X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554241706000

Well Details

Well ID: 0554241706000
Loading map...
Location: 00/06-17-055-24W4/0
Location Alias: 00/06-17-55-24 W4M
Location Alias 2: 00/06-17-055-24 W4/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 24
Section: 17
County/Municipality: Sturgeon County
Well Name: SHARPLES CARBONDALE #6-17
Operator Name: Philips Triest Sharples
License Number: 0010219
License Date: 1955-09-21
License Status: RecCertified
Spud Date: 1955-10-03
Final Drill Date: 1955-11-01
Well Total Depth: 1578.90 m
Surface Hole Latitude: 53.751025
Surface Hole Longitude: -113.536701

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1955-09-21 Obtained License
1955-10-08 Drill Stem Test Performed
1955-10-10 Drill Stem Test Performed
1955-10-11 Drill Stem Test Performed
1955-10-12 Drill Stem Test Performed
1955-10-14 Drill Stem Test Performed
1955-10-15 Production Casing Operation Performed
1955-10-17 Drill Stem Test Performed
1955-10-22 Drill Stem Test Performed
1955-11-01 Drill Stem Test Performed
1955-11-01 Finished Drilling
1955-11-01 Well Mode changed to Drilled and Cased
1955-11-04 Perforation Treatment Performed - Jet Perforation
1955-11-05 Perforation Treatment Performed - Cement Squeeze
1955-11-05 Perforation Treatment Performed - Jet Perforation
1955-11-06 Perforation Treatment Performed - Cement Squeeze
1955-11-07 Perforation Treatment Performed - Jet Perforation
1955-11-10 Perforation Treatment Performed - Cement Squeeze
1955-11-15 Perforation Treatment Performed - Bullet Perforation
1955-11-18 Perforation Treatment Performed - Bullet Perforation
1955-11-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-12-25 Well Began Production
1955-12-25 Well Fluid changed to Crude Oil
1955-12-25 Well Mode changed to Pumping
1956-03-01 Perforation Treatment Performed - Cement Squeeze
1956-03-02 Perforation Treatment Performed - Selective Bullet Perforations
1956-03-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-03-04 Perforation Treatment Performed - Cement Squeeze
1956-03-04 Perforation Treatment Performed - Fractured
1956-03-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1956-03-12 Perforation Treatment Performed - Bullet Perforation
1957-08-27 Well Fluid changed to Crude Oil
1957-08-27 Well Mode changed to Suspended
1960-06-29 Well Fluid changed to Crude Oil
1960-06-29 Well Mode changed to Flowing
1962-11-16 Perforation Treatment Performed - Cement Squeeze
1962-11-26 Perforation Treatment Performed - Jet Perforation
1962-11-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-12-05 Perforation Treatment Performed - Cement Squeeze
1962-12-10 Perforation Treatment Performed - Bullet Perforation
1962-12-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-12-11 Perforation Treatment Performed - Fractured
1962-12-14 Well Fluid changed to Gas
1962-12-14 Well Mode changed to Flowing
1970-02-10 Perforation Treatment Performed - Cement Plug
1970-02-14 Well Abandoned
1970-02-14 Well Fluid changed to Gas
1970-02-14 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1955-11-04 Perforation 1088.40 1088.70 13
1956-03-01 Cement Squeeze 1086.60 1087.50 0
1956-03-02 Selective Bullet Perforations 1086.00 1086.00 0
1956-03-04 Acid Treatment 1086.00 1086.00 0
1956-03-04 Fracture 1086.00 1086.00 0
1956-03-04 Cement Squeeze 1086.60 1087.50 0
1956-03-10 Packing Device Capped w/Cement 1088.10 1088.10 0
1956-03-12 Bullet Perforation 1087.50 1087.80 20
1962-11-16 Cement Squeeze 1087.50 1087.80 0
1962-11-26 Perforation 1085.40 1086.00 26
1962-11-27 Acid Treatment 1085.40 1086.00 0
1955-11-05 Cement Squeeze 1088.40 1088.70 0
1962-12-05 Cement Squeeze 1085.40 1086.00 0
1962-12-10 Bullet Perforation 1074.10 1075.30 13
1962-12-10 Bullet Perforation 1075.60 1076.60 13
1962-12-10 Bullet Perforation 1079.00 1080.20 13
1962-12-11 Acid Treatment 1074.10 1080.20 0
1962-12-11 Fracture 1074.10 1080.20 0
1970-02-10 Cement Plug 1041.50 1081.10 0
1955-11-05 Perforation 1085.40 1085.70 13
1955-11-06 Cement Squeeze 1085.40 1085.70 0
1955-11-07 Perforation 1086.90 1087.50 26
1955-11-10 Cement Squeeze 1086.90 1087.50 0
1955-11-15 Bullet Perforation 1086.60 1087.20 20
1955-11-18 Bullet Perforation 1086.60 1087.20 13
1955-11-20 Acid Treatment 1086.60 1087.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1440 0.0 0.0 0.0
1969 7175 0.0 0.0 0.0

For data sources see[5]

References