If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0534261111002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.564309,"lon":-113.728859,"icon":""}]} |
Location: 00/11-11-053-26W4/2 | |
Location Alias: 00/11-11-53-26 W4M | |
Location Alias 2: 00/11-11-053-26 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 053 | |
Meridian: 4 | |
Range: 26 | |
Section: 11 | |
County/Municipality: Parkland County | |
Well Name: 1107882 ACC ACHESON 11-11-53-26 | |
Operator Name: Obsidian Energy Ltd. | |
License Number: 0003254 | |
License Date: 1951-07-26 | |
License Status: Issued | |
Spud Date: 1951-07-30 | |
Final Drill Date: 1951-10-01 | |
Well Total Depth: 1576.00 m | |
Surface Hole Latitude: 53.564309 | |
Surface Hole Longitude: -113.728859 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1951-07-26 | Obtained License |
1951-08-10 | Drill Stem Test Performed |
1951-08-12 | Drill Stem Test Performed |
1951-08-13 | Drill Stem Test Performed |
1951-08-14 | Drill Stem Test Performed |
1951-08-15 | Drill Stem Test Performed |
1951-08-16 | Drill Stem Test Performed |
1951-08-17 | Drill Stem Test Performed |
1951-08-18 | Drill Stem Test Performed |
1951-08-19 | Drill Stem Test Performed |
1951-08-20 | Drill Stem Test Performed |
1951-08-29 | Drill Stem Test Performed |
1951-08-31 | Drill Stem Test Performed |
1951-09-06 | Production Casing Operation Performed |
1951-09-09 | Blowout Occurred |
1951-10-01 | Finished Drilling |
1951-10-01 | Perforation Treatment Performed - Open-Hole Completion |
1968-09-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1969-10-31 | Perforation Treatment Performed - Jet Perforation |
1969-11-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1969-11-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1969-11-04 | Perforation Treatment Performed - Jet Perforation |
1970-02-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1970-02-09 | Perforation Treatment Performed - Jet Perforation |
1970-02-11 | Perforation Treatment Performed - Acid Wash - No Pressure |
1970-07-18 | Well Mode changed to Drilled and Cased |
1979-08-13 | Well Began Production |
1979-08-13 | Well Fluid changed to Gas |
1979-08-13 | Well Mode changed to Flowing |
1987-03-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-03-04 | Perforation Treatment Performed - Cement Squeeze |
1987-03-07 | Perforation Treatment Performed - Jet Perforation |
1987-03-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-03-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-03-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-03-13 | Perforation Treatment Performed - Cement Squeeze |
1987-03-13 | Plug Back Performed |
1987-03-13 | Well Fluid changed to Gas |
1987-03-13 | Well Mode changed to Abandoned Zone |
1987-03-27 | Perforation Treatment Performed - Open-Hole Completion |
1987-04-05 | Well Log Performed |
1987-04-06 | Well Log Performed |
1987-04-07 | Well Log Performed |
1987-04-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-10-19 | Well Log Performed |
1988-01-15 | Well Log Performed |
1988-07-11 | Well Log Performed |
1988-09-20 | Well Log Performed |
1989-01-06 | Well Log Performed |
1989-03-13 | Perforation Treatment Performed - Jet Perforation |
1989-03-13 | Well Log Performed |
1991-04-24 | Well Log Performed |
1991-04-30 | Well Log Performed |
1991-05-02 | Perforation Treatment Performed - Open-Hole Completion |
1991-05-02 | Well Log Performed |
1991-05-03 | Liner Casing Operation Performed |
