X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564212401002

Well Details

Well ID: 0564212401002
Loading map...
Location: 00/01-24-056-21W4/2
Location Alias: 00/01-24-56-21 W4M
Location Alias 2: 00/01-24-056-21 W4/02
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 21
Section: 24
County/Municipality: Strathcona County
Well Name: ACCEL HOLDINGS REDWATER 1-24-56-21
Operator Name: ACCEL Canada Holdings Limited
License Number: 0001852
License Date: 1950-08-08
License Status: Issued
Spud Date: 1950-10-29
Final Drill Date: 1950-11-12
Well Total Depth: 993.60 m
Surface Hole Latitude: 53.848900
Surface Hole Longitude: -112.978980

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-08-08 Obtained License
1950-11-09 Production Casing Operation Performed
1950-11-12 Finished Drilling
1950-11-12 Perforation Treatment Performed - Open-Hole Completion
1950-11-12 Well Mode changed to Drilled and Cased
1950-11-14 Perforation Treatment Performed - Acid Wash - No Pressure
1984-02-20 Perforation Treatment Performed - Cement Plug
1984-02-20 Perforation Treatment Performed - Open-Hole Completion
1984-02-20 Plug Back Performed
1988-08-05 Well Log Performed
1988-08-08 Well Log Performed
1993-09-08 Well Log Performed
2000-05-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-05-11 Plug Back Performed
2000-05-12 Perforation Treatment Performed - Jet Perforation
2000-05-12 Well Log Performed
2000-05-12 Well Mode changed to Drilled and Cased
2000-08-10 Perforation Treatment Performed - Fractured
2000-08-17 Well Began Production
2000-08-17 Well Fluid changed to Crude Oil
2000-08-17 Well Mode changed to Pumping
2011-08-04 Perforation Treatment Performed - Chemical Squeeze

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-11-12 Open Hole/Barefoot Completion 951.60 983.00 0
1950-11-14 Acid Wash 951.60 983.00 0
1984-02-20 Cement Plug 958.40 983.00 0
1984-02-20 Open Hole/Barefoot Completion 951.60 958.40 0
2000-05-11 Packing Device Capped w/Cement 947.00 993.60 0
2000-05-12 Perforation 646.50 652.50 14
2000-08-10 Fracture 646.50 652.50 0
2011-08-04 Chemical Squeeze 646.50 652.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 3295 0.0 0.0 0.0
2001 8391 0.0 0.0 0.0
2002 7629 0.0 0.0 0.0
2003 8369 0.0 0.0 0.0
2004 8569 0.0 0.0 0.0
2005 8332 0.0 0.0 0.0
2006 8689 0.0 0.0 0.0
2007 8159 0.0 0.0 0.0
2008 6669 0.0 0.0 0.0
2009 8272 0.0 0.0 0.0
2010 8431 0.0 0.0 0.0
2011 6213 0.0 0.0 0.0
2012 8711 0.0 0.0 0.0
2013 8175 0.0 0.0 0.0
2014 8011 0.0 0.0 0.0
2015 7960 0.0 0.0 0.0
2016 7476 0.0 0.0 0.0
2017 8133 0.0 0.0 0.0
2018 1073 0.0 0.0 0.0

For data sources see[5]

References