X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0544243001020

Well Details

Well ID: 0544243001020
Loading map...
Location: 02/01-30-054-24W4/0
Location Alias: 02/01-30-54-24 W4M
Location Alias 2: 02/01-30-054-24 W4/00
Country: Canada
Province: Alberta
Township: 054
Meridian: 4
Range: 24
Section: 30
County/Municipality: Sturgeon County
Well Name: DECALTA HAL CRO EAST CREST NO. 1-30A
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0009780
License Date: 1955-07-21
License Status: RecExempt
Spud Date: 1955-07-20
Final Drill Date: 1955-07-31
Well Total Depth: 1127.50 m
Surface Hole Latitude: 53.688920
Surface Hole Longitude: -113.520074

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1955-07-21 Obtained License
1955-07-31 Finished Drilling
1955-07-31 Well Mode changed to Drilled and Cased
1955-08-01 Perforation Treatment Performed - Open-Hole Completion
1955-08-01 Production Casing Operation Performed
1955-08-22 Well Began Production
1955-08-22 Well Fluid changed to Crude Oil
1955-08-22 Well Mode changed to Flowing
1955-11-10 Perforation Treatment Performed - Jet Perforation
1955-11-10 Perforation Treatment Performed - Resin-Gypsum Squeeze Or Plug
1955-11-12 Well Fluid changed to Crude Oil
1955-11-12 Well Mode changed to Pumping
1956-05-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1956-05-26 Perforation Treatment Performed - Jet Perforation
1959-05-28 Perforation Treatment Performed - Cement Squeeze
1959-05-31 Perforation Treatment Performed - Jet Perforation
1961-01-05 Well Fluid changed to Crude Oil
1961-01-05 Well Mode changed to Suspended
1963-08-03 Perforation Treatment Performed - Bullet Perforation
1963-08-03 Perforation Treatment Performed - Jet Perforation
1963-08-03 Perforation Treatment Performed - Resin-Gypsum Squeeze Or Plug
1963-09-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-10-16 Perforation Treatment Performed - Resin-Gypsum Squeeze Or Plug
1963-10-16 Well Fluid changed to Gas
1963-10-16 Well Mode changed to Flowing
1966-06-13 Perforation Treatment Performed - Cement Plug
1966-06-15 Well Abandoned
1966-06-15 Well Fluid changed to Gas
1966-06-15 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1955-08-01 Open Hole/Barefoot Completion 1126.80 1127.50 0
1963-08-03 Perforation 1117.10 1118.60 13
1963-09-13 Acid Treatment 1117.10 1118.60 0
1963-10-16 Resin-Gypsum Squeeze or Plug 1119.20 1120.10 0
1966-06-13 Cement Plug 1054.60 1119.20 0
1955-11-10 Resin-Gypsum Squeeze or Plug 1126.50 1127.50 0
1955-11-10 Perforation 1125.30 1126.20 13
1956-05-25 Packing Device Capped w/Cement 1124.70 1125.00 0
1956-05-26 Perforation 1124.10 1124.70 26
1959-05-28 Cement Squeeze 1124.10 1124.70 0
1959-05-31 Perforation 1123.20 1123.80 13
1963-08-03 Resin-Gypsum Squeeze or Plug 1120.10 1124.70 0
1963-08-03 Bullet Perforation 1118.30 1118.60 10

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References