X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0534261111000

Well Details

Well ID: 0534261111000
Loading map...
Location: 00/11-11-053-26W4/0
Location Alias: 00/11-11-53-26 W4M
Location Alias 2: 00/11-11-053-26 W4/00
Country: Canada
Province: Alberta
Township: 053
Meridian: 4
Range: 26
Section: 11
County/Municipality: Parkland County
Well Name: 1107882 ACC ACHESON 11-11-53-26
Operator Name: Obsidian Energy Ltd.
License Number: 0003254
License Date: 1951-07-26
License Status: Issued
Spud Date: 1951-07-30
Final Drill Date: 1951-10-01
Well Total Depth: 1576.00 m
Surface Hole Latitude: 53.564309
Surface Hole Longitude: -113.728859

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-07-26 Obtained License
1951-08-10 Drill Stem Test Performed
1951-08-12 Drill Stem Test Performed
1951-08-13 Drill Stem Test Performed
1951-08-14 Drill Stem Test Performed
1951-08-15 Drill Stem Test Performed
1951-08-16 Drill Stem Test Performed
1951-08-17 Drill Stem Test Performed
1951-08-18 Drill Stem Test Performed
1951-08-19 Drill Stem Test Performed
1951-08-20 Drill Stem Test Performed
1951-08-29 Drill Stem Test Performed
1951-08-31 Drill Stem Test Performed
1951-09-06 Production Casing Operation Performed
1951-09-09 Blowout Occurred
1951-10-01 Finished Drilling
1951-10-01 Perforation Treatment Performed - Open-Hole Completion
1951-10-01 Well Mode changed to Drilled and Cased
1951-10-03 Well Began Production
1951-10-03 Well Fluid changed to Crude Oil
1951-10-03 Well Mode changed to Flowing
1968-09-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1968-09-05 Well Fluid changed to Crude Oil
1968-09-05 Well Mode changed to Abandoned Zone
1969-10-31 Perforation Treatment Performed - Jet Perforation
1969-11-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-11-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1969-11-04 Perforation Treatment Performed - Jet Perforation
1970-02-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1970-02-09 Perforation Treatment Performed - Jet Perforation
1970-02-11 Perforation Treatment Performed - Acid Wash - No Pressure
1987-03-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-03-04 Perforation Treatment Performed - Cement Squeeze
1987-03-07 Perforation Treatment Performed - Jet Perforation
1987-03-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-03-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-03-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-03-13 Perforation Treatment Performed - Cement Squeeze
1987-03-13 Plug Back Performed
1987-03-27 Perforation Treatment Performed - Open-Hole Completion
1987-04-05 Well Log Performed
1987-04-06 Well Log Performed
1987-04-07 Well Log Performed
1987-04-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-07-13 Well Type changed to Observation
1987-10-19 Well Log Performed
1988-01-15 Well Log Performed
1988-07-11 Well Log Performed
1988-09-20 Well Log Performed
1989-01-06 Well Log Performed
1989-03-13 Perforation Treatment Performed - Jet Perforation
1989-03-13 Well Log Performed
1989-04-06 Well Fluid changed to Crude Oil
1989-04-06 Well Mode changed to Flowing
1991-04-24 Well Log Performed
1991-04-30 Well Log Performed
1991-05-02 Perforation Treatment Performed - Open-Hole Completion
1991-05-02 Well Log Performed
