X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564213508000

Well Details

Well ID: 0564213508000
Loading map...
Location: 00/08-35-056-21W4/0
Location Alias: 00/08-35-56-21 W4M
Location Alias 2: 00/08-35-056-21 W4/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 21
Section: 35
County/Municipality: Sturgeon County
Well Name: TRIAD REDWATER 8-35-56-21
Operator Name: Imperial Oil Resources Limited
License Number: 0001712
License Date: 1950-07-06
License Status: RecCertified
Spud Date: 1950-07-06
Final Drill Date: 1950-07-17
Well Total Depth: 970.20 m
Surface Hole Latitude: 53.881379
Surface Hole Longitude: -113.003563

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-07-01 Perforation Treatment Performed - Acid Wash - No Pressure
1950-07-01 Perforation Treatment Performed - Open-Hole Completion
1950-07-06 Obtained License
1950-07-12 Production Casing Operation Performed
1950-07-17 Finished Drilling
1950-07-17 Well Mode changed to Drilled and Cased
1950-07-19 Well Began Production
1950-07-19 Well Fluid changed to Crude Oil
1950-07-19 Well Mode changed to Flowing
1951-07-04 Well Fluid changed to Crude Oil
1951-07-04 Well Mode changed to Pumping
1995-08-01 Well Fluid changed to Crude Oil
1995-08-01 Well Mode changed to Suspended
1996-03-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-03-04 Perforation Treatment Performed - Jet Perforation
1996-03-04 Perforation Treatment Performed - Remedial Casing
1996-03-04 Plug Back Performed
1996-03-04 Well Fluid changed to Crude Oil
1996-03-04 Well Mode changed to Abandoned Zone
1996-04-27 Well Abandoned
1996-04-27 Well Fluid changed to Crude Oil
1996-04-27 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-07-01 Open Hole/Barefoot Completion 927.20 970.20 0
1950-07-01 Acid Wash 927.20 970.20 0
1996-03-04 Packing Device Capped w/Cement 906.00 914.00 0
1996-03-04 Perforation 215.00 216.00 7
1996-03-04 Remedial Casing Cementing 215.00 216.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1972 640 0.0 0.0 0.0
1973 7952 0.0 0.0 0.0
1974 6600 0.0 0.0 0.0
1975 4645 0.0 0.0 0.0
1976 7552 0.0 0.0 0.0
1977 7161 0.0 0.0 0.0
1978 7809 0.0 0.0 0.0
1979 7833 0.0 0.0 0.0
1980 5160 0.0 0.0 0.0
1981 7918 0.0 0.0 0.0
1982 8260 0.0 0.0 0.0
1983 8668 0.0 0.0 0.0
1984 8343 0.0 0.0 0.0
1985 7867 0.0 0.0 0.0
1986 8528 0.0 0.0 0.0
1987 8643 0.0 0.0 0.0
1988 8413 0.0 0.0 0.0
1989 8540 0.0 0.0 0.0
1990 8420 0.0 0.0 0.0
1991 8673 0.0 0.0 0.0
1992 8477 0.0 0.0 0.0
1993 8712 0.0 0.0 0.0
1994 4525 0.0 0.0 0.0

For data sources see[5]

References