X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564240315002

Well Details

Well ID: 0564240315002
Loading map...
Location: 00/15-03-056-24W4/2
Location Alias: 00/15-03-56-24 W4M
Location Alias 2: 00/15-03-056-24 W4/02
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 24
Section: 03
County/Municipality: Sturgeon County
Well Name: DORSET EXCELSIOR 15-3-56-24
Operator Name: Baytex Energy Ltd.
License Number: 0001846
License Date: 1950-08-05
License Status: Suspension
Spud Date: 1950-08-09
Final Drill Date: 1950-08-23
Well Total Depth: 1205.50 m
Surface Hole Latitude: 53.816398
Surface Hole Longitude: -113.480619

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-08-05 Obtained License
1950-08-23 Finished Drilling
1950-08-23 Well Mode changed to Drilled and Cased
1950-08-24 Production Casing Operation Performed
1950-08-25 Perforation Treatment Performed - Bullet Perforation
1950-08-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-12-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-10-30 Perforation Treatment Performed - Jet Perforation
1969-10-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-01-07 Perforation Treatment Performed - Cement Squeeze
1975-01-09 Perforation Treatment Performed - Cement Squeeze
1979-07-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-02-06 Perforation Treatment Performed - Cement Plug
1980-02-07 Perforation Treatment Performed - Jet Perforation
1988-10-13 Well Log Performed
1991-11-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-11-04 Plug Back Performed
1991-11-05 Perforation Treatment Performed - Jet Perforation
1991-12-04 Well Log Performed
1991-12-05 Well Log Performed
1991-12-21 Well Began Production
1991-12-21 Well Fluid changed to Crude Oil
1991-12-21 Well Mode changed to Pumping
1994-04-07 Well Log Performed
1994-04-08 Well Log Performed
1994-04-28 Well Began Injection
1994-04-28 Well Fluid changed to Water
1994-04-28 Well Type changed to Injection
2008-11-30 Well Fluid changed to Water
2008-11-30 Well Mode changed to Suspended
2008-11-30 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-08-25 Bullet Perforation 1169.80 1190.20 7
1980-02-07 Perforation 1162.20 1163.20 13
1980-02-07 Perforation 1164.70 1166.70 13
1991-11-04 Packing Device Capped w/Cement 1140.00 1148.00 0
1991-11-05 Perforation 1126.70 1130.40 13
1950-08-26 Acid Treatment 1169.80 1190.20 0
1959-12-16 Acid Treatment 1169.80 1190.20 0
1969-10-30 Perforation 1164.90 1171.00 7
1969-10-31 Acid Treatment 1164.90 1171.00 0
1975-01-07 Cement Squeeze 1171.00 1190.20 0
1975-01-09 Cement Squeeze 1171.00 1190.20 0
1979-07-12 Acid Treatment 1164.90 1171.00 6
1980-02-06 Cement Plug 1167.00 1171.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 250 0.0 0.0 0.0
1992 6677 0.0 0.0 0.0
1993 5361 0.0 0.0 0.0
1994 504 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0

For data sources see[5]

References