X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564241011032

Well Details

Well ID: 0564241011032
Loading map...
Location: 03/11-10-056-24W4/2
Location Alias: 03/11-10-56-24 W4M
Location Alias 2: 03/11-10-056-24 W4/02
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 24
Section: 10
County/Municipality: Sturgeon County
Well Name: DORSET EXCELSIOR 11-10-56-24
Operator Name: Baytex Energy Ltd.
License Number: 0169020
License Date: 1994-07-27
License Status: Issued
Spud Date: 1994-09-09
Final Drill Date: 1994-09-14
Well Total Depth: 1187.00 m
Surface Hole Latitude: 53.828119
Surface Hole Longitude: -113.485693

For data sources see[1][2]

Well History

Date Event
1994-07-27 Obtained License
1994-09-10 Surface Casing Operation Performed
1994-09-14 Finished Drilling
1994-09-14 Well Mode changed to Drilled and Cased
1994-09-15 Drill Stem Test Performed
1994-09-15 Well Log Performed
1994-09-16 Production Casing Operation Performed
1994-09-16 Rig Released
1994-11-23 Perforation Treatment Performed - Jet Perforation
1994-11-23 Well Log Performed
1994-11-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-11-24 Perforation Treatment Performed - Jet Perforation
1994-11-24 Well Log Performed
2001-12-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-12-15 Perforation Treatment Performed - Jet Perforation
2001-12-15 Well Log Performed
2002-01-16 Well Began Production
2002-01-16 Well Fluid changed to Gas
2002-01-16 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-11-23 Perforation 1117.00 1120.00 13
1994-11-24 Packing Device Capped w/Cement 1099.00 1107.00 0
1994-11-24 Perforation 1051.00 1052.00 13
1994-11-24 Perforation 1053.30 1055.00 13
1994-11-24 Perforation 1049.00 1050.00 13
2001-12-15 Packing Device Capped w/Cement 1035.00 1043.00 0
2001-12-15 Perforation 979.50 983.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 8369 0.0 0.0 0.0
2003 8753 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8698 0.0 0.0 0.0
2008 8018 0.0 0.0 0.0
2009 8537 0.0 0.0 0.0
2010 8533 0.0 0.0 0.0
2011 8703 0.0 0.0 0.0
2012 8680 0.0 0.0 0.0
2013 7814 0.0 0.0 0.0
2014 8570 0.0 0.0 0.0
2015 8726 0.0 0.0 0.0
2016 8753 0.0 0.0 0.0
2017 8735 0.0 0.0 0.0
2018 8675 0.0 0.0 0.0
2019 8748 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References