If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0574210601000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.895717,"lon":-113.113775,"icon":""}]} |
Location: 00/01-06-057-21W4/0 | |
Location Alias: 00/01-06-57-21 W4M | |
Location Alias 2: 00/01-06-057-21 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 057 | |
Meridian: 4 | |
Range: 21 | |
Section: 06 | |
County/Municipality: Sturgeon County | |
Well Name: BAYTEX 1C2 HZ REDWATER 1-6-57-21 | |
Operator Name: Baytex Energy Ltd. | |
License Number: 0418752 | |
License Date: 2010-02-22 | |
License Status: Amended | |
Spud Date: 2010-06-25 | |
Final Drill Date: 2010-07-03 | |
Well Total Depth: 1423.30 m | |
Surface Hole Latitude: 53.895717 | |
Surface Hole Longitude: -113.113775 |
Date | Event |
---|---|
2010-02-22 | Obtained License |
2010-06-26 | Surface Casing Operation Performed |
2010-06-27 | Direction Drilling Operation Performed - Horizontal |
2010-06-27 | Well Log Performed |
2010-06-28 | Intermediate Casing Operation Performed |
2010-06-29 | Well Log Performed |
2010-07-03 | Finished Drilling |
2010-07-03 | Perforation Treatment Performed - Open-Hole Completion |
2010-07-03 | Rig Released |
2010-07-03 | Well Mode changed to Drilled and Cased |
2010-07-08 | Well Began Production |
2010-07-08 | Well Fluid changed to Crude Oil |
2010-07-08 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-06-27 | 502.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-07-03 | Open Hole/Barefoot Completion | 817.00 | 1423.30 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 4001 | 0.0 | 0.0 | 0.0 |
2011 | 8758 | 0.0 | 0.0 | 0.0 |
2012 | 8641 | 0.0 | 0.0 | 0.0 |
2013 | 8088 | 0.0 | 0.0 | 0.0 |
2014 | 8682 | 0.0 | 0.0 | 0.0 |
2015 | 8095 | 0.0 | 0.0 | 0.0 |
2016 | 8602 | 0.0 | 0.0 | 0.0 |
2017 | 8560 | 0.0 | 0.0 | 0.0 |
2018 | 8499 | 0.0 | 0.0 | 0.0 |
2019 | 8648 | 0.0 | 0.0 | 0.0 |
2020 | 2064 | 0.0 | 0.0 | 0.0 |
For data sources see[6]