X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554250503000

Well Details

Well ID: 0554250503000
Loading map...
Location: 00/03-05-055-25W4/0
Location Alias: 00/03-05-55-25 W4M
Location Alias 2: 00/03-05-055-25 W4/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 25
Section: 05
County/Municipality: Sturgeon County
Well Name: PHOENIX ET AL MORINVILLE 3-5-55-25
Operator Name: Richard J. Churchill Limited
License Number: 0087948
License Date: 1981-01-02
License Status: RecCertified
Spud Date: 1981-01-08
Final Drill Date: 1981-01-18
Well Total Depth: 1430.00 m
Surface Hole Latitude: 53.716796
Surface Hole Longitude: -113.683935

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-01-02 Obtained License
1981-01-18 Finished Drilling
1981-01-22 Drill Stem Test Performed
1981-01-23 Drill Stem Test Performed
1981-01-24 Production Casing Operation Performed
1981-02-11 Perforation Treatment Performed - Jet Perforation
1981-02-11 Well Mode changed to Drilled and Cased
1983-10-14 Well Began Production
1983-10-14 Well Fluid changed to Gas
1983-10-14 Well Mode changed to Flowing
1987-12-22 Perforation Treatment Performed - Fractured
1988-06-01 Well Fluid changed to Gas
1988-06-01 Well Mode changed to Suspended
1994-11-15 Well Fluid changed to Crude Oil
1994-11-15 Well Mode changed to Pumping
1996-08-21 Well Fluid changed to Crude Oil
1996-08-21 Well Mode changed to Suspended
1999-09-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-09-24 Plug Back Performed
1999-10-05 Well Abandoned
1999-10-05 Well Fluid changed to Crude Oil
1999-10-05 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-02-11 Perforation 1137.00 1144.00 6
1987-12-22 Fracture 1137.00 1144.00 0
1999-09-24 Packing Device Capped w/Cement 1115.00 1123.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 453 0.0 0.0 0.0
1984 7222 0.0 0.0 0.0
1985 8441 0.0 0.0 0.0
1986 7935 0.0 0.0 0.0
1987 6086 0.0 0.0 0.0
1988 1296 0.0 0.0 0.0
1994 864 0.0 0.0 0.0
1995 4570 0.0 0.0 0.0
1996 0 0.0 0.0 0.0

For data sources see[5]

References