X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0534261102004

Well Details

Well ID: 0534261102004
Loading map...
Location: 00/02-11-053-26W4/4
Location Alias: 00/02-11-53-26 W4M
Location Alias 2: 00/02-11-053-26 W4/04
Country: Canada
Province: Alberta
Township: 053
Meridian: 4
Range: 26
Section: 11
County/Municipality: Parkland County
Well Name: CEDAR CREEK STAL-BLK 2-11-53-26
Operator Name: MAGA Energy Operations Ltd.
License Number: 0003639
License Date: 1951-10-18
License Status: Issued
Spud Date: 1951-10-18
Final Drill Date: 1951-11-24
Well Total Depth: 1585.00 m
Surface Hole Latitude: 53.557545
Surface Hole Longitude: -113.723613

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-10-18 Obtained License
1951-11-12 Drill Stem Test Performed
1951-11-13 Drill Stem Test Performed
1951-11-19 Intermediate Casing Operation Performed
1951-11-24 Finished Drilling
1951-11-24 Perforation Treatment Performed - Open-Hole Completion
1951-11-24 Well Mode changed to Drilled and Cased
1982-09-02 Perforation Treatment Performed - Cement Plug
1982-09-02 Perforation Treatment Performed - Open-Hole Completion
1986-10-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-07-02 Perforation Treatment Performed - Open-Hole Completion
1987-07-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-07-18 Well Log Performed
1989-07-19 Well Log Performed
1989-07-22 Perforation Treatment Performed - Acid Wash - No Pressure
1990-11-20 Well Log Performed
1990-11-23 Perforation Treatment Performed - Open-Hole Completion
1990-11-23 Well Log Performed
1990-11-24 Liner Casing Operation Performed
1990-11-24 Perforation Treatment Performed - Cement Squeeze
1990-11-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-11-27 Perforation Treatment Performed - Jet Perforation
1990-11-27 Well Log Performed
1990-11-28 Well Log Performed
1991-12-17 Perforation Treatment Performed - Chemical Squeeze
1992-04-20 Perforation Treatment Performed - Chemical Squeeze
1992-11-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-11-12 Perforation Treatment Performed - Jet Perforation
1992-11-13 Well Log Performed
1993-02-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-09-08 Perforation Treatment Performed - Chemical Squeeze
1994-07-14 Perforation Treatment Performed - Chemical Squeeze
2004-01-20 Perforation Treatment Performed - Cement Plug
2004-01-20 Plug Back Performed
2004-01-20 Well Log Performed
2004-01-22 Well Log Performed
2004-01-23 Perforation Treatment Performed - Jet Perforation
2004-03-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-05-13 Well Log Performed
2009-05-14 Perforation Treatment Performed - Jet Perforation
2009-05-14 Well Log Performed
2009-05-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-05-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-06-12 Well Log Performed
2010-09-14 Perforation Treatment Performed - Jet Perforation
2010-09-14 Well Log Performed
2010-09-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-05-31 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-11-24 Open Hole/Barefoot Completion 1485.30 1545.90 0
1990-11-27 Perforation 1521.30 1522.00 20
1990-11-27 Perforation 1522.80 1523.50 20
1990-11-27 Perforation 1524.30 1525.00 20
1990-11-27 Perforation 1525.80 1526.50 20
1990-11-27 Perforation 1527.30 1528.00 20
1990-11-27 Perforation 1528.80 1529.50 20
1990-11-27 Perforation 1530.30 1531.00 20
1990-11-27 Acid Treatment 1521.30 1531.00 0
1991-12-17 Chemical Squeeze 1521.30 1531.00 0
1992-04-20 Chemical Squeeze 1521.30 1522.00 0
1982-09-02 Cement Plug 1522.90 1545.90 0
1992-11-12 Perforation 1532.00 1532.50 20
1992-11-12 Perforation 1534.20 1534.70 20
1992-11-12 Perforation 1536.40 1536.90 20
1992-11-12 Perforation 1538.60 1539.10 20
1992-11-12 Perforation 1540.80 1541.30 20
1992-11-12 Perforation 1543.00 1543.50 20
1992-11-12 Acid Treatment 1532.00 1543.50 0
1993-02-06 Acid Treatment 1532.00 1532.50 0
1993-09-08 Chemical Squeeze 1532.00 1543.50 0
1994-07-14 Chemical Squeeze 1532.00 1543.50 0
1982-09-02 Open Hole/Barefoot Completion 1485.30 1522.90 0
2004-01-20 Cement Plug 1506.80 1514.80 0
2004-01-23 Perforation 1390.50 1394.50 13
2004-03-12 Acid Treatment 1390.00 1394.50 0
2009-05-14 Perforation 1301.00 1310.00 20
2009-05-14 Perforation 1314.00 1320.00 20
2009-05-14 Perforation 1328.00 1331.00 20
2009-05-15 Acid Treatment 1314.00 1331.00 0
2009-05-19 Acid Treatment 1301.00 1310.00 0
2010-09-14 Perforation 1284.00 1291.00 20
2010-09-15 Acid Treatment 1284.00 1291.00 0
1986-10-22 Acid Treatment 1485.30 1522.90 0
2013-05-31 Acid Treatment 1284.00 1291.00 0
1987-07-02 Open Hole/Barefoot Completion 1485.30 1545.90 0
1987-07-04 Acid Treatment 1485.30 1545.90 0
1989-07-22 Acid Wash 1485.30 1545.90 0
1990-11-23 Open Hole/Barefoot Completion 1485.30 1585.00 0
1990-11-24 Cement Squeeze 1485.30 1585.00 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-06-04 No Incident Encountered 0.00 0.00

For data sources see[5]

References