X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0544120210000

Well Details

Well ID: 0544120210000
Loading map...
Location: 00/10-02-054-12W4/0
Location Alias: 00/10-02-54-12 W4M
Location Alias 2: 00/10-02-054-12 W4/00
Country: Canada
Province: Alberta
Township: 054
Meridian: 4
Range: 12
Section: 02
County/Municipality: County of Two Hills No. 21
Well Name: DORSET PLAIN 10-2-54-12
Operator Name: Baytex Energy Ltd.
License Number: 0064504
License Date: 1977-06-27
License Status: RecCertified
Spud Date: 1977-08-13
Final Drill Date: 1977-08-15
Well Total Depth: 799.80 m
Surface Hole Latitude: 53.637385
Surface Hole Longitude: -111.654855

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-06-27 Obtained License
1977-08-15 Finished Drilling
1977-08-17 Production Casing Operation Performed
1977-09-04 Perforation Treatment Performed - Jet Perforation
1977-09-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-09-05 Perforation Treatment Performed - Cement Squeeze
1977-09-05 Perforation Treatment Performed - Jet Perforation
1977-09-05 Well Mode changed to Drilled and Cased
1978-07-01 Well Began Production
1978-07-01 Well Fluid changed to Gas
1978-07-01 Well Mode changed to Flowing
1979-10-15 Well Fluid changed to Gas
1979-10-15 Well Mode changed to Suspended
1991-09-01 Well Fluid changed to Gas
1991-09-01 Well Mode changed to Flowing
1994-12-31 Well Fluid changed to Gas
1994-12-31 Well Mode changed to Suspended
1997-11-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-11-09 Plug Back Performed
1997-11-09 Well Fluid changed to Gas
1997-11-09 Well Mode changed to Abandoned Zone
1997-11-12 Well Abandoned
1997-11-12 Well Fluid changed to Gas
1997-11-12 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-09-04 Perforation 596.80 598.00 13
1977-09-05 Acid Treatment 596.80 598.00 0
1977-09-05 Cement Squeeze 596.80 598.00 0
1977-09-05 Perforation 593.10 594.10 7
1997-11-09 Packing Device Capped w/Cement 574.50 582.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 3346 0.0 0.0 0.0
1979 1658 0.0 0.0 0.0
1991 1175 0.0 0.0 0.0
1994 880 0.0 0.0 0.0

For data sources see[5]

References