1991-05-03 Liner Casing Operation Performed
1991-05-03 Perforation Treatment Performed - Cement Squeeze
1991-05-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-05-05 Perforation Treatment Performed - Jet Perforation
1991-05-05 Well Log Performed
1991-05-06 Well Log Performed
1992-07-31 Perforation Treatment Performed - Chemical Squeeze
1992-11-21 Perforation Treatment Performed - Chemical Squeeze
1992-11-27 Well Fluid changed to Crude Oil
1992-11-27 Well Mode changed to Pumping
1993-05-31 Perforation Treatment Performed - Jet Perforation
1993-05-31 Well Log Performed
1993-06-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-06-05 Well Log Performed
1993-06-09 Well Log Performed
1993-10-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-02-04 Well Log Performed
2002-02-07 Well Log Performed
2004-09-29 Perforation Treatment Performed - Jet Perforation
2004-09-30 Perforation Treatment Performed - Jet Perforation
2004-09-30 Well Log Performed
2004-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-06-27 Well Fluid changed to Crude Oil
2007-06-27 Well Mode changed to Suspended
2009-02-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-02-05 Plug Back Performed
2009-02-05 Well Fluid changed to Crude Oil
2009-02-05 Well Mode changed to Abandoned Zone
2009-02-06 Perforation Treatment Performed - Jet Perforation
2009-02-06 Well Log Performed
2009-02-07 Perforation Treatment Performed - Jet Perforation
2009-04-30 Perforation Treatment Performed - Cement Squeeze
2009-04-30 Plug Back Performed
2009-04-30 Well Log Performed
2009-05-05 Well Log Performed
2009-05-06 Perforation Treatment Performed - Jet Perforation
2009-05-06 Well Log Performed
2009-05-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-02-18 Well Log Performed
2010-02-27 Perforation Treatment Performed - Fractured
2013-06-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-06-20 Perforation Treatment Performed - Jet Perforation
2013-06-20 Well Log Performed
2013-06-21 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-10-01 Open Hole/Barefoot Completion 1474.60 1541.40 0
1970-02-11 Acid Wash 1180.80 1182.00 0
1987-03-04 Acid Treatment 1180.80 1182.00 0
1987-03-04 Cement Squeeze 1180.80 1182.00 0
1987-03-07 Perforation 1222.60 1223.20 7
1987-03-07 Perforation 1224.70 1225.70 7
1987-03-07 Perforation 1231.40 1232.90 7
1987-03-09 Acid Treatment 1222.60 1232.90 0
1987-03-12 Acid Treatment 1222.60 1232.90 0
1987-03-13 Acid Treatment 1222.60 1232.90 0
1987-03-13 Cement Squeeze 1222.60 1232.90 0
1968-09-05 Packing Device Capped w/Cement 1439.60 1439.60 0
1987-03-27 Open Hole/Barefoot Completion 1474.60 1541.40 0
1987-04-09 Acid Treatment 1474.60 1541.40 0
1989-03-13 Perforation 1516.70 1518.70 13
1991-05-02 Open Hole/Barefoot Completion 1474.60 1576.00 0
1991-05-03 Cement Squeeze 1474.60 1576.00 0
1991-05-05 Perforation 1519.50 1520.20 20
1991-05-05 Perforation 1521.00 1521.70 20
1991-05-05 Perforation 1522.50 1523.20 20
1991-05-05 Perforation 1524.00 1524.70 20
1991-05-05 Perforation 1525.50 1526.20 20
1969-10-31 Perforation 1231.40 1232.90 7
1991-05-05 Perforation 1527.00 1527.70 20
1991-05-05 Perforation 1528.50 1529.20 20
1991-05-05 Acid Treatment 1519.50 1529.20 0
1992-07-31 Chemical Squeeze 1519.50 1529.20 0