1991-05-03 | Perforation Treatment Performed - Cement Squeeze |
1991-05-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1991-05-05 | Perforation Treatment Performed - Jet Perforation |
1991-05-05 | Well Log Performed |
1991-05-06 | Well Log Performed |
1992-07-31 | Perforation Treatment Performed - Chemical Squeeze |
1992-11-21 | Perforation Treatment Performed - Chemical Squeeze |
1993-05-31 | Perforation Treatment Performed - Jet Perforation |
1993-05-31 | Well Log Performed |
1993-06-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-06-05 | Well Log Performed |
1993-06-09 | Well Log Performed |
1993-10-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2002-02-04 | Well Log Performed |
2002-02-07 | Well Log Performed |
2004-09-29 | Perforation Treatment Performed - Jet Perforation |
2004-09-30 | Perforation Treatment Performed - Jet Perforation |
2004-09-30 | Well Log Performed |
2004-10-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2009-02-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-02-05 | Plug Back Performed |
2009-02-06 | Perforation Treatment Performed - Jet Perforation |
2009-02-06 | Well Log Performed |
2009-02-07 | Perforation Treatment Performed - Jet Perforation |
2009-04-30 | Perforation Treatment Performed - Cement Squeeze |
2009-04-30 | Plug Back Performed |
2009-04-30 | Well Log Performed |
2009-05-05 | Well Log Performed |
2009-05-06 | Perforation Treatment Performed - Jet Perforation |
2009-05-06 | Well Log Performed |
2009-05-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2010-02-18 | Well Log Performed |
2010-02-27 | Perforation Treatment Performed - Fractured |
2013-06-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2013-06-20 | Perforation Treatment Performed - Jet Perforation |
2013-06-20 | Well Log Performed |
2013-06-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1951-10-01 | Open Hole/Barefoot Completion | 1474.60 | 1541.40 | 0 |
1970-02-11 | Acid Wash | 1180.80 | 1182.00 | 0 |
1987-03-04 | Acid Treatment | 1180.80 | 1182.00 | 0 |
1987-03-04 | Cement Squeeze | 1180.80 | 1182.00 | 0 |
1987-03-07 | Perforation | 1222.60 | 1223.20 | 7 |
1987-03-07 | Perforation | 1224.70 | 1225.70 | 7 |
1987-03-07 | Perforation | 1231.40 | 1232.90 | 7 |
1987-03-09 | Acid Treatment | 1222.60 | 1232.90 | 0 |
1987-03-12 | Acid Treatment | 1222.60 | 1232.90 | 0 |
1987-03-13 | Acid Treatment | 1222.60 | 1232.90 | 0 |
1987-03-13 | Cement Squeeze | 1222.60 | 1232.90 | 0 |
1968-09-05 | Packing Device Capped w/Cement | 1439.60 | 1439.60 | 0 |
1987-03-27 | Open Hole/Barefoot Completion | 1474.60 | 1541.40 | 0 |
1987-04-09 | Acid Treatment | 1474.60 | 1541.40 | 0 |
1989-03-13 | Perforation | 1516.70 | 1518.70 | 13 |
1991-05-02 | Open Hole/Barefoot Completion | 1474.60 | 1576.00 | 0 |
1991-05-03 | Cement Squeeze | 1474.60 | 1576.00 | 0 |
1991-05-05 | Perforation | 1519.50 | 1520.20 | 20 |
1991-05-05 | Perforation | 1521.00 | 1521.70 | 20 |
1991-05-05 | Perforation | 1522.50 | 1523.20 | 20 |
1991-05-05 | Perforation | 1524.00 | 1524.70 | 20 |
1991-05-05 | Perforation | 1525.50 | 1526.20 | 20 |
1969-10-31 | Perforation | 1231.40 | 1232.90 | 7 |
1991-05-05 | Perforation | 1527.00 | 1527.70 | 20 |
1991-05-05 | Perforation | 1528.50 | 1529.20 | 20 |
1991-05-05 | Acid Treatment | 1519.50 | 1529.20 | 0 |
1992-07-31 | Chemical Squeeze | 1519.50 | 1529.20 | 0 |
1992-11-21 | Chemical Squeeze | 1519.50 | 1529.20 | 0 |
1993-05-31 | Perforation | 1530.20 | 1530.70 | 20 |
1993-05-31 | Perforation | 1532.40 | 1532.90 | 20 |
