X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564242601000

Well Details

Well ID: 0564242601000
Loading map...
Location: 00/01-26-056-24W4/0
Location Alias: 00/01-26-56-24 W4M
Location Alias 2: 00/01-26-056-24 W4/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 24
Section: 26
County/Municipality: Sturgeon County
Well Name: DORSET FBA 1-26-56-24
Operator Name: Baytex Energy Ltd.
License Number: 0078580
License Date: 1979-10-12
License Status: RecCertified
Spud Date: 1979-11-09
Final Drill Date: 1979-11-17
Well Total Depth: 1139.00 m
Surface Hole Latitude: 53.865044
Surface Hole Longitude: -113.452079

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-10-12 Obtained License
1979-11-17 Finished Drilling
1979-11-17 Well Mode changed to Drilled and Cased
1979-11-20 Drill Stem Test Performed
1979-11-21 Drill Stem Test Performed
1979-11-22 Drill Stem Test Performed
1979-11-23 Production Casing Operation Performed
1979-12-17 Perforation Treatment Performed - Jet Perforation
1979-12-20 Perforation Treatment Performed - Jet Perforation
1980-01-06 Perforation Treatment Performed - Cement Squeeze
1980-01-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-01-17 Perforation Treatment Performed - Jet Perforation
1980-01-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-02-26 Well Began Production
1980-02-26 Well Fluid changed to Crude Oil
1980-02-26 Well Mode changed to Pumping
1984-03-01 Well Fluid changed to Crude Oil
1984-03-01 Well Mode changed to Suspended
1994-05-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-05-18 Plug Back Performed
1994-05-18 Well Fluid changed to Crude Oil
1994-05-18 Well Mode changed to Abandoned
1994-05-19 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-12-17 Perforation 1066.00 1068.50 7
1980-01-17 Perforation 1071.50 1073.50 7
1980-01-20 Acid Treatment 1066.00 1073.50 0
1994-05-18 Packing Device Capped w/Cement 1050.00 1058.00 0
1994-05-18 Packing Device Capped w/Cement 1036.00 1044.00 0
1979-12-17 Perforation 1069.00 1070.50 7
1979-12-17 Perforation 1071.50 1073.50 7
1979-12-20 Perforation 1049.00 1051.00 7
1979-12-20 Perforation 1054.50 1058.00 7
1980-01-06 Cement Squeeze 1049.00 1058.00 0
1980-01-16 Acid Treatment 1066.00 1073.50 0
1980-01-17 Perforation 1066.00 1068.50 7
1980-01-17 Perforation 1069.00 1070.50 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 4319 0.0 0.0 0.0
1981 5088 0.0 0.0 0.0

For data sources see[5]

References