1992-11-21 Chemical Squeeze 1519.50 1529.20 0
1993-05-31 Perforation 1530.20 1530.70 20
1993-05-31 Perforation 1532.40 1532.90 20
1993-05-31 Perforation 1534.60 1535.10 20
1993-05-31 Perforation 1536.80 1537.30 20
1993-05-31 Perforation 1539.00 1539.50 20
1969-11-02 Acid Treatment 1231.40 1232.90 0
1993-05-31 Perforation 1541.20 1541.70 20
1993-06-01 Acid Treatment 1530.20 1541.70 0
1993-10-08 Acid Treatment 1519.50 1541.70 0
2004-09-29 Perforation 1507.50 1508.20 17
2004-09-29 Perforation 1508.70 1509.40 17
2004-09-29 Perforation 1509.90 1510.60 17
2004-09-29 Perforation 1511.10 1511.80 17
2004-09-29 Perforation 1512.30 1513.00 17
2004-09-29 Perforation 1513.50 1514.20 17
2004-09-29 Perforation 1514.70 1515.40 17
1969-11-04 Perforation 1222.60 1223.20 7
2004-09-29 Perforation 1515.90 1516.60 17
2004-09-29 Perforation 1517.10 1517.80 17
2004-09-29 Perforation 1518.30 1519.00 17
2004-09-30 Perforation 1485.00 1486.60 17
2004-09-30 Perforation 1487.10 1487.80 17
2004-09-30 Perforation 1488.30 1489.00 17
2004-09-30 Perforation 1489.50 1490.20 17
2004-09-30 Perforation 1490.70 1491.40 17
2004-09-30 Perforation 1493.10 1493.80 17
2004-09-30 Perforation 1494.30 1495.00 17
1969-11-04 Perforation 1224.70 1225.90 7
2004-09-30 Perforation 1495.50 1496.20 17
2004-09-30 Perforation 1496.70 1497.40 17
2004-09-30 Perforation 1497.90 1498.60 17
2004-09-30 Perforation 1499.10 1499.80 17
2004-09-30 Perforation 1500.30 1501.00 17
2004-09-30 Perforation 1501.50 1502.20 17
2004-09-30 Perforation 1502.70 1503.40 17
2004-09-30 Perforation 1503.90 1504.60 17
2004-09-30 Perforation 1505.10 1505.80 17
2004-09-30 Perforation 1506.30 1507.00 17
1969-11-04 Packing Device Capped w/Cement 1230.20 1230.20 0
2004-10-04 Acid Treatment 1485.00 1519.00 0
2009-02-05 Packing Device Capped w/Cement 1469.50 1477.50 0
2009-02-06 Perforation 1193.40 1193.70 10
2009-02-06 Perforation 1190.90 1191.20 10
2009-02-07 Perforation 1189.50 1189.70 5
2009-02-07 Perforation 1191.50 1191.70 5
2009-04-30 Cement Squeeze 1189.50 1193.70 0
2009-05-06 Perforation 1287.50 1294.00 20
2009-05-06 Perforation 1296.00 1302.50 20
2009-05-06 Perforation 1319.50 1328.50 20
1970-02-07 Packing Device Capped w/Cement 1206.70 1206.70 0
2009-05-06 Perforation 1332.00 1338.50 20
2009-05-07 Acid Treatment 1287.50 1338.50 0
2010-02-27 Fracture 1287.50 1294.00 0
2013-06-15 Acid Treatment 1287.50 1338.50 0
2013-06-20 Perforation 1279.00 1284.00 20
2013-06-20 Perforation 1268.00 1274.00 20
2013-06-21 Acid Treatment 1268.00 1274.00 0
1970-02-09 Perforation 1180.80 1182.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 5504 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1989 6306 0.0 0.0 0.0
1990 8448 0.0 0.0 0.0
1991 7688 0.0 0.0 0.0
1992 7763 0.0 0.0 0.0
1993 7517 0.0 0.0 0.0
1994 8646 0.0 0.0 0.0
1995 8556 0.0 0.0 0.0
1996 6876 0.0 0.0 0.0
1997 3935 0.0 0.0 0.0
1998 2100 0.0 0.0 0.0
1999 1569 0.0 0.0 0.0
2000 6024 0.0 0.0 0.0
2001 6697 0.0 0.0 0.0
2002 6695 0.0 0.0 0.0
2003 8319 0.0 0.0 0.0
2004 7040 0.0 0.0 0.0
2005 8711 0.0 0.0 0.0
2006 1920 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1951-09-09 Blowout 1480.30 1480.30
1951-09-09 Blowout 1480.40 1480.40
2013-06-25 No Incident Encountered 0.00 0.00

For data sources see[6]

References