0574210313000

Well Details

Well ID: 0574210313000
Loading map...
Location: 00/13-03-057-21W4/0
Location Alias: 00/13-03-57-21 W4M
Location Alias 2: 00/13-03-057-21 W4/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 4
Range: 21
Section: 03
County/Municipality: Sturgeon County
Well Name: ACCEL HOLDINGS REDWATER 13-3-57-21
Operator Name: ACCEL Canada Holdings Limited
License Number: 0000494
License Date: 1949-08-23
License Status: Abandoned
Spud Date: 1949-09-04
Final Drill Date: 1949-09-18
Well Total Depth: 997.60 m
Surface Hole Latitude: 53.903546
Surface Hole Longitude: -113.046921

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-08-23 Obtained License
1949-09-13 Production Casing Operation Performed
1949-09-18 Finished Drilling
1949-09-18 Perforation Treatment Performed - Open-Hole Completion
1949-09-18 Well Mode changed to Drilled and Cased
1949-09-19 Well Began Production
1949-09-19 Well Fluid changed to Crude Oil
1949-09-19 Well Mode changed to Flowing
1951-01-01 Well Fluid changed to Crude Oil
1951-01-01 Well Mode changed to Pumping
1978-10-26 Perforation Treatment Performed - Jet Perforation
1986-04-30 Well Fluid changed to Crude Oil
1986-04-30 Well Mode changed to Suspended
1996-03-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-03-04 Plug Back Performed
1996-03-19 Perforation Treatment Performed - Jet Perforation
1996-04-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-04-26 Perforation Treatment Performed - Remedial Casing
1996-05-02 Well Abandoned
1996-05-02 Well Fluid changed to Crude Oil
1996-05-02 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-09-18 Open Hole/Barefoot Completion 967.80 997.60 0
1978-10-26 Perforation 960.70 966.80 13
1996-03-04 Packing Device Capped w/Cement 951.60 959.60 0
1996-03-19 Perforation 220.00 221.00 7
1996-04-26 Remedial Casing Cementing 220.00 221.00 0
1996-04-26 Packing Device Capped w/Cement 149.00 226.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1977 1515 0.0 0.0 0.0
1978 8373 0.0 0.0 0.0
1979 7149 0.0 0.0 0.0
1980 8468 0.0 0.0 0.0
1981 8212 0.0 0.0 0.0
1982 8465 0.0 0.0 0.0
1983 8667 0.0 0.0 0.0
1984 8380 0.0 0.0 0.0
1985 8408 0.0 0.0 0.0
1986 1427 0.0 0.0 0.0
1990 554 0.0 0.0 0.0
1991 24 0.0 0.0 0.0

For data sources see[5]