X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564213408000

Well Details

Well ID: 0564213408000
Loading map...
Location: 00/08-34-056-21W4/0
Location Alias: 00/08-34-56-21 W4M
Location Alias 2: 00/08-34-056-21 W4/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 21
Section: 34
County/Municipality: Sturgeon County
Well Name: PENNWEST REDWATER 8-34-56-21
Operator Name: Obsidian Energy Ltd.
License Number: 0001204
License Date: 1950-02-24
License Status: RecExempt
Spud Date: 1950-03-05
Final Drill Date: 1950-03-15
Well Total Depth: 985.70 m
Surface Hole Latitude: 53.881674
Surface Hole Longitude: -113.028489

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-02-24 Obtained License
1950-03-15 Drill Stem Test Performed
1950-03-15 Finished Drilling
1950-03-15 Well Mode changed to Drilled and Cased
1950-03-17 Perforation Treatment Performed - Bullet Perforation
1950-03-17 Perforation Treatment Performed - Open-Hole Completion
1950-03-17 Production Casing Operation Performed
1950-08-10 Well Began Production
1950-08-10 Well Fluid changed to Crude Oil
1950-08-10 Well Mode changed to Pumping
1986-06-01 Well Fluid changed to Crude Oil
1986-06-01 Well Mode changed to Suspended
1994-06-08 Well Fluid changed to Crude Oil
1994-06-08 Well Mode changed to Pumping
1996-03-28 Well Fluid changed to Crude Oil
1996-03-28 Well Mode changed to Suspended
1999-07-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-07-23 Plug Back Performed
2000-05-24 Well Log Performed
2000-06-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-06-12 Well Abandoned
2000-06-12 Well Fluid changed to Crude Oil
2000-06-12 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-03-17 Open Hole/Barefoot Completion 953.40 985.70 0
1950-03-17 Bullet Perforation 980.80 982.70 13
1950-03-17 Bullet Perforation 976.00 977.80 13
1950-03-17 Bullet Perforation 971.10 972.90 13
1950-03-17 Bullet Perforation 966.20 968.00 13
1950-03-17 Bullet Perforation 960.10 961.90 13
1999-07-23 Packing Device Capped w/Cement 937.00 945.00 0
2000-06-03 Packing Device Capped w/Cement 215.00 273.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1973 1785 0.0 0.0 0.0
1974 5838 0.0 0.0 0.0
1975 3349 0.0 0.0 0.0
1976 3648 0.0 0.0 0.0
1977 3837 0.0 0.0 0.0
1978 4282 0.0 0.0 0.0
1979 7394 0.0 0.0 0.0
1980 7331 0.0 0.0 0.0
1981 8067 0.0 0.0 0.0
1982 8184 0.0 0.0 0.0
1983 8539 0.0 0.0 0.0
1984 8433 0.0 0.0 0.0
1985 5342 0.0 0.0 0.0
1986 686 0.0 0.0 0.0
1994 4892 0.0 0.0 0.0
1995 3896 0.0 0.0 0.0

For data sources see[5]

References