0.0 0.0 0.0
2009 5095 0.0 0.0 0.0
2010 7735 0.0 0.0 0.0
2011 8497 0.0 0.0 0.0
2012 8774 0.0 0.0 0.0
2013 8755 0.0 0.0 0.0
2014 8732 0.0 0.0 0.0
2015 8546 0.0 0.0 0.0
2016 8760 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8726 0.0 0.0 0.0
2019 6056 0.0 0.0 0.0
2020 144 0.0 0.0 0.0

For data sources see[5]

References