1993-05-31 | Perforation | 1534.60 | 1535.10 | 20 |
1993-05-31 | Perforation | 1536.80 | 1537.30 | 20 |
1993-05-31 | Perforation | 1539.00 | 1539.50 | 20 |
1969-11-02 | Acid Treatment | 1231.40 | 1232.90 | 0 |
1993-05-31 | Perforation | 1541.20 | 1541.70 | 20 |
1993-06-01 | Acid Treatment | 1530.20 | 1541.70 | 0 |
1993-10-08 | Acid Treatment | 1519.50 | 1541.70 | 0 |
2004-09-29 | Perforation | 1507.50 | 1508.20 | 17 |
2004-09-29 | Perforation | 1508.70 | 1509.40 | 17 |
2004-09-29 | Perforation | 1509.90 | 1510.60 | 17 |
2004-09-29 | Perforation | 1511.10 | 1511.80 | 17 |
2004-09-29 | Perforation | 1512.30 | 1513.00 | 17 |
2004-09-29 | Perforation | 1513.50 | 1514.20 | 17 |
2004-09-29 | Perforation | 1514.70 | 1515.40 | 17 |
1969-11-04 | Perforation | 1222.60 | 1223.20 | 7 |
2004-09-29 | Perforation | 1515.90 | 1516.60 | 17 |
2004-09-29 | Perforation | 1517.10 | 1517.80 | 17 |
2004-09-29 | Perforation | 1518.30 | 1519.00 | 17 |
2004-09-30 | Perforation | 1485.00 | 1486.60 | 17 |
2004-09-30 | Perforation | 1487.10 | 1487.80 | 17 |
2004-09-30 | Perforation | 1488.30 | 1489.00 | 17 |
2004-09-30 | Perforation | 1489.50 | 1490.20 | 17 |
2004-09-30 | Perforation | 1490.70 | 1491.40 | 17 |
2004-09-30 | Perforation | 1493.10 | 1493.80 | 17 |
2004-09-30 | Perforation | 1494.30 | 1495.00 | 17 |
1969-11-04 | Perforation | 1224.70 | 1225.90 | 7 |
2004-09-30 | Perforation | 1495.50 | 1496.20 | 17 |
2004-09-30 | Perforation | 1496.70 | 1497.40 | 17 |
2004-09-30 | Perforation | 1497.90 | 1498.60 | 17 |
2004-09-30 | Perforation | 1499.10 | 1499.80 | 17 |
2004-09-30 | Perforation | 1500.30 | 1501.00 | 17 |
2004-09-30 | Perforation | 1501.50 | 1502.20 | 17 |
2004-09-30 | Perforation | 1502.70 | 1503.40 | 17 |
2004-09-30 | Perforation | 1503.90 | 1504.60 | 17 |
2004-09-30 | Perforation | 1505.10 | 1505.80 | 17 |
2004-09-30 | Perforation | 1506.30 | 1507.00 | 17 |
1969-11-04 | Packing Device Capped w/Cement | 1230.20 | 1230.20 | 0 |
2004-10-04 | Acid Treatment | 1485.00 | 1519.00 | 0 |
2009-02-05 | Packing Device Capped w/Cement | 1469.50 | 1477.50 | 0 |
2009-02-06 | Perforation | 1193.40 | 1193.70 | 10 |
2009-02-06 | Perforation | 1190.90 | 1191.20 | 10 |
2009-02-07 | Perforation | 1189.50 | 1189.70 | 5 |
2009-02-07 | Perforation | 1191.50 | 1191.70 | 5 |
2009-04-30 | Cement Squeeze | 1189.50 | 1193.70 | 0 |
2009-05-06 | Perforation | 1287.50 | 1294.00 | 20 |
2009-05-06 | Perforation | 1296.00 | 1302.50 | 20 |
2009-05-06 | Perforation | 1319.50 | 1328.50 | 20 |
1970-02-07 | Packing Device Capped w/Cement | 1206.70 | 1206.70 | 0 |
2009-05-06 | Perforation | 1332.00 | 1338.50 | 20 |
2009-05-07 | Acid Treatment | 1287.50 | 1338.50 | 0 |
2010-02-27 | Fracture | 1287.50 | 1294.00 | 0 |
2013-06-15 | Acid Treatment | 1287.50 | 1338.50 | 0 |
2013-06-20 | Perforation | 1279.00 | 1284.00 | 20 |
2013-06-20 | Perforation | 1268.00 | 1274.00 | 20 |
2013-06-21 | Acid Treatment | 1268.00 | 1274.00 | 0 |
1970-02-09 | Perforation | 1180.80 | 1182.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1979 | 607 | 0.0 | 0.0 | 0.0 |
1980 | 884 | 0.0 | 0.0 | 0.0 |
1981 | 577 | 0.0 | 0.0 | 0.0 |
1982 | 691 | 0.0 | 0.0 | 0.0 |
1983 | 893 | 0.0 | 0.0 | 0.0 |
1984 | 991 | 0.0 | 0.0 | 0.0 |
1985 | 284 | 0.0 | 0.0 | 0.0 |
1986 | 1061 | 0.0 | 0.0 | 0.0 |
1987 | 24 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1951-09-09 | Blowout | 1480.30 | 1480.30 |
1951-09-09 | Blowout | 1480.40 | 1480.40 |
2013-06-25 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]