X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0544262405000

Well Details

Well ID: 0544262405000
Loading map...
Location: 00/05-24-054-26W4/0
Location Alias: 00/05-24-54-26 W4M
Location Alias 2: 00/05-24-054-26 W4/00
Country: Canada
Province: Alberta
Township: 054
Meridian: 4
Range: 26
Section: 24
County/Municipality: Sturgeon County
Well Name: IMPERIAL STURGEON NO. 2
Operator Name: Imperial Oil Limited
License Number: 0003338
License Date: 1951-08-16
License Status: RecExempt
Spud Date: 1951-09-20
Final Drill Date: 1951-11-06
Well Total Depth: 1706.90 m
Surface Hole Latitude: 53.677963
Surface Hole Longitude: -113.710212

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-08-16 Obtained License
1951-09-29 Drill Stem Test Performed
1951-10-01 Drill Stem Test Performed
1951-10-04 Drill Stem Test Performed
1951-10-06 Drill Stem Test Performed
1951-10-07 Drill Stem Test Performed
1951-10-09 Drill Stem Test Performed
1951-10-10 Drill Stem Test Performed
1951-10-14 Drill Stem Test Performed
1951-10-21 Drill Stem Test Performed
1951-11-04 Drill Stem Test Performed
1951-11-06 Finished Drilling
1951-11-09 Production Casing Operation Performed
1951-11-09 Well Mode changed to Drilled and Cased
1951-11-15 Perforation Treatment Performed - Bullet Perforation
1953-09-12 Well Began Production
1953-09-12 Well Fluid changed to Gas
1953-09-12 Well Mode changed to Flowing
1955-09-28 Well Fluid changed to Gas
1955-09-28 Well Mode changed to Suspended
1957-07-16 Perforation Treatment Performed - Cement Squeeze
1957-07-20 Perforation Treatment Performed - Bullet Perforation
1957-07-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-07-24 Perforation Treatment Performed - Cement Plug
1957-07-26 Well Abandoned
1957-07-26 Well Fluid changed to Gas
1957-07-26 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-11-15 Bullet Perforation 1161.30 1163.70 20
1957-07-16 Cement Squeeze 1161.30 1163.70 0
1957-07-20 Bullet Perforation 1162.20 1163.70 0
1957-07-22 Acid Treatment 1162.20 1163.70 0
1957-07-24 Cement Plug 1139.60 1197.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References