X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564201814000

Well Details

Well ID: 0564201814000
Loading map...
Location: 00/14-18-056-20W4/0
Location Alias: 00/14-18-56-20 W4M
Location Alias 2: 00/14-18-056-20 W4/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 20
Section: 18
County/Municipality: Strathcona County
Well Name: ESSO REDWATER NO. F 3 WELL
Operator Name: Imperial Oil Resources Limited
License Number: 0002392
License Date: 1950-12-01
License Status: Abandoned
Spud Date: 1950-12-04
Final Drill Date: 1950-12-15
Well Total Depth: 972.30 m
Surface Hole Latitude: 53.845198
Surface Hole Longitude: -112.966366

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-12-01 Obtained License
1950-12-12 Production Casing Operation Performed
1950-12-15 Finished Drilling
1950-12-15 Perforation Treatment Performed - Open-Hole Completion
1950-12-15 Well Mode changed to Drilled and Cased
1950-12-16 Well Began Production
1950-12-16 Well Fluid changed to Crude Oil
1950-12-16 Well Mode changed to Flowing
1951-07-10 Well Fluid changed to Crude Oil
1951-07-10 Well Mode changed to Pumping
1990-12-01 Well Fluid changed to Crude Oil
1990-12-01 Well Mode changed to Suspended
1996-09-01 Well Fluid changed to Crude Oil
1996-09-01 Well Mode changed to Pumping
1996-09-10 Well Log Performed
1997-04-01 Well Fluid changed to Crude Oil
1997-04-01 Well Mode changed to Suspended
1997-04-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-04-08 Perforation Treatment Performed - Jet Perforation
1997-04-08 Plug Back Performed
1997-06-10 Perforation Treatment Performed - Remedial Casing
1999-04-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-04-08 Well Log Performed
1999-05-31 Well Abandoned
1999-05-31 Well Fluid changed to Crude Oil
1999-05-31 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-12-15 Open Hole/Barefoot Completion 947.90 972.30 0
1997-04-08 Packing Device Capped w/Cement 936.00 944.00 0
1997-04-08 Perforation 215.00 216.00 13
1997-06-10 Remedial Casing Cementing 215.00 216.00 0
1999-04-07 Packing Device Capped w/Cement 150.00 225.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 5129 0.0 0.0 0.0
1968 5965 0.0 0.0 0.0
1969 6463 0.0 0.0 0.0
1970 5905 0.0 0.0 0.0
1971 5144 0.0 0.0 0.0
1972 7172 0.0 0.0 0.0
1973 8387 0.0 0.0 0.0
1974 8143 0.0 0.0 0.0
1975 7615 0.0 0.0 0.0
1976 7747 0.0 0.0 0.0
1977 7837 0.0 0.0 0.0
1978 7747 0.0 0.0 0.0
1979 8308 0.0 0.0 0.0
1980 8283 0.0 0.0 0.0
1981 8428 0.0 0.0 0.0
1982 7910 0.0 0.0 0.0
1983 8244 0.0 0.0 0.0
1984 8531 0.0 0.0 0.0
1985 8469 0.0 0.0 0.0
1986 8392 0.0 0.0 0.0
1987 8218 0.0 0.0 0.0
1988 7596 0.0 0.0 0.0
1989 4920 0.0 0.0 0.0
1996 804 0.0 0.0 0.0

For data sources see[5]

References