X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565093510000

Well Details

Well ID: 0565093510000
Loading map...
Location: 00/10-35-056-09W5/0
Location Alias: 00/10-35-56-09 W5M
Location Alias 2: 00/10-35-056-09 W5/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 09
Section: 35
County/Municipality: Lac Ste. Anne County
Well Name: TENN PADDLE RIVER IN 10-35-56-9
Operator Name: CNOOC Petroleum North America ULC
License Number: 0025104
License Date: 1963-11-12
License Status: RecCertified
Spud Date: 1963-11-21
Final Drill Date: 1963-12-07
Well Total Depth: 1603.20 m
Surface Hole Latitude: 53.884318
Surface Hole Longitude: -115.224996

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-11-12 Obtained License
1963-12-03 Drill Stem Test Performed
1963-12-04 Lost Circulation Occurred
1963-12-06 Drill Stem Test Performed
1963-12-07 Finished Drilling
1963-12-08 Production Casing Operation Performed
1964-01-24 Perforation Treatment Performed - Jet Perforation
1964-01-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-02-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1964-07-10 Well Mode changed to Drilled and Cased
1967-03-11 Perforation Treatment Performed - Cement Squeeze
1967-03-13 Perforation Treatment Performed - Jet Perforation
1967-03-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-03-23 Well Began Injection
1967-03-23 Well Fluid changed to Water
1967-03-23 Well Type changed to Disposal
1968-11-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-07-05 Well Log Performed
1988-07-08 Well Log Performed
1989-08-01 Perforation Treatment Performed - Cement Squeeze
1989-08-01 Plug Back Performed
1989-08-01 Well Fluid changed to Water
1989-08-01 Well Mode changed to Abandoned
1989-08-01 Well Type changed to Disposal
1989-08-02 Well Log Performed
1989-08-03 Perforation Treatment Performed - Cement Plug
1989-08-03 Plug Back Performed
1989-08-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-08-04 Plug Back Performed
1989-08-04 Well Abandoned
1989-08-04 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-01-24 Perforation 1574.00 1574.90 10
1989-08-04 Packing Device Capped w/Cement 544.50 552.50 0
1964-01-25 Acid Treatment 1574.00 1574.90 0
1964-02-06 Packing Device Capped w/Cement 1570.00 1572.50 0
1967-03-11 Cement Squeeze 1574.00 1574.90 0
1967-03-13 Perforation 1578.90 1586.80 13
1967-03-14 Acid Treatment 1578.90 1586.80 0
1968-11-14 Acid Treatment 1578.90 1586.80 0
1989-08-01 Cement Squeeze 1578.90 1586.80 0
1989-08-03 Cement Plug 580.00 1490.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1963-12-04 Lost Circulation 1574.90 1574.90

For data sources see[6]

References