X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564242910000

Well Details

Well ID: 0564242910000
Loading map...
Location: 00/10-29-056-24W4/0
Location Alias: 00/10-29-56-24 W4M
Location Alias 2: 00/10-29-056-24 W4/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 24
Section: 29
County/Municipality: Sturgeon County
Well Name: DORSET PEAVEY 10-29-56-24
Operator Name: Baytex Energy Ltd.
License Number: 0005498
License Date: 1952-10-15
License Status: RecCertified
Spud Date: 1952-10-25
Final Drill Date: 1952-11-02
Well Total Depth: 1081.40 m
Surface Hole Latitude: 53.870999
Surface Hole Longitude: -113.530269

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-10-15 Obtained License
1952-11-01 Drill Stem Test Performed
1952-11-02 Drill Stem Test Performed
1952-11-02 Finished Drilling
1952-11-02 Production Casing Operation Performed
1952-11-02 Well Mode changed to Drilled and Cased
1952-11-04 Perforation Treatment Performed - Bullet Perforation
1952-11-24 Well Began Production
1952-11-24 Well Fluid changed to Crude Oil
1952-11-24 Well Mode changed to Pumping
1952-12-21 Perforation Treatment Performed - Acid Wash - No Pressure
1952-12-21 Perforation Treatment Performed - Jet Perforation
1952-12-22 Perforation Treatment Performed - Cement Squeeze
1952-12-31 Perforation Treatment Performed - Jet Perforation
1953-04-25 Perforation Treatment Performed - Bullet Perforation
1953-12-17 Well Fluid changed to Crude Oil
1953-12-17 Well Mode changed to Suspended
1963-11-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-12-05 Well Began Injection
1963-12-05 Well Fluid changed to Water
1963-12-05 Well Type changed to Injection
1972-02-04 Perforation Treatment Performed - Acid Wash - No Pressure
1972-02-19 Perforation Treatment Performed - Acid Wash - No Pressure
1978-08-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-05-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-12-05 Perforation Treatment Performed - Cement Plug
1988-12-05 Plug Back Performed
1988-12-05 Well Abandoned
1988-12-05 Well Fluid changed to Water
1988-12-05 Well Mode changed to Abandoned
1988-12-05 Well Type changed to Injection
1988-12-06 Perforation Treatment Performed - Jet Perforation
1988-12-07 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-11-04 Bullet Perforation 1066.50 1067.10 13
1978-08-16 Acid Treatment 1065.60 1067.10 0
1981-05-20 Acid Treatment 1065.60 1067.10 0
1988-12-05 Cement Plug 719.00 985.00 0
1988-12-06 Perforation 210.00 210.30 13
1988-12-07 Remedial Casing Cementing 210.00 210.30 0
1952-12-21 Perforation 1065.00 1065.60 13
1952-12-21 Acid Wash 1065.00 1065.60 0
1952-12-22 Cement Squeeze 1065.00 1065.60 0
1952-12-31 Perforation 1066.50 1067.10 7
1953-04-25 Bullet Perforation 1065.60 1066.80 20
1963-11-16 Acid Treatment 1065.60 1067.10 0
1972-02-04 Acid Wash 1039.70 1066.80 0
1972-02-19 Acid Wash 1065.60 1067.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0

For data sources see[5]

References