X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0535133215003

Well Details

Well ID: 0535133215003
Loading map...
Location: 00/15-32-053-13W5/3
Location Alias: 00/15-32-53-13 W5M
Location Alias 2: 00/15-32-053-13 W5/03
Country: Canada
Province: Alberta
Township: 053
Meridian: 5
Range: 13
Section: 32
County/Municipality: Yellowhead County
Well Name: VEI CARROT 15-32-53-13
Operator Name: Vermilion Energy Inc.
License Number: 0260394
License Date: 2001-10-09
License Status: Amended
Spud Date: 2001-10-16
Final Drill Date: 2001-10-24
Well Total Depth: 2145.00 m
Surface Hole Latitude: 53.625175
Surface Hole Longitude: -115.880255

For data sources see[1][2]

Well History

Date Event
2001-10-09 Obtained License
2001-10-14 Well Log Performed
2001-10-16 Surface Casing Operation Performed
2001-10-24 Finished Drilling
2001-10-24 Well Mode changed to Drilled and Cased
2001-10-25 Well Log Performed
2001-10-26 Production Casing Operation Performed
2001-10-27 Rig Released
2002-01-18 Perforation Treatment Performed - Jet Perforation
2002-01-18 Well Log Performed
2002-01-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-01-22 Plug Back Performed
2002-01-22 Well Log Performed
2002-01-23 Perforation Treatment Performed - Jet Perforation
2002-01-23 Well Log Performed
2002-01-26 Perforation Treatment Performed - Fractured
2002-01-29 Well Log Performed
2002-01-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-01-30 Plug Back Performed
2002-01-31 Perforation Treatment Performed - Jet Perforation
2002-01-31 Well Log Performed
2002-02-03 Perforation Treatment Performed - Fractured
2002-03-12 Well Began Production
2002-03-12 Well Fluid changed to Gas
2002-03-12 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-01-18 Perforation 2104.00 2108.00 17
2002-01-18 Perforation 2095.00 2099.00 17
2002-01-22 Packing Device Capped w/Cement 2084.00 2092.00 0
2002-01-23 Perforation 2066.60 2068.80 17
2002-01-23 Perforation 2064.00 2066.00 17
2002-01-26 Fracture 2064.50 2068.80 0
2002-01-30 Packing Device Capped w/Cement 2054.00 2062.00 0
2002-01-31 Perforation 1853.40 1856.00 17
2002-02-03 Fracture 1853.40 1856.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 7041 0.0 0.0 0.0
2003 8509 0.0 0.0 0.0
2004 8761 0.0 0.0 0.0
2005 8409 0.0 0.0 0.0
2006 8715 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8711 0.0 0.0 0.0
2010 8615 0.0 0.0 0.0
2011 8640 0.0 0.0 0.0
2012 8662 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8663 0.0 0.0 0.0
2015 4248 0.0 0.0 0.0
2016 7392 0.0 0.0 0.0
2017 8127 0.0 0.0 0.0
2018 8297 0.0 0.0 0.0
2019 3305 0.0 0.0 0.0
2020 2023 0.0 0.0 0.0

For data sources see[5]

References