X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565132002002

Well Details

Well ID: 0565132002002
Loading map...
Location: 00/02-20-056-13W5/2
Location Alias: 00/02-20-56-13 W5M
Location Alias 2: 00/02-20-056-13 W5/02
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 13
Section: 20
County/Municipality: Yellowhead County
Well Name: PINE CLIFF MCLEOD 2-20-56-13
Operator Name: Vermilion Energy Inc.
License Number: 0330683
License Date: 2005-05-09
License Status: Suspension
Spud Date: 2005-06-02
Final Drill Date: 2005-06-12
Well Total Depth: 1939.00 m
Surface Hole Latitude: 53.849779
Surface Hole Longitude: -115.893319

For data sources see[1][2]

Well History

Date Event
2005-05-09 Obtained License
2005-05-13 Well Log Performed
2005-06-03 Surface Casing Operation Performed
2005-06-12 Finished Drilling
2005-06-12 Well Log Performed
2005-06-12 Well Mode changed to Drilled and Cased
2005-06-13 Well Log Performed
2005-06-14 Production Casing Operation Performed
2005-06-14 Rig Released
2005-07-24 Well Log Performed
2005-07-25 Perforation Treatment Performed - Jet Perforation
2005-07-25 Well Log Performed
2005-07-28 Perforation Treatment Performed - Jet Perforation
2005-08-27 Perforation Treatment Performed - Jet Perforation
2005-08-27 Well Log Performed
2005-08-29 Perforation Treatment Performed - Jet Perforation
2005-08-29 Well Log Performed
2005-09-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-09-09 Plug Back Performed
2005-09-09 Well Log Performed
2005-09-10 Perforation Treatment Performed - Jet Perforation
2005-09-10 Well Log Performed
2005-10-25 Well Began Production
2005-10-25 Well Fluid changed to Crude Oil
2005-10-25 Well Mode changed to Pumping
2012-03-01 Well Fluid changed to Crude Oil
2012-03-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-07-25 Perforation 1885.30 1886.80 17
2005-07-28 Perforation 1885.30 1886.80 17
2005-08-27 Perforation 1898.00 1899.00 17
2005-08-29 Perforation 1875.00 1876.00 17
2005-09-09 Packing Device Capped w/Cement 1852.00 1860.00 0
2005-09-10 Perforation 971.30 972.70 17
2005-09-10 Perforation 965.70 969.20 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 1572 0.0 0.0 0.0
2006 8251 0.0 0.0 0.0
2007 7988 0.0 0.0 0.0
2008 5103 0.0 0.0 0.0
2009 1274 0.0 0.0 0.0
2010 2063 0.0 0.0 0.0

For data sources see[5]

References