X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0535110510000

Well Details

Well ID: 0535110510000
Loading map...
Location: 00/10-05-053-11W5/0
Location Alias: 00/10-05-53-11 W5M
Location Alias 2: 00/10-05-053-11 W5/00
Country: Canada
Province: Alberta
Township: 053
Meridian: 5
Range: 11
Section: 05
County/Municipality: Yellowhead County
Well Name: VEI CARROT 10-5-53-11
Operator Name: Vermilion Energy Inc.
License Number: 0035558
License Date: 1969-01-03
License Status: Issued
Spud Date: 1969-01-07
Final Drill Date: 1969-01-27
Well Total Depth: 2065.00 m
Surface Hole Latitude: 53.550691
Surface Hole Longitude: -115.582473

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-01-03 Obtained License
1969-01-23 Drill Stem Test Performed
1969-01-24 Drill Stem Test Performed
1969-01-26 Drill Stem Test Performed
1969-01-27 Finished Drilling
1969-01-29 Production Casing Operation Performed
1969-02-06 Perforation Treatment Performed - Jet Perforation
1969-02-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-03-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-03-13 Perforation Treatment Performed - Jet Perforation
1969-05-16 Well Mode changed to Drilled and Cased
1982-01-01 Perforation Treatment Performed - Fractured
1988-02-24 Well Began Production
1988-02-24 Well Fluid changed to Gas
1988-02-24 Well Mode changed to Flowing
2002-09-01 Well Fluid changed to Gas
2002-09-01 Well Mode changed to Suspended
2006-05-01 Well Fluid changed to Gas
2006-05-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-02-06 Perforation 2031.20 2033.00 7
1969-02-06 Perforation 2034.80 2036.10 7
1969-02-10 Acid Treatment 2031.20 2033.00 0
1969-02-10 Acid Treatment 2034.80 2036.10 0
1969-03-13 Perforation 2021.70 2024.80 7
1969-03-13 Acid Treatment 2021.70 2024.80 0
1982-01-01 Fracture 2021.70 2036.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 6590 0.0 0.0 0.0
1989 831 0.0 0.0 0.0
1990 5496 0.0 0.0 0.0
1993 1905 0.0 0.0 0.0
1994 2202 0.0 0.0 0.0
1995 266 0.0 0.0 0.0
1996 1399 0.0 0.0 0.0
1997 907 0.0 0.0 0.0
1998 2261 0.0 0.0 0.0
1999 2338 0.0 0.0 0.0
2000 8162 0.0 0.0 0.0
2001 8418 0.0 0.0 0.0
2002 5168 0.0 0.0 0.0
2006 4795 0.0 0.0 0.0
2007 8669 0.0 0.0 0.0
2008 8740 0.0 0.0 0.0
2009 8569 0.0 0.0 0.0
2010 8352 0.0 0.0 0.0
2011 8488 0.0 0.0 0.0
2012 8228 0.0 0.0 0.0
2013 8423 0.0 0.0 0.0
2014 8720 0.0 0.0 0.0
2015 7599 0.0 0.0 0.0
2016 8364 0.0 0.0 0.0
2017 7637 0.0 0.0 0.0
2018 8313 0.0 0.0 0.0
2019 5807 0.0 0.0 0.0
2020 699 0.0 0.0 0.0

For data sources see[5]

References