X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564240316000

Well Details

Well ID: 0564240316000
Loading map...
Location: 00/16-03-056-24W4/0
Location Alias: 00/16-03-56-24 W4M
Location Alias 2: 00/16-03-056-24 W4/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 24
Section: 03
County/Municipality: Sturgeon County
Well Name: DORSET EXCELSIOR 16-3N-56-24
Operator Name: Baytex Energy Ltd.
License Number: 0001338
License Date: 1950-04-05
License Status: Suspension
Spud Date: 1950-05-13
Final Drill Date: 1950-05-27
Well Total Depth: 1197.30 m
Surface Hole Latitude: 53.816364
Surface Hole Longitude: -113.474507

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-04-05 Obtained License
1950-05-27 Drill Stem Test Performed
1950-05-27 Finished Drilling
1950-05-27 Well Mode changed to Drilled and Cased
1950-05-28 Production Casing Operation Performed
1950-05-30 Perforation Treatment Performed - Acid Wash - No Pressure
1950-05-30 Perforation Treatment Performed - Bullet Perforation
1950-05-31 Well Began Production
1950-05-31 Well Fluid changed to Crude Oil
1950-05-31 Well Mode changed to Flowing
1973-01-08 Well Fluid changed to Crude Oil
1973-01-08 Well Mode changed to Pumping
1979-11-01 Perforation Treatment Performed - Jet Perforation
1979-11-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-11-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-11-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-10-01 Well Fluid changed to Crude Oil
2008-10-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-05-30 Bullet Perforation 1175.00 1187.50 7
1950-05-30 Acid Wash 1175.00 1187.50 0
1979-11-01 Perforation 1169.00 1173.00 7
1979-11-02 Acid Treatment 1169.00 1173.00 0
1979-11-07 Packing Device Capped w/Cement 1173.00 1178.50 0
1979-11-08 Acid Treatment 1169.00 1173.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1972 606 0.0 0.0 0.0
1973 4642 0.0 0.0 0.0
1974 3930 0.0 0.0 0.0
1975 6361 0.0 0.0 0.0
1976 7892 0.0 0.0 0.0
1977 7971 0.0 0.0 0.0
1978 8279 0.0 0.0 0.0
1979 8011 0.0 0.0 0.0
1980 7879 0.0 0.0 0.0
1981 7557 0.0 0.0 0.0
1982 8114 0.0 0.0 0.0
1983 8163 0.0 0.0 0.0
1984 8465 0.0 0.0 0.0
1985 8597 0.0 0.0 0.0
1986 8015 0.0 0.0 0.0
1987 8652 0.0 0.0 0.0
1988 8696 0.0 0.0 0.0
1989 8458 0.0 0.0 0.0
1990 7073 0.0 0.0 0.0
1991 4084 0.0 0.0 0.0
1992 8500 0.0 0.0 0.0
1993 8262 0.0 0.0 0.0
1994 8268 0.0 0.0 0.0
1995 8216 0.0 0.0 0.0
1996 8348 0.0 0.0 0.0
1997 8606 0.0 0.0 0.0
1998 8312 0.0 0.0 0.0
1999 8277 0.0 0.0 0.0
2000 8421 0.0 0.0 0.0
2001 8320 0.0 0.0 0.0
2002 8548 0.0 0.0 0.0
2003 8510 0.0 0.0 0.0
2004 8529 0.0 0.0 0.0
2005 8638 0.0 0.0 0.0
2006 7775 0.0 0.0 0.0
2007 3635 0.0 0.0 0.0
2008 12 0.0 0.0 0.0

For data sources see[5]

References