X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0534261402000

Well Details

Well ID: 0534261402000
Loading map...
Location: 00/02-14-053-26W4/0
Location Alias: 00/02-14-53-26 W4M
Location Alias 2: 00/02-14-053-26 W4/00
Country: Canada
Province: Alberta
Township: 053
Meridian: 4
Range: 26
Section: 14
County/Municipality: Parkland County
Well Name: CEDAR CREEK STAL-BLK 2-14-53-26
Operator Name: MAGA Energy Operations Ltd.
License Number: 0004630
License Date: 1952-05-09
License Status: Suspension
Spud Date: 1952-05-12
Final Drill Date: 1952-05-31
Well Total Depth: 1570.00 m
Surface Hole Latitude: 53.571609
Surface Hole Longitude: -113.722883

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-05-09 Obtained License
1952-05-31 Finished Drilling
1952-05-31 Well Mode changed to Drilled and Cased
1952-06-03 Production Casing Operation Performed
1952-06-08 Perforation Treatment Performed - Open-Hole Completion
1952-06-10 Well Began Production
1952-06-10 Well Fluid changed to Crude Oil
1952-06-10 Well Mode changed to Flowing
1966-02-01 Well Fluid changed to Crude Oil
1966-02-01 Well Mode changed to Suspended
1984-07-05 Well Fluid changed to Crude Oil
1984-07-05 Well Mode changed to Flowing
1986-04-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-02-09 Well Log Performed
1990-10-22 Perforation Treatment Performed - Open-Hole Completion
1990-10-23 Well Log Performed
1990-10-31 Liner Casing Operation Performed
1990-10-31 Perforation Treatment Performed - Cement Squeeze
1990-11-02 Well Log Performed
1990-11-03 Perforation Treatment Performed - Acid Wash - No Pressure
1990-11-03 Perforation Treatment Performed - Jet Perforation
1990-11-03 Well Log Performed
1991-02-12 Well Fluid changed to Crude Oil
1991-02-12 Well Mode changed to Pumping
1997-05-13 Well Log Performed
2003-02-07 Perforation Treatment Performed - Cement Plug
2003-02-11 Well Fluid changed to Crude Oil
2003-02-11 Well Log Performed
2003-02-11 Well Mode changed to Suspended
2003-02-14 Perforation Treatment Performed - Jet Perforation
2003-02-19 Perforation Treatment Performed - Cement Squeeze
2003-02-19 Well Log Performed
2003-02-26 Perforation Treatment Performed - Jet Perforation
2003-02-26 Well Log Performed
2006-12-18 Perforation Treatment Performed - Jet Perforation
2010-03-19 Perforation Treatment Performed - Chemical Squeeze
2013-01-23 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-06-08 Open Hole/Barefoot Completion 1479.20 1538.00 0
1990-11-03 Perforation 1531.40 1532.10 20
1990-11-03 Perforation 1533.60 1534.30 20
1990-11-03 Acid Wash 1520.40 1534.30 0
2003-02-07 Cement Plug 1506.00 1512.20 0
2003-02-14 Perforation 1222.00 1222.30 79
2003-02-14 Perforation 1225.00 1225.30 79
2003-02-19 Cement Squeeze 1222.00 1222.30 0
2003-02-19 Cement Squeeze 1225.00 1225.30 0
2003-02-26 Perforation 1219.50 1222.50 16
2006-12-18 Perforation 1215.00 1217.00 17
1986-04-28 Acid Treatment 1479.20 1506.50 0
2006-12-18 Perforation 1219.50 1222.50 17
2010-03-19 Chemical Squeeze 1215.00 1222.50 0
1990-10-22 Open Hole/Barefoot Completion 1538.00 1570.00 0
1990-10-31 Cement Squeeze 1479.20 1570.00 0
1990-11-03 Perforation 1520.40 1521.10 20
1990-11-03 Perforation 1522.60 1523.30 20
1990-11-03 Perforation 1524.80 1525.50 20
1990-11-03 Perforation 1527.00 1527.70 20
1990-11-03 Perforation 1529.20 1529.90 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1984 3906 0.0 0.0 0.0
1985 7844 0.0 0.0 0.0
1986 7036 0.0 0.0 0.0
1987 7703 0.0 0.0 0.0
1988 8013 0.0 0.0 0.0
1989 212 0.0 0.0 0.0
1990 1006 0.0 0.0 0.0
1991 8340 0.0 0.0 0.0
1992 8184 0.0 0.0 0.0
1993 7249 0.0 0.0 0.0
1994 8650 0.0 0.0 0.0
1995 8425 0.0 0.0 0.0
1996 8673 0.0 0.0 0.0
1997 5650 0.0 0.0 0.0
1998 6968 0.0 0.0 0.0
1999 2518 0.0 0.0 0.0
2000 2550 0.0 0.0 0.0
2001 4976 0.0 0.0 0.0
2002 4099 0.0 0.0 0.0
2003 686 0.0 0.0 0.0

For data sources see[5]

References