X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0555043511000

Well Details

Well ID: 0555043511000
Loading map...
Location: 00/11-35-055-04W5/0
Location Alias: 00/11-35-55-04 W5M
Location Alias 2: 00/11-35-055-04 W5/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 5
Range: 04
Section: 35
County/Municipality: Lac Ste. Anne County
Well Name: DORSET GLENEVIS 11-35-55-4
Operator Name: Baytex Energy Ltd.
License Number: 0008986
License Date: 1954-01-07
License Status: Abandoned
Spud Date: 1955-01-24
Final Drill Date: 1955-02-11
Well Total Depth: 1339.30 m
Surface Hole Latitude: 53.796799
Surface Hole Longitude: -114.488276

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-01-07 Obtained License
1955-02-09 Drill Stem Test Performed
1955-02-11 Finished Drilling
1955-02-11 Well Mode changed to Drilled and Cased
1955-02-12 Liner Casing Operation Performed
1955-08-14 Perforation Treatment Performed - Bullet Perforation
1955-08-14 Perforation Treatment Performed - Jet Perforation
1955-08-16 Perforation Treatment Performed - Acid Wash - No Pressure
1955-09-21 Well Began Production
1955-09-21 Well Fluid changed to Crude Oil
1955-09-21 Well Mode changed to Flowing
1975-06-04 Well Fluid changed to Crude Oil
1975-06-04 Well Mode changed to Pumping
1986-04-02 Well Fluid changed to Crude Oil
1986-04-02 Well Mode changed to Suspended
1988-03-24 Perforation Treatment Performed - Cement Squeeze
1988-03-25 Perforation Treatment Performed - Cement Plug
1988-03-25 Plug Back Performed
1988-03-25 Well Abandoned
1988-03-25 Well Fluid changed to Crude Oil
1988-03-25 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1955-08-14 Bullet Perforation 1304.80 1307.90 13
1955-08-14 Perforation 1304.80 1307.90 13
1955-08-16 Acid Wash 1304.80 1307.90 0
1988-03-24 Cement Squeeze 1304.80 1307.90 0
1988-03-25 Cement Plug 1030.50 1030.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 4617 0.0 0.0 0.0
1968 6562 0.0 0.0 0.0
1969 8258 0.0 0.0 0.0
1970 7773 0.0 0.0 0.0
1971 8315 0.0 0.0 0.0
1972 7584 0.0 0.0 0.0
1973 8333 0.0 0.0 0.0
1974 8319 0.0 0.0 0.0
1975 5640 0.0 0.0 0.0
1976 5354 0.0 0.0 0.0
1977 7703 0.0 0.0 0.0
1978 7962 0.0 0.0 0.0
1979 7690 0.0 0.0 0.0
1980 7836 0.0 0.0 0.0
1981 7556 0.0 0.0 0.0
1982 7912 0.0 0.0 0.0
1983 5417 0.0 0.0 0.0
1984 4947 0.0 0.0 0.0
1985 7863 0.0 0.0 0.0
1986 2184 0.0 0.0 0.0

For data sources see[5]

References