X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0534262512003

Well Details

Well ID: 0534262512003
Loading map...
Location: 00/12-25-053-26W4/3
Location Alias: 00/12-25-53-26 W4M
Location Alias 2: 00/12-25-053-26 W4/03
Country: Canada
Province: Alberta
Township: 053
Meridian: 4
Range: 26
Section: 25
County/Municipality: Sturgeon County
Well Name: DAYLIGHT STAL-BLK 12-25-53-26
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0012545
License Date: 1956-10-29
License Status: Suspension
Spud Date: 1956-11-05
Final Drill Date: 1956-12-21
Well Total Depth: 1443.50 m
Surface Hole Latitude: 53.608315
Surface Hole Longitude: -113.710473

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1956-10-29 Obtained License
1956-11-15 Drill Stem Test Performed
1956-11-17 Drill Stem Test Performed
1956-11-22 Drill Stem Test Performed
1956-11-26 Drill Stem Test Performed
1956-11-27 Drill Stem Test Performed
1956-11-28 Lost Circulation Occurred
1956-12-11 Liner Casing Operation Performed
1956-12-21 Finished Drilling
1956-12-21 Well Mode changed to Drilled and Cased
1956-12-26 Lost Circulation Occurred
1956-12-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-12-28 Perforation Treatment Performed - Jet Perforation
1962-01-15 Perforation Treatment Performed - Jet Perforation
1962-01-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-01-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-06-20 Perforation Treatment Performed - Cement Squeeze
1962-06-23 Perforation Treatment Performed - Jet Perforation
1962-06-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-08-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-06-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-08-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-08-11 Perforation Treatment Performed - Cement Squeeze
1979-08-14 Perforation Treatment Performed - Cement Squeeze
1979-08-30 Perforation Treatment Performed - Cement Squeeze
1979-09-04 Perforation Treatment Performed - Jet Perforation
1979-09-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-09-10 Well Log Performed
1998-09-11 Perforation Treatment Performed - Jet Perforation
1998-09-11 Well Log Performed
1998-09-13 Perforation Treatment Performed - Fractured
1998-09-16 Perforation Treatment Performed - Jet Perforation
1998-09-16 Well Log Performed
1998-09-17 Perforation Treatment Performed - Fractured
1998-09-25 Perforation Treatment Performed - Cement Squeeze
1999-05-05 Well Began Production
1999-05-05 Well Fluid changed to Gas
1999-05-05 Well Mode changed to Flowing
2002-08-28 Perforation Treatment Performed - Cement Squeeze
2002-08-28 Plug Back Performed
2002-08-28 Well Fluid changed to Gas
2002-08-28 Well Mode changed to Abandoned Zone
2002-08-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-08-30 Plug Back Performed
2002-09-06 Well Fluid changed to Gas
2002-09-06 Well Mode changed to Abandoned and Whipstocked
2003-10-28 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1956-12-28 Perforation 1440.80 1442.30 16
1962-06-20 Cement Squeeze 1252.40 1257.00 0
1962-06-23 Perforation 1254.30 1257.00 3
1962-06-23 Perforation 1258.20 1259.40 3
1962-06-23 Perforation 1262.80 1263.40 3
1962-06-23 Perforation 1265.20 1266.70 3
1962-06-23 Perforation 1267.40 1269.80 3
1962-06-25 Acid Treatment 1254.30 1269.80 0
1964-08-28 Acid Treatment 1254.30 1269.80 0
1965-06-02 Acid Treatment 1254.30 1269.80 0
1979-08-11 Acid Treatment 1254.30 1270.70 0
1956-12-28 Acid Treatment 1440.80 1442.30 0
1979-08-11 Cement Squeeze 1254.30 1270.70 0
1979-08-14 Cement Squeeze 1254.30 1270.70 0
1979-08-30 Cement Squeeze 1440.80 1442.30 0
1979-09-04 Perforation 1437.00 1438.00 6
1979-09-05 Acid Treatment 1437.00 1438.00 0
1998-09-11 Perforation 1053.50 1059.00 14
1998-09-13 Fracture 1053.50 1059.00 0
1998-09-16 Perforation 1033.00 1037.50 14
1998-09-17 Fracture 1033.00 1037.50 0
1998-09-25 Cement Squeeze 1033.00 1037.50 0
1962-01-15 Perforation 1252.40 1257.00 3
2002-08-28 Cement Squeeze 1053.50 1059.00 0
2002-08-30 Packing Device Capped w/Cement 1397.00 1405.00 0
1962-01-15 Perforation 1258.20 1259.40 3
1962-01-15 Perforation 1262.80 1263.40 3
1962-01-15 Perforation 1265.20 1266.70 3
1962-01-15 Perforation 1267.40 1270.70 3
1962-01-20 Acid Treatment 1252.40 1270.70 0
1962-01-30 Acid Treatment 1252.40 1270.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 4255 0.0 0.0 0.0
2000 3997 0.0 0.0 0.0
2001 6460 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1956-11-28 Lost Circulation 1332.00 1332.00
1956-12-26 Lost Circulation 1425.50 1441.10

For data sources see[6]

References