X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564243010000

Well Details

Well ID: 0564243010000
Loading map...
Location: 00/10-30-056-24W4/0
Location Alias: 00/10-30-56-24 W4M
Location Alias 2: 00/10-30-056-24 W4/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 24
Section: 30
County/Municipality: Sturgeon County
Well Name: DORSET EXCELSIOR 10-30V-56-24
Operator Name: Baytex Energy Ltd.
License Number: 0003721
License Date: 1951-11-03
License Status: RecExempt
Spud Date: 1951-11-14
Final Drill Date: 1951-12-11
Well Total Depth: 1143.00 m
Surface Hole Latitude: 53.869490
Surface Hole Longitude: -113.555180

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-11-03 Obtained License
1951-11-23 Drill Stem Test Performed
1951-11-24 Drill Stem Test Performed
1951-11-26 Drill Stem Test Performed
1951-11-27 Drill Stem Test Performed
1951-12-01 Drill Stem Test Performed
1951-12-04 Drill Stem Test Performed
1951-12-06 Drill Stem Test Performed
1951-12-07 Drill Stem Test Performed
1951-12-08 Drill Stem Test Performed
1951-12-09 Drill Stem Test Performed
1951-12-10 Drill Stem Test Performed
1951-12-11 Finished Drilling
1951-12-11 Well Mode changed to Drilled and Cased
1951-12-14 Production Casing Operation Performed
1952-01-27 Perforation Treatment Performed - Jet Perforation
1952-01-30 Drill Stem Test Performed
1952-01-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1952-02-01 Drill Stem Test Performed
1952-02-01 Perforation Treatment Performed - Cement Squeeze
1952-02-01 Perforation Treatment Performed - Jet Perforation
1952-02-03 Drill Stem Test Performed
1952-02-03 Perforation Treatment Performed - Bullet Perforation
1952-02-04 Perforation Treatment Performed - Cement Squeeze
1952-02-05 Perforation Treatment Performed - Bullet Perforation
1952-02-16 Well Began Production
1952-02-16 Well Fluid changed to Crude Oil
1952-02-16 Well Mode changed to Pumping
1952-03-21 Perforation Treatment Performed - Cement Squeeze
1952-03-22 Perforation Treatment Performed - Bullet Perforation
1952-03-24 Perforation Treatment Performed - Cement Squeeze
1952-03-24 Well Fluid changed to Crude Oil
1952-03-24 Well Mode changed to Suspended
1954-11-23 Well Abandoned
1954-11-23 Well Fluid changed to Crude Oil
1954-11-23 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-01-27 Perforation 972.60 973.80 13
1952-03-24 Cement Squeeze 851.60 852.20 0
1952-01-30 Packing Device Capped w/Cement 970.80 970.80 0
1952-02-01 Perforation 966.50 968.00 13
1952-02-01 Cement Squeeze 966.50 968.00 0
1952-02-03 Bullet Perforation 959.50 960.70 13
1952-02-04 Cement Squeeze 959.50 960.70 0
1952-02-05 Bullet Perforation 860.50 861.70 13
1952-03-21 Cement Squeeze 860.50 861.70 0
1952-03-22 Bullet Perforation 851.60 852.20